United States Nuclear Regulatory Commission - Protecting People and the Environment

Advisory Committee on Reactor Safeguards (ACRS) 2012 Letter Reports

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title Response
07/23/2012 Final Safety Evaluation Report Associated with the Florida Power and Light St. Lucie, Unit 2, License Amendment Request for an Extended Power Rate  
07/19/2012 Draft Final NUREG-1934 (EPRI 1023259), “Nuclear Power Plant Fire Modeling Analysis Guidelines (NPP FIRE MAG)”  
07/17/2012 SECY-12-0081, “Risk-Informed Regulatory Framework for New Reactors”  
07/17/2012 Draft Interim Staff Guidance Documents in Support of Tier 1 Orders  
07/16/2012 Proposed Regulatory Guides DG-1282, DG-3042, and DG-1269 No Response Required
06/20/2012 Final Safety Evaluation Report Associated with the Florida Power and Light St. Lucie, Unit 1, License Amendment Request for an Extended Power Uprate

08/01/2012

06/19/2012 NRC Staff’s Draft Plans and Status Summaries for Tier 3 Japan Lessons Learned Recommendations

07/17/2012

06/18/2012 Grand Gulf Nuclear Station, Unit 1, Extended Power Uprate License Amendment Request

08/01/2012

06/18/2012 Proposed Revision 1 to Regulatory Guide 1.192, "Operation and Maintenance Code Case Acceptability, ASME OM Code"

07/24/2012

05/18/2012 Chapters 3, 9, 14, and 19 of the Safety Evaluation Report with Open Items Associated with the U.S. Evolutionary Power Rector Design Certification Application

06/18/2012

05/17/2012 Draft Final NUREG-1921, (EPRI Report 1023001),“EPRI/NRC-RES Fire Human Reliability Analysis Guidelines 

06/19/2012

05/15/2012 State-of-the-Art Reactor Consequence Analyses (SOARCA) Project  
05/14/2012 Withdrawal of Regulatory Guides 5.67 and 7.3 No Response Required
04/26/2012 Draft Commission Paper, “Risk-Informed Regulatory Framework for New Reactors” 05/30/2012
04/25/2012 Spent Fuel Pool Study 05/23/2012
04/25/2012 Response to the January 24, 2012, EDO Letter Regarding the Progress Energy Florida Combined License Application for Levy Nuclear Plant, Units 1 and 2

05/29/2012

04/25/2012 Chapters 6, 7, 15, and 18 of the Safety Evaluation Report with Open Items Associated with the Calvert Cliffs Nuclear Power Plant, Unit 3, Combined License Application

05/31/2012

04/24/2012 Report on the Safety Aspects of the License Renewal Application for the Columbia Generating Station 07/06/2012
04/23/2012 Extremely Low Probability of Rupture Project 05/30/2012
04/16/2012 Draft Final Regulatory Guide 4.20 No Response Required
04/16/2012 Proposed Regulatory Guides DG-5028 and DG-1279 No Response Required
04/16/2012 Disposition of the ACRS's Review of Draft 10 CFR 50.54(f) Letter on Implementation of the Near-Term Task Force Recommendations from the Fukushima Dai-Ichi Event  
04/03/2012 Review and Evaluation of the NRC Safety Research Program, NUREG-1635, Volume 10 

06/18/2012

03/20/2012 Report on the Final Safety Evaluation Report Associated With the Florida Power and Light Turkey Point Nuclear Plant Units 3 and 4 License Amendment Request for an Extended Power Uprate 04/09/2012
03/15/2012 Draft Final Regulatory Guide 1.82 No Response Required
03/15/2012 Chapters 6, 7, 11, 13, 15, 16, and 18 of the Safety Evaluation Report with Open Items Associated with the U.S. Evolutionary Power Reactor Design Certification Application

04/24/2012

03/14/2012 ACRS Review of Proposed Orders in Response to Fukushima Lessons Learned (SECY-12-0025) 07/06/2012
03/13/2012 Response to February 27, 2012 Letter Regarding Final Disposition of Fukushima-Related ACRS Recommendations in Letters dated October 13, 2011 and November 8, 2011

04/26/2012

02/16/2012 Draft Final Revision 1 to Regulatory Guide 1.93,"Availability of Electric Power Sources" 03/15/2012
02/15/2012 Draft 10 CFR 50.54(f) Letter on Implementation of the Near-Term Task Force Recommendations from the Fukushima Daiichi Event 03/21/2012
02/13/2012 Draft Final Regulatory Guides 1.160 and 4.11 No Response Required
02/13/2012 International Isotopes Fluorine Extraction and Depleted Uranium De-Conversion Plant Safety Evaluation No Response Required
01/26/2012 Proposed Draft Rule for 10 CFR 50.46c, “Emergency Core Cooling System Performance During Loss-of-Coolant Accidents” 02/17/2012
01/24/2012 Draft Final Regulatory Guides 7.4, 3.74, and 7.7 No Response Required
Page Last Reviewed/Updated Tuesday, August 14, 2012