National Corridor Planning and Border Development Program*
FY 2005 Designated Funds for Specific NCPD Projects per Conference Committee report
(from the conference report (H.R. 108-792) accompanying the Omnibus Appropriations Act, 2005 (P.L. 108-447))
Project | Amount*** |
---|---|
Albany Bypass, Clinton County, Kentucky | $1,000,000 |
Berkley Road Polk County, Florida | $2,000,000 |
Bishopville Bypass Construction, South Carolina | $1,500,000 |
Broad & Washington Street Reconstruction, Connecticut | $2,000,000 |
Carrollton/US90-US61 Rehabilitation Project, Louisiana | $1,000,000 |
Construction of Juneau Access road, Alaska | $2,000,000 |
Construction of road from Kotzebue, Alaska to Cape Blossom, Alaska | $2,000,000 |
Construction of road, Shot Gun Cove, Alaska | $2,000,000 |
County State Aid Highway 21 Project, Minnesota | $1,000,000 |
Craig roads, Alaska | $1,000,000 |
Cross Valley Connector, California | $5,000,000 |
East Hiram Parkway, Paulding County, Georgia | $1,000,000 |
Emmonak street lighting, Alaska | $1,000,000 |
Englewood Interstate Connector EIC, Sarasota, Florida | $1,000,000 |
FAST Corridor Program, Washington | $2,500,000 |
Haleyville Bypass, Winston County, Alabama | $6,500,000 |
Highway 65 Hollister Interchange Missouri | $1,000,000 |
Horse Stamp Road/I-95 Interchange, Georgia | $3,000,000 |
I-4/Crosstown Connection in Hillsborough County, Florida | $1,000,000 |
I-235/US54 and I-235/Central Ave, Wichita, Kansas | $1,500,000 |
I-49 North, Louisiana | $2,250,000 |
I-49 South, Louisiana | $2,250,000 |
I-494/US 169 Interchange, Minnesota | $1,500,000 |
I-635, Texas | $2,450,000 |
I-69 Access Project, Hamilton County, IN | $1,000,000 |
I-69/SR 304 Paving, Mississippi | $1,000,000 |
I-69 Connector (I-530 Ext.): Pine Bluff-Hwy. 278, Arkansas | $2,000,000 |
I-74 from Maxton Bypass to Lumberton, North Carolina | $1,000,000 |
Improvements to Anaheim Street, from 710 Freeway, California | $500,000 |
Improvements to CR 833 in Hendry County, Florida | $1,000,000 |
Interchange at K-7 & 55th St./Johnson Dr, Shawnee, Kansas | $2,000,000 |
Interstate 280 Interchange Improvements, New Jersey | $1,500,000 |
Interstate 5 Riverfront Reconnector, California | $1,000,000 |
Interstate 69, Tennessee | $1,500,000 |
Jennie Barker Rd./Mary St./K-156 Intersection, Finney County, Kansas | $500,000 |
Kalispell Bypass, Montana | $3,000,000 |
Kodiak Island roads, Alaska | $1,300,000 |
KY 911/115 Widening, Kentucky | $1,000,000 |
Lincoln Parish I-20 Corridor, Louisiana | $1,000,000 |
Loop 49 from SH 155 to SH 31, Texas | $3,000,000 |
Manchester Road in Akron, Ohio | $1,000,000 |
Mesa del Sol/I-25 Interchange, New Mexico | $1,000,000 |
Mon-Fayette Expressway Project/Uniontown to Browns, Pennsylvania | $2,000,000 |
Navajo Route N7048 Bridge Construction, New Mexico | $250,000 |
Nikiski emergency escape road, Alaska | $500,000 |
Northwest Butler Transportation Improvement District, Ohio | $4,000,000 |
Old Highway 471, Rankin County, Mississippi | $1,000,000 |
Outer Loop/I-85 Connector, Montgomery, Alabama | $2,000,000 |
Parkway West Missing Ramps and Widening Project, Pennsylvania | $1,000,000 |
Port of Albany Operational Improvements, New York | $1,000,000 |
Ports of Savage/TH 13 Improvements, Minnesota | $1,000,000 |
President George Bush Tollway Eastern Extension, Texas | $2,000,000 |
Pt. Hope evacuation road, Alaska | $2,000,000 |
Reconstruction of Ashburton Avenue, Saw Mill River** | $1,200,000 |
Reyes Adobe Road Interchange Project, California | $1,500,000 |
Rickenbacker Intermodal Facility, Ohio | $1,500,000 |
Route 247, Nelson County, Kentucky | $600,000 |
Route 412 Improvement Project, Bethlehem, Pennsylvania | $3,000,000 |
Route 79 Improvements, Fall River, Massachusetts | $1,000,000 |
SR 0171, Drinkers Creek Bridge, Susquehanna County, Pennsylvania | $1,000,000 |
Santa Fe Corridor, Colorado | $1,000,000 |
SR 519 Intermodal Access, Washington | $1,000,000 |
Street Improvements, Lawndale, California | $500,000 |
US 82 Bypass at Greenville, Mississippi | $1,500,000 |
US 101 Off-ramp Extension at Van Nuys Boulevard, California | $1,000,000 |
US 319 Improvements, Florida | $1,000,000 |
US 321 Corridor, North Carolina | $1,000,000 |
US 60 bridge replacement, Virginia | $2,600,000 |
US Highway 56 Improvements, Kansas | $4,000,000 |
US Route 2/Danville, Vermont Improvements | $2,000,000 |
Upgrade of NH Rte. 110 Berlin, New Hampshire | $800,000 |
US 395--North Spokane Corridor, Washington | $1,000,000 |
US 401 in Harnett, Cumberland & Wake Counties, North Carolina | $800,000 |
US 62--Franklin County/Frank Road, Ohio | $1,000,000 |
US 83 from .5 mi e of FM1425 to Hidalgo/Cameron, Texas | $1,000,000 |
US Highway 62/180 Four-Lane Reconstruction, New Mexico | $5,000,000 |
US-95, MP 536 to Canadian Border, Idaho | $1,500,000 |
UW-Bothell/Cascadia South Access Project, Washington | $1,000,000 |
Wadsworth/U.S. 36 Interchange in Broomfield, Colorado | $1,250,000 |
Wasilla substandard road improvements, Alaska | $1,000,000 |
West Virginia Route 9--Berkeley and Jefferson Counties | $10,000,000 |
White County/Monticello 6th Street West Shafer Drive Project, Indiana | $250,000 |
Yakima Grade Separations, Washington | $1,500,000 |
$140,000,000 |
*FHWA refers to this as the National Corridor Planning and Development and Coordinated Border Infrastructure Program. The table is not totaled in the Congressional report but sums to $140 million.
**Though the report language does not identify the recipient state for Reconstruction of Ashburton Avenue, Saw Mill River project, the FHWA believes this project belongs to New York.
*** Awards will be for less than designated amounts because of a rescission and obligation authority limitation.
To provide Feedback, Suggestions or Comments for this page contact Stefan Natzke at stefan.natzke@dot.gov or 202-366-5010.