[ USACE Home ] > [ Library Program ] > [Publications] > [Engineer Manuals] Search    


ENGINEER MANUALS
Updated: 2012 September 26

PUB.NUMBER PAGES PROPONENT TITLE PUB.DATE
EM 200-1-1 504 CEMP Validation of Analytical Chemistry Laboratories 01 Jul 94
EM 200-1-2 132 CEMP-RT Technical Project Planning (TPP) Process 31 Aug 98
EM 200-1-4 (Volume I) 187 CEMP-RT Risk Assessment Handbook: Volume I - Human Health Evaluation 31 Jan 99
EM 200-1-4 (Volume II) 193 CEMP-RT Risk Assessment Handbook: Volume II - Environmental Evaluation 31 Dec 2010
EM 200-1-6 126 CEMP-RT Chemical Quality Assurance for Hazardous, Toxic, nad Radioactive (HTRW) Projects 10 Oct 97
EM 200-1-7 114 CEMP-RT/
CECW-E
Performance Evaluation (PE) Program 01 Feb 01
EM 200-1-10,
Errata
129 CEMP-RT/
CECW-E
Environmental Quality - Guidance for Evaluating Performance-Based Chemical Data 30 Jun 05
EM 200-1-12 76 CEMP-CE Conceptual Site Models 28 Dec 12
EM 385-1-1 *_2003_*,  Arabic 977 CESO-ZA Safety - Safety and Health Requirements 03 Nov 03
EM 385-1-1
*_2008_*
Dari
1045 CESO-ZA Safety - Safety and Health Requirements 15 Sep 08
EM 385-1-1 *_2003_*, English 977 CESO-ZA Safety - Safety and Health Requirements

NOTE: This 2003 version will remain posted due to on-going contracts that were bid according to requirements of this manual.
03 Nov 03
EM 385-1-1 *_2008_*, English,
Changes, Errata
 1045 CESO-ZA Safety - Safety and Health Requirements 15 Sep 08
EM 385-1-1 *_2003_*, Japanese 977 CESO-ZA Safety - Safety and Health Requirements 03 Nov 03
EM 385-1-80 186 CESO Radiation Protection Manual 30 May 97
EM 385-1-97
Errata/Changes
358 CESO-ZA Explosives - Safety and Health Requirements Manual 15 Sep 08
EM 500-1-24 136 CECW-OE-E Corps of Engineers Exercise Manual (COREM) - ANNEX L Classified CONFIDENTIAL -(Stocked and Issued by Proponent) 01 Sep 87
EM 1110-1-400 203 CECW-CO Recreation Facility and Customer Services Standards 01 Nov 04
EM 1110-1-501 200+ CEMP-ET,
DAEN-CWE-BU,
DAEN-MPE-D
Process Design Manual for Land Treatment of Municipal Wastewater 20 May 82
EM 1110-1-502 382 CEMP-R/
CECW-E
Technical Guidelines for Hazardous and Toxic Waste Treatment and Cleanup Activities 30 Apr 94
EM 1110-1-1000 371 CECW-EE Photogrammetric Mapping 01 Jul 02
EM 1110-1-1002 072 CECW-EE Survey Markers and Monumentations 01 Mar 12
EM 1110-1-1003 469 CECW-EE NAVSTAR Global Positioning System Surveying 28 Feb 11
EM 1110-1-1005 498 CECW-CE Engineering and Design: Control and Topographic Surveying 01 Jan 07
EM 1110-1-1802 317 CECW-EG Geophysical Exploration for Engineering and Environmental Investigations 31Aug 95
EM 1110-1-1804 148 CECW-ET Geotechnical Investigations 1 Jan 01
EM 1110-1-1904 204 CECW-EG Settlement Analysis 30 Sep 90
EM 1110-1-1905 201 CECW-EG Bearing Capacity of Soils 30 Oct 92
EM 1110-1-2009 052 CECW-EG Architectural Concrete 31 Oct 97
EM 1110-1-2907 205 CECW-EG Rock Reinforcement 15 Feb 80
EM 1110-1-2908 065 CECW-EG Rock Foundations 30 Nov 94
EM 1110-1-2909 224 CECW-CE Geospatial Data and Systems 01 sep 12
EM 1110-1-3500 032 CECW-EG Chemical Grouting 31 Jan 95
EM 1110-1-4000 068 CEMP-RT/
CECW-EG
Monitoring Well Design, Installation, and Documentation at Hazardous Toxic, and Radioactive Waste Sites 1 Nov 98
EM 1110-1-4001 424 CECW-RT Soil Vapor Extraction and Bioventing 03 Jun 02
EM 1110-1-4005 192 CEMP-CE In-Situ Air Sparging 31 Jan 08
EM 1110-1-4006 260 CEMP-RT Removal of Underground Storage Tanks (USTs) 30 Sep 98
EM 1110-1-4007 286 CEMP-RA Safety and Health Aspects of Hazardous, Toxic, and Radioactive Waste Remediation Technologies 15 Aug 03
EM 1110-1-4008 245 CEMP-RA Liquid Process Piping 05 May 99
EM 1110-1-4009 346 CEMP-CE Engineering and Design:
Military Munitions Response Actions

15 Jun 07
EM 1110-1-4010 285 CEMP-R Multi-Phase Extraction 01 Jun 99
EM 1110-1-4011 70 CEMP-RA Construction Quality Assurance (CQA) Plan - Requirements for Hazardous Waste Landfill 01 Oct 99
EM 1110-1-4012 101 CECW-ET Engineering and Design: Precipitation/Coagulation/Flocculation 15 Nov 01
EM 1110-1-4014 544 CEMP-CE Environmental Quality - Environmental Statistics 31 Jan 08
EM 1110-1-4015 225 CEMP-CE Design: In Situ Thermal Remediation 28 August 2009
EM 1110-1-4016 110 CEMP-CE Engineering and Design - Landfill Off-Gas Collection and Treatment Systems 30 May 08
EM 1110-2-38 008 CECW-EM Environmental Quality in Design of Civil Works Projects 03 May 71
EM 1110-2-410 107 CECW-ED, DAEN-CWE-BU Design of Recreation Areas and Facilities - Access and Circulation 31 Dec 82
EM 1110-2-501 221 CECW-ET Small Wastewater Systems 01 Feb 99
EM 1110-2-503 83 CECW-ET Design of Small Water Systems 27 Feb 99
EM 1110-2-504 057 CECW-ED, DAEN-ECE-B Land Treatment Systems - Operation and Maintenance 30 Nov 83
EM 1110-2-1003
Change 1 (01 Apr 04)
580 CECW-EE
CECW-OD
Hydrographic Surveying 01 Jan 02
EM 1110-2-1009 292 CECW-EE Engineering and Design - Structural Deformation Surveying 01 Jun 02
EM 1110-2-1100
Part I
78 CECW-EW Coastal Engineering Manual - Part I 30 Apr 02
EM 1110-2-1100
Part II
608 CECW-EW Coastal Engineering Manual - Part II 30 Apr 02
EM 1110-2-1100
Part III
472 CECW-EW Coastal Engineering Manual - Part III 30 Apr 02
EM 1110-2-1100
Part IV
230 CECW-EW Coastal Engineering Manual - Part IV 30 Apr 02
EM 1110-2-1100
Part V
667 CECW-EH Coastal Engineering Manual - Part V 30 Apr 02
EM 1110-2-1100
Part VI
667 CECW-EW Coastal Engineering Manual - Part VI 30 Apr 02
EM 1110-2-1100
Appendix A, Glossary
095 CECW-EW Coastal Engineering Manual - Appendix A - Glossary of Coastal Terminology 30 Apr 02
EM 1110-2-1201 191 CECW-EH, CECW-P, CECW-O Reservoir Water Quality Analyses 30 Jun 87
EM 1110-2-1202 123 CECW-EH-W, DAEN-ECE-H, DAEN-CWO, DAEN-CWP Environmental Engineering for Deep-Draft Navigation Projects 29 May 87
EM 1110-2-1204 191 CECW-EH-W Environmental Engineering for Coastal Shore Protection 10 Jul 89
EM 1110-2-1205 096 CECW-EH-W Environmental Engineering and Local Flood Control Channels 15 Nov 89
EM 1110-2-1206 039 CECW-EH-W Environmental Engineering for Small Boat Basins 31 Oct 93
EM 1110-2-1304,
Errata
049 CECW-EC Civil Works Construction Cost Index System (CWCCIS)

31 Mar 12

Tables updated per schedule

EM 1110-2-1406 142 CECW-EH Runoff from Snowmelt 31 Mar 98
EM 1110-2-1411 036 CECW Standard Project Flood Determination 01 Mar 65
EM 1110-2-1413 089 CECW-EH, DAEN-CWH-Y Hydrologic Analysis of Interior Areas 15 Jan 87
EM 1110-2-1415 149 CECW-EH-Y Hydrologic Frequency Analysis 05 Mar 93
EM 1110-2-1416 168 CECW-EH-Y River Hydraulics 15 Oct 93
EM 1110-2-1417 213 CECW-EH Flood-Runoff Analysis 31 Aug 94
EM 1110-2-1418 114 CECW-EH-D Channel Stability Assessment for Flood Control Projects 31 Oct 94
EM 1110-2-1419 050 CECW-EH-Y Hydrologic Engineering Requirements for Flood Damage Reduction Studies 31 Jan 95
EM 1110-2-1420 148 CECW-EH-Y Hydrologic Engineering Requirements for Reservoirs 31 Oct 97
EM 1110-2-1421 121 CECW-EH Groundwater Hydrology 28 Feb 99
EM 1110-2-1424

Change 1
Change 2
197 CECW-ET Lubricants and Hydraulic Fluids 28 Feb 99

31 Jul 06
26 Oct 07
EM 1110-2-1601 080 CECW-EH-D Hydraulic Design of Flood Control Channels 30 Jun 94
EM 1110-2-1602 199 CECW-EH-D Hydraulic Design of Reservoir Outlet Works 15 Oct 80
EM 1110-2-1603 169 CECW-EH-D Hydraulic Design of Spillways 16 Jan 90
EM 1110-2-1604 196 CECW-CE Hydraulic Design of Navigation Locks 01 May 06
EM 1110-2-1605 192 CECW-EH-D Hydraulic Design of Navigation Dams 12 May 87
EM 1110-2-1606 014 CECW-EH-D Hydraulic Design - Surges in Canals - Change 1 01 Mar 49
EM 1110-2-1607 154 CECW-EH-D Tidal Hydraulics 15 Mar 91
EM 1110-2-1610 058 CECW-EH-D Hydraulic Design of Lock Culvert Valves 10 Jul 89
EM 1110-2-1611 138 CECW-EH Layout and Design of Shallow-Draft Waterways with Change 3 (31 Jul 97) and Errata Sheet (27 August 97) 31 Dec 80
EM 1110-2-1612, changes 197 CECW-EH Ice Engineering 30 Oct 02
EM 1110-2-1613 212 CECW-CE Hydraulic Design of Deep-Draft Navigation Projects 31 May 06
EM 1110-2-1614 110 CECW-EH-D Design of Coastal Revetments, Seawalls, and Bulkheads 30 Jun 95
EM 1110-2-1615 131 CECW-EH-D Hydraulic Design of Small Boat Harbors 25 Sep 84
EM 1110-2-1619 61 CECW-EH-Y Risk-Based Analysis for Flood Damage Reduction Studies 1 Aug 96
EM 1110-2-1701 825 CECW-EH, DAEN-CWH-Y Hydropower with Change 1 31 Dec 85
EM 1110-2-1810 291 CECW-EG Coastal Geology 31 Jan 95
EM 1110-2-1901 389 CECW-EG Seepage Analysis and Control for Dams 30 Sep 86
(original)
30 Apr 93
(change 1)
EM 1110-2-1902 205 CECW-EW Slope Stability 31 Oct 03
EM 1110-2-1906 407 CECW-EG, DAEN-CWE-SS Laboratory Soils Testing 30 Nov 70
EM 1110-2-1908 083 CECW-EG Instrumentation of Embankment Dams and Levees 30 Jun 95
EM 1110-2-1909 044 CECW-EG Calibration of Laboratory Soils Testing Equipment 01 Dec 70 (original)
10 Mar 86 (change 1)
EM 1110-2-1911 100 CECW-ED Construction Control for Earth and Rock-Fill Dams 30 Sep 95
EM 1110-2-1913 164 CECW-EG Design and Construction of Levees 30 Apr 00
EM 1110-2-1914 091 CECW-EG Design, Construction, and Maintenance of Relief Wells 29 May 92
EM 1110-2-2000 124 CECW-EG Standard Practice for Concrete for Civil Works Structures 01 Feb 94(original)
31 Mar 01 (change 2)
EM 1110-2-2002 184 CECW-EG Evaluation and Repair of Concrete Structures 30 Jun 95
EM 1110-2-2005 063 CECW-EG Standard Practice for Shotcrete 31 Jan 93
EM 1110-2-2006 077 CECW-EG Roller-Compacted Concrete 15 Jan 00
EM 1110-2-2007 053 CECW-ED Structural Design of Concrete Lined Flood Control Channels 30 Apr 95
EM 1110-2-2100 161 CECW-CE Stability Analysis of Concrete Structures 01 Dec 05
EM 1110-2-2102 002 CECW-EG Waterstops and Other Preformed Joint Materials for Civil Works Structures 30 Sep 95
EM 1110-2-2104

Change 1
075 CECW-ED Strength Design for Reinforced Concrete Hydraulic Structures 30 Jun 92

20 Aug 03
EM 1110-2-2105 006 CECW-ED Design of Hydraulic Steel Structures 31 Mar 93
EM 1110-2-2200 088 CECW-ED Gravity Dam Design 30 Jun 95
EM 1110-2-2201 238 CECW-ED Arch Dam Design 31 May 94
EM 1110-2-2300 130 CECW-EG General Design and Construction Considerations for Earth and Rock-Fill Dams 30 Jul 04
EM 1110-2-2301 094 CECW-EG Test Quarries and Test Fills 30 Sep 94
EM 1110-2-2302 060 CECW-EG Construction With Large Stone 24 Oct 90
EM 1110-2-2400 143 CECW-EW Structural Design and Evaluation of Outlet Works 02 Jun 03
EM 1110-2-2502 447 CECW-ED Retaining and Flood Walls 29 Sep 89
EM 1110-2-2503 184 CECW-EP Design of Sheet Pile Cellular Structures Cofferdams and Retaining Structures 29 Sep 89
EM 1110-2-2504 074 CECW-ED Design of Sheet Pile Walls 31 Mar 94
EM 1110-2-2602 185 CECW-ED Planning and Design of Navigation Locks 30 Sep 95
EM 1110-2-2607 117 CECW-ED Planning and Design of Navigation Dams 31 July 95
EM 1110-2-2608 011 CECW-EE Navigation Locks - Fire Protection Provisions 28 Feb 94
EM 1110-2-2610
Change 1
Change 2
322 CECW-ET Lock and Dam Gate Operating and Control Systems 12 Dec 03
02 Apr 04
18 Nov 08
EM 1110-2-2611 061 CECW-EW Engineering for Prefabricated Construction of Navigation Projects 01 Feb 04
EM 1110-2-2701 056 CECW-ED Vertical Lift Gates 30 Nov 97
EM 1110-2-2702 112 CECW-ET Design of Spillway Tainter Gates 01 Jan 00
EM 1110-2-2703 272 CECW-EE Lock Gates and Operating Equipment 30 Jun 94
EM 1110-2-2704 106 CECW-CE Cathodic Protection Systems for Civil Works Structures 12 July 04
EM 1110-2-2705 109 CECW-ED Structural Design of Closure Structures for Local Flood Protection Projects 31 Mar 94
EM 1110-2-2901 236 CECW-EG Tunnels and Shafts in Rock 30 May 97
EM 1110-2-2902 085 CECW-ED Conduits, Culverts, and Pipes 31 Oct 97 (original)
31 Mar 98 (change 1)
EM 1110-2-2906 189 CECW-ED Design of Pile Foundations 15 Jan 91
EM 1110-2-2907 217 CECW-EE Remote Sensing 01 Oct 03
EM 1110-2-3001
Change 1
041 CECW-ED Planning and Design of Hydroelectric Power Plant Structures 30 Apr 95
10 Oct 08
EM 1110-2-3102 033 CECW-EE General Principles of Pumping Station Design and Layout 28 Feb 95
EM 1110-2-3104 071 CECW-ED Structural and Architectural Design of Pumping Stations 30 Jun 89
EM 1110-2-3105 169 CECW-EE Mechanical and Electrical Design of Pumping Stations 30 Mar 94 (original)
31 Aug 94 (change 1)
30 Nov 99 (change 2)
EM 1110-2-3006 114 CECW-EP Hydroelectric Power Plants Electrical Design 30 Jun 94
EM 1110-2-3200
Change 1 - 02 Apr 04
078 CECW-EE Wire Rope Selection Criteria for Gate Operating Devices 30 Sep 98
02 Apr 04
EM 1110-2-3400 158 CECW-EE Painting: New Construction and Maintenance 30 Apr 95
EM 1110-2-3401 85 CECW-ET Thermal Spraying: New Construction and Maintenance 29 Jan 99
EM 1110-2-3506 159 CECW-EG Grouting Technology 20 Jan 84
EM 1110-2-3600 226 CECW-EH-W Management of Water Control Systems 30 Nov 87
EM 1110-2-3800 146 CECW-EG Systematic Drilling and Blasting for Surface Excavations 01 Mar 72
EM 1110-2-4000 268 CECW-EH-Y Sedimentation Investigations of Rivers and Reservoirs 15 Dec 89
EM 1110-2-4205 111 CECW-EE Hydroelectric Power Plants Mechanical Design 30 Jun 95
EM 1110-2-4300 305 CECW-ED Instrumentation for Concrete Structures 15 Sep 80 (original)
30 Nov 87 (change 1)
EM 1110-2-5025 093 CECW-EH-D Dredging and Dredged Material Disposal 25 Mar 83
EM 1110-2-5026 284 CECW-EH-D Beneficial Uses of Dredged Material 30 Jun 87
EM 1110-2-5027 243 CECW-EH-D Confined Disposal of Dredged Material 30 Sep 87
EM 1110-2-6050 247 CECW-ET Response Spectra and Seismic Analysis for Concrete Hydraulic Structures 30 Jun 99
EM 1110-2-6051 401 CECW-EW Engineering and Design - Time-History Dynamic Analysis of Concrete Hydraulic Structures 22 Dec 03
EM 1110-2-6053 247 CECW-CE Engineering and Design - Earthquake Design and Evaluation of Concrete Hydraulic Structures 01 May 07
EM 1110-2-6054 133 CECW-ED Inspection, Evaluation, and Repair of Hydraulic Steel Structures 01 Dec 01
EM 1110-2-6056 422 CECE-CE Standards and Procedures for Referencing Project Elevation Grades to Nationwide Vertical Datums 31 Dec 10
EM 1110-3-130 043 CEMP-ET, DAEN-ECE-G Geometrics for Roads, Streets, Walks,and Open Storage Areas - Mobilization Construction 09 Apr 84
EM 1110-3-131 045 CEMP-ET, DAEN-ECE-G Flexible Pavements for Roads, Streets, Walks and Open Storage Areas - Mobilization for Construction 09 Apr 84
EM 1110-3-132 040 CEMP-ET, DAEN-ECE-G Rigid Pavements for Roads, Streets, Walks and Open Storage Areas - Mobilization Construction 09 Apr 84
EM 1110-3-135 036 CEMP-ET, DAEN-ECE-G Standard Practice for Concrete Pavements - Mobilization Construction 09 Apr 84
EM 1110-3-136 203 CEMP-ET, DAEN-ECE-G Drainage and Erosion Control - Mobilization Construction 09 Apr 84
EM 1110-3-137 032 CEMP-ET, DAEN-ECE-G Soil Stabilization for Pavements - Mobilization Construction 09 Apr 84
EM 1110-3-138 98 CEMP-ET, DAEN-ECE-G Pavement Criteria for Seasonal Frost Conditions -Mobilization Construction 09 Apr 84
EM 1110-3-141 102 CEMP-ET, DAEN-ECE-G Airfield Flexible Pavement - Mobilization Construction 09 Apr 84
EM 1110-3-142 083 CEMP-ET, DAEN-ECE-G Airfield Rigid Pavement - Mobilization Construction 09 Apr 84
EM 1110-3-150 054 CEMP-ET, DAEN-ECE-G Storage Depots - Mobilization Construction 09 Apr 84
EM 1110-3-152 035 CEMP-ET, DAEN-ECE-G Railroads - Mobilization Construction 09 Apr 84
EM 1110-3-160 015 CEMP-ET, DAEN-ECE-G Water Supply, General Considerations - Mobilization Construction 09 Apr 84
EM 1110-3-161 035 CEMP-ET, DAEN-ECE-G Water Supply, Water Sources - Mobilization Construction 09 Apr 84
EM 1110-3-162 059 CEMP-ET, DAEN-ECE-G Water Supply, Water Treatment - Mobilization Construction 09 Apr 84
EM 1110-3-163 020 CEMP-ET, DAEN-ECE-G Water Supply, Water Storage - Mobilization Construction 09 Apr 84
EM 1110-3-164 056 CEMP-ET, DAEN-ECE-G Water Supply, Water Distribution - Mobilization Construction 09 Apr 84
EM 1110-3-166 038 CEMP-ET, DAEN-ECE-G Water Supply, Fire Protection - Mobilization Construction 09 Apr 84
EM 1110-3-172 117 CEMP-ET, DAEN-ECE-G Domestic Wastewater Treatment - Mobilization Construction 11 May 84
EM 1110-3-173 038 CEMP-ET, DAEN-ECE-G Sanitary and Industrial Wastewater Pumping - Mobilization Construction 09 Apr 84
EM 1110-3-174 031 CEMP-ET, DAEN-ECE-G Sanitary and Industrial Wastewater Collection -Mobilization Construction 09 Apr 84
EM 1110-3-176 019 CEMP-ET, DAEN-ECE-G Incinerators - Mobilization Construction 09 Apr 84
EM 1110-3-177 033 CEMP-ET, DAEN-ECE-G Sanitary Landfill - Mobilization Construction 09 Apr 84
EM 1110-8-1(FR) 139 CECW-EH-D Winter Navigation on Inland Waterways 31 Dec 90
EM 1110-35-1 124 CEMP-DE Engineering and Design: Management Guidelines for Working with Radioactive and Mixed Waste 01 Jul 05
EM 1125-2-312 094 CECW-D Manual for Instructions - Hopper Dredge Operations and Standard Reporting Procedures, ENG 2590 01 Dec 53


contact: HQPublications@usace.army.mil