1.0 Site Identification
Type of Site: | Research and Test Reactor Facility |
Location: | Alameda,CA |
License No.: | DR-10 |
Docket No.: | 50-183 |
License Status: | SAFSTOR |
Project Manager: | John Buckley |
2.0 Site Status Summary
On April 15, 1970, NRC authorized the licensee to possess but not operate the reactor. The license was renewed on June 11, 1976, to expire in 2016. The facility has been maintained in SAFSTOR condition. The facility is next to the Vallecitos Boiling Water Reactor which is also in SAFSTOR. The licensee plans to maintain the facility in SAFSTOR until other ongoing nuclear and radioactive activities are also to be decommissioned to provide an integrated site decommission.
3.0 Major Technical or Regulatory Issues
None
4.0 Estimated Date For Closure
01/20/2019