Spotlight
Site Additions in 2002
On this page:
See also New on Our Site for current additions.
December 2002
December 23
The NRC staff issued Review Standard (RS)-001, "Review Standard for Extended Power Uprates," for interim use and public comment. For additional information on RS-001, see our Power Uprate web page.
December 19
NUREG-1764, Guidance for the Review of Changes to Human Actions - Draft Report for Comment
December 12
NUREG/CR-6738, Risk Methods Insights Gained From Fire Incidents
NUREG/CR-6776, Cable Insulation Resistance Measurements Made During Cable Fire Tests
November 2002
November 19
NUREG-1307 Rev. 10, Report on Waste Burial Charges
November 7
Added 15 collection searches and a full-text glossary.
October 2002
October 9
Chairman Meserve signed a Memorandum of Understanding with EPA for Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites.
October 1
Information Quality Guidelines: Seeking Correction to NRC Information
September 2002
September 20
The New Reactor Licensing Project Office peforms the overall safety and environmental project management for new site and reactor licensing.
Redesigned Rulemaking-RuleForum subsite
September 18
Public Meeting scheduled for October 3, 2002 to discuss recently published NRC Rule "Electronic Maintenance and Submission of Information: Final Rule and Proposed Rule"
For related information see Electronic Information Exchange
August 2002
August 26
Consolidation of Decommissioning License Termination Guidance
August 23
Draft Guidance for Electronic Submissions to the Commission
For related information see Electronic Information Exchange
August 19
The current Morning Report and the 1999 through 2002 archives of the Power Reactor Status Reports, Event Notification Reports, and Morning Reports.
July 2002
July 31
Idaho Spent Fuel Facility
July 25
July 18
Advanced Search and Help With Searching have been revised to clarify the use of upper- and lower-case letters when searching our web site.
June 2002
June 21
Recently Released Commission Documents
June 11
Web Site User Satisfaction Survey
May 2002
May 30
Event Notification
Report
Weekly
Information Report
- Reactors
- Maintenance Effectiveness
- Reactor Decommissioning - Additional Information
- What We Do
- NRC Library
- Additional Commission Documents (Commission Papers, Staff Requirements Memoranda, etc.)
- Additional ACRS Documents
- Additional ACNW Documents
- ACMUI Transcripts
- Additional Regulatory Guides
- Additional NUREGS
May 28
NUREG-1759, Supplement 1 "Safety Evaluation Report Related to the License Renewal of Turkey Point Nuclear Plant, Units 3 and 4, Supplement 1"
May 14
Nuclear Security and Safeguards
May 10
Entire List of NRC/DOE Agreements
May 1
NUREG-0654, Rev. 1, Addenda "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants"
Draft Information
Quality Guidelines
The Nuclear Regulatory Commission (NRC) is requesting public comments
on its draft Information Quality (IQ) Guidelines until May 30, 2002.
April
April 25
NUREG-0750, "Nuclear Regulatory Commission Issuances, Hardbound Editions" (Volumes 46 - 53)
April 19
- Additional Document Collections in the NRC Library
April 18
NUREG-1437, Supplement 6, "Generic Environmental Impact Statement for License Renewal of Nuclear Power Plants, Regarding Surry Power Station, Units 1 and 2 (Draft Report for Comment)"
April 12
NUREG-1520, "Standard Review Plan for the Review of a License Application for a Fuel Cycle Facility"
April 2
NUREG/BR-0058, "Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory Commission
March 2002
March 29
- Additional Information on Nuclear Reactors
- Additional Information on Nuclear Materials
- Additional Document Collections in the NRC Library
- Additional Regulatory Guides
- Additional Generic Communications
- Additional ACRS Documents
- Additional ACNW Documents
- Enforcement Documents
- Inspection Manual
- Updated Site Index
March 28
NUREG-1725, "Human Interaction With Reused Soil: An Information Search"
NUREG/CR-6695, "Hydrologic Uncertainty Assessment for Decommissioning Sites: Hypothetical Test Case Applications"
March 22
- Division 8 Regulatory Guides
- Division 1 Regulatory Guides
- Yucca Mountain Review Plan, draft for comment
- ACRS Documents
- ACNW Documents
March 19
Call for Anticipatory Research
March 15
March 13
Reactor Vessel Head Degradation
March 1
The Nuclear Regulatory Commission is making available the Yucca Mountain Review Plan
February 2002
February 28
Release 4 is now available:
- Additional Sections of What We Do
- - Commission Activities
- How We Regulate - Rulemaking including Risk-Informing NRC's Regulations
- Guidance Development
- Generic Communications
- Standards Development
- - Congressional Affairs
- State and Tribal Programs
- International Programs
-
Regulations and Guidance
-
Oversight
-
Licensing and Certification
-
Operational Experience
-
Support for Decisions
- Additional Information on Nuclear Reactors
- - Operating Reactors
- Licensing - Power Uprates
- Operational Experience - Fitness for Duty
- - Operator Licensing - Generic Fundamentals Examinations
- Additional Information on Nuclear Materials
- - Sealed Source and Device
Registration
- Product Manufacturing and Distribution
- Medical Uses
- Veterinary Uses
- Industrial Uses
- Academic and Research Uses
- Exempt Consumer Product Uses
- Licensee Toolkits for all categories of materials licensees
- Orphan Sources
- Medical Use of Byproduct Material (Part 35)
- Additional Document Collections in the NRC Library
- - Electronic Hearing Docket
- Regulatory Issues Summaries issued in 2001
- Selected Regulatory Guides in Division 1
- Focused Search of 10 CFR Collection
- Additions to Site Index
- Updated Site Map
February 28
The State and Tribal Programs Web site has been modified to remove the need for a password to access the Sealed Sources and Devices portion of the site.
February 27
NRC Releases Its FY 2001 Performance and Accountability Report.
February 26
The Nuclear Regulatory Commission has issued Orders to all 104 commecial nuclear power plants to implement interim compensatory security measures.
February 15
Public Involvement in Enforcement. This site describes the various ways the public may get involved in the NRC's enforcement program. Of special note, NRC seeks comments on the use of Alternative Dispute resolution in the Enforcement program.
February 13
NUREG-0936, Vol. 20, No. 2, "U.S. NRC Semiannual Regulatory Agenda"
February 4
Budget Estimates and Performance Plan: Fiscal Year 2003
January 31
January 2002
Release 3 is now available:
- Additional Information on Nuclear Reactors
- Facility Information - Facility List, Project Manager List
- Licensing - Operator Licensing, Topical Reports
- Oversight - Reactor Oversight Process (Including Inspection Findings Summary, Performance Indicator Summary, and Action Matrix Summary)
- Operational Experience - Steam Generator Tube Integrity
- Additional Information on Radioactive Waste
- More on High-Level Waste Disposal
- Selected Sections of What We Do
- Allegations
- Licensing, including Topical Reports
- New Page in Site Help
- Additional Document Collections in the NRC Library
January 22
The Plant Assessment Results under the Reactor Oversight Process provide a plant-by-plant index to the most recent results, including inspection findings, performance indicators, assessment letters (with inspection plans), and inspection reports. The site also contains Comprehensive summaries showing the action matrix designation, inspection findings, and performance indicators for all operating reactors.
January 18
An advance paper copy of the Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI) License Application dated 12/21/01, Docket 72-26, including the Safety Analysis Report and Environmental Report, has been placed in the PDR. The paper copy is available for viewing and copying for a fee. The document can also be viewed in ADAMS (ML020180341).
"Nuclear Security in the Post-September 11 Environment," presented by Chairman Richard A. Meserve at the National Press Club on January 17, 2001.