Sequoyah Fuels Corporation Site – Environmental Review
Sequoyah Fuels Corporation Site in Gore, Oklahoma
On this page:
- Application Information
- Environmental Review Schedule
- Public Involvement
- Project Managers for Sequoyah Fuels Corporation Site
Application Information:
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Environmental Report
Surface Reclamation Plan
Schedule for the Sequoyah Fuels Corporation Site ER Review and EIS Preparation*
Actions |
Date |
---|---|
Surface Reclamation Plan Received |
January 2003 |
Groundwater Corrective Action Plan Received |
June 2003 |
Environmental Report Received |
October 2006 |
Draft EIS/FRN Availability |
September 21, 2007 |
DEIS Public Meeting (Gore, OK) |
October 16, 2007 |
Draft EIS Public Comment Period Ends |
November 5, 2007 |
Issue Final EIS to EPA |
April 2008 |
* These schedules reflect work plans that are subject to change. Subsequent meetings and comment periods may change based on the revised schedule. This work plan will be updated on a periodic basis. Please see the NRC Public Meetings Page or contact the listed PM for the latest information on meetings and status.
Public Involvement
-
The public is encouraged to participate in the environmental review process through public meetings, and public comment periods on rules, guidance, and other documents. Comments to the NRC on the Draft Environmental Impact Statement (DEIS) may be submitted by e-mail or regular mail as follows:
By regular mail - postmarked by November 5, 2007
Chief, Rules Review and Directives Branch,
U.S. Nuclear Regulatory Commission
Mail Stop T-6D59
Washington, DC 20555-0001
By email - received by midnight November 5, 2007 "Sequoyah Fuels DEIS" in the subject line
Send to NRCREP.Resource@nrc.gov - On October 16, 2007, the NRC staff conducted a public meeting for comment on the Draft Environmental Impact Statement (DEIS) for the licensee’s surface reclamation and groundwater corrective action plans. Several stakeholders were in attendance at the meeting. Links to the meeting transcript and presentation are provided below:
Draft Environmental Impact Statement (DEIS): NUREG-1888
DEIS Meeting Presentation
Public
Meeting for Comment on
Project Managers for Sequoyah Fuels Corporation Site Reviews
NRC PMs for Sequoyah Fuels Corporation Site |
|
---|---|
Environmental Review |
Allen Fetter |
Surface Reclamation Plan Review |
Myron Fliegel |
Groundwater Corrective Action Plan Review |
Stephen Cohen |