Click for More Information Battle Mountain Community Pasture Barn Demolition EA Reclamation is proposing to demolish and remove the Battle Mountain Community Pasture barn. The barn... FONSI signed July 5, 2011.
Click for More Information Carson Lake and Pasture Transfer and Management EA Reclamation proposes to convey Federal lands known as the Carson Lake and Pasture (CLP) to the State... Comments were due August 14, 2009.
Click for More Information Categorical Exclusion Checklists for Calendar Year 2011 Attached are the recent Categorical Exclusion Checklists for the Lahontan Basin Area Office. A CEC e...
Click for More Information Categorical Exclusion Checklists for Lahontan Basin Area Office for Calendar Year 2012 Attached are the recent Categorical Exclusion Checklists for the Lahontan Basin Area Office. A CEC e...
Click for More Information Independence Lake Forest Thinning and Hazardous Fuels Reduction EA Reclamation proposes to approve the Nature Conservancy to utilize Desert Terminal Lake grant funding... FONSI signed September 5, 2012.
Click for More Information Independence Lake Spillway Fish Barrier EA Reclamation proposes to construct the Independence Lake Spillway Fish Barrier. Reclamation has been... FONSI signed and final EA completed on September 1, 2011.
Click for More Information Lower Truckee River Restoration Projects at Tracy Power Plant, West McCarran Ranch, and Upper Mustang Ranch EA The Bureau of Reclamation (Reclamation) and The Nature Conservancy (TNC) utilizing Reclamation Des... FONSI signed on August 24, 2012.
Click for More Information Newlands Project Resource Management Plan (RMP) Reclamation will be preparing an environmental document for the purpose of evaluating options for ma... NOI published in Federal Register on August 15, 2007. Public Scoping Meetings September 18, 2007 in Reno and September 19, 2007 in Fallon. Government-to-government consultation meeting in October 2007 with Fallon Paiute-Shoshone Tribe.
Click for More Information Patua Geothermal Project Phase II EA Gradient Resources Inc., (GRI) has obtained the rights to federal geothermal leases which comprise p... The EA is available at BLM's website at:https://www.blm.gov/epl-front-office/eplanning/projectSummary.do?methodName=renderDefaultProjectSummary&projectId=17952
Click for More Information Salt Wells Geothermal Energy Projects EIS The Bureau of Land Management (BLM), Carson City District-received proposals from Ormat Technologies... The Final EIS and BLM's RODs can be viewed at http://www.blm.gov/nv/st/en/fo/carson_city_field/blm_information/nepa/salt_wells_energy.html.
Click for More Information Stampede Dam Safety of Dams Modification Project EA Reclamation proposes to construct safety modifications to Stampede Dam near Truckee, California. Re... FONSI signed and Final EA completed on May 11, 2012.
Click for More Information Truckee River Below Derby Dam Riparian Ecosystem Restoration The project to be analyzed is augmenting the fishway at Derby Dam, Truckee River, east of Reno, Neva... EA available January 2009
Click for More Information Truckee River Restoration Environmental Assessment Reclamation is co-lead with BLM for this NEPS project for the restoration of three sites on the lowe... Public Meetings held February 2007. Draft EA out January 2008. Final EA/signed FONSI March 2008.