FTA Library - Guides, Information, and Brochures

The following topics are presented in this Library page:

  • Accessibility

  • Agreements

  • Applicant profiles
  • Brochure

  • Checklist

  • Circular

  • Executive order

  • Fact sheet

  • Final guidance

  • Flowchart
  • Forms

  • Guidelines

  • Information sheet

  • Instructions

  • Management, maintenance, and operations

  • Meeting

  • News update

  • Oversight

  • Policy letter
  • Presentation

  • Professional capacity building

  • Proposal profile

  • Road map

  • Significant guidance

  • Traveler information

  • User guide

  • Enter a keyword in the text box below to search text on this page:

    Enter a keyword in the text box below to search all content within the Library:



    Note: Click any column header to sort by that title.

    Name Topic Publication Date Description
    2004 State Funding [Text (no images)]
    ,Fact Sheet,Information Sheet
    04-11-06

    Fiscal year summaries for various states (2004).

    2004 State Funding [Text]
    ,Fact Sheet,Information Sheet
    04-07-04 Fiscal year summaries for various states (2004).
    2005 Apportionments by State [PDF]
    ,Fact Sheet,Information Sheet
    01-19-05

    Fiscal year funding summary for each state (2005).

    2005 Apportionments by State [Text]
    ,Fact Sheet,Information Sheet
    01-18-05

    Fiscal year summaries for each state (2005).

    2006 Before and After Studies Letter to Congress [DOC]
    ,Fact Sheet,Information Sheet
    08-23-06

    Letter to congress detailing the SAFETEA-LU addition to the US code requirments.

    2006 Before and After Studies Letter to Congress [PDF]
    ,Fact Sheet,Information Sheet,Policy Letter
    08-23-06

    Letter to congress detailing the SAFETEA-LU addition to the US code requirments.

    2006 Funding by State [XLS]
    ,Fact Sheet
    09-11-06

    Fiscal year funding breakdown for each state (2006).

    2007 Funding by State [XLS]
    ,Information Sheet
    10-01-07

    Fiscal year fund breakdown for each state.

    2008 Funds by State [XLS]
    ,Information Sheet
    10-01-08

    Breakdown of funds for each state.

    2009 Funding by State [XLS]
    ,Appropriations Report,Information Sheet
    10-01-09

    Funding breakdown state by state.

    2011 Funding by State [XLS]
    ,Fact Sheet,Information Sheet
    05-20-11

    Spreadsheet listing how much funding each state has received.

    AcuTech Consulting Group [PDF]
    ,Information Sheet
    12-18-07

    Description of AcuTech's capbilities and function inside the FTA.

    Adams Gabbert and Associates [PDF]
    ,Information Sheet
    02-29-08

    Breakdown of AdamsGabbert's capabilties within FTA.

    Added Access Report [PDF]
    ,Final Guidance,Report
    08-06-03

    Added access report for FHWA as it relates to the environmental review process

    Administrator's Policy Letters: State of Good Repair [PDF]
    ,Policy Letter
    09-30-08

    Administrator Simpson's "Dear Colleague letter" about ways to keep our nations transit systems under a state of good repair.

    Alternative Fuels and Propulsion Vehicle Incentives [DOC]
    ,Information Sheet
    07-16-07

    List of resources for incentives to buying alternative fuel vehicles.

    Alternatives Analysis Discretionary Program
    ,Fact Sheet,Information Sheet
    03-08-07

    Complete analysis of alternative fuels and how it would impact current transit systems.

    Alternatives Analysis Guidance [PDF]
    ,Fact Sheet,Information Sheet
    12-22-06

    FTA Alternatives Analvsis Guidance for the Rogue Valley Commuter Rail Proiect

    American Recovery and Reinvestment Act (ARRA) Civil Rights Teleconference - March 12, 2009 - 11AM to 12PM
    ,Information Sheet
    03-04-09

    Teleconference announcement letter.

    American Recovery and Reinvestment Civil Rights Conference Call - March 12, 2009 – 11AM – 12PM
    ,Information Sheet
    03-12-09

    ARRA conference call trascript.

    American Systems [PDF]
    ,Fact Sheet,Information Sheet
    02-29-08

    American Systems FTA capabilities statement.

    Annual Awards Program
    ,Information Sheet
    08-10-06

    Ridership award details rules and how to enter.

    APPENDIX A Fiscal Year 2011 Annual List of Certifications and Assurances for Federal Transit Administration Grants and Cooperative Agreements
    ,Agreements
    10-29-10

    Description of how 49 U.S.C. 5323(n) applies to FTA assistance programs

    Appendix A: Fiscal Year 2007 Annual List of Certifications and Assurances for Federal Transit Administration Grants and Cooperative Agreements
    ,Agreements,Forms
    12-18-06

    Description of how 49 U.S.C. 5323(n) applies to FTA assistance programs.

    Appendix C
    ,Flowchart
    07-01-05

    Appendix C: Graphs & Charts

    Appendix G
    ,Flowchart
    07-01-05

    Beach profile graphs.

    Appendix H
    ,Flowchart
    07-01-05

    LSV simulations of the spatial distributions of wake power on Point White, Bainbridge Island

    Appendix I: SAFETEA-LU Authorization Levels
    ,Fact Sheet,Information Sheet
    09-08-05

    Safe, Accountable, Flexible and Efficient Transportation Equity Act: a Legacy for Users (SAFETEA-LU) authorization levels.

    Application Guidance
    ,Forms,Guidelines,Instructions
    08-01-11

    Transit Investments for Greenhouse Gas and Energy Reduction (TIGGER III) Guidance for Applicants

    APPORTIONMENT OF FISCAL YEAR (FY) 2007 METROPOLITAN PLANNING FUNDS
    ,Appropriations Report,Fact Sheet
    12-06-00

    Fiscal year 2007 financial obligations for metropolian and statewide research.

    April 2008 Transit Research Update
    ,News Update
    04-01-08

    Complete update for 2008 on all current FTA research programs.

    April 2009 Transit Research Update
    ,Information Sheet,Report,Research Publication
    05-07-09

    Complete update for 2009 on all current FTA research programs.

    April 2010 Transit Research and Industry News Update
    ,Information Sheet,Research Publication
    05-04-10

    Complete update for 2010 on all current FTA research programs.

    ARC Handouts (PPT)
    ,Meeting,Presentation
    02-23-04

    Trans-Hudson express tunnel project outline and background information.

    ARC Handouts (Word)
    ,Meeting,Presentation
    05-09-05

    Tanrs-Hudson express tunnel project outline and background information.

    ARCADIS [PDF]
    ,Information Sheet
    12-21-07

    Description of all ARCADIS rails systems projects complete for the FTA.

    ATPPL Program Manual
    ,User Guide
    01-10-07

    Primary reference guide for the ATPPL.

    ATPPL Program Manual: Marked for posible remoal
    ,User Guide
    01-10-07

    This manual is the primary reference guide for ATPPL.

    Attachment 1 - Handbook Checklist
    ,Checklist
    03-11-11

    New Grantee Handbook Checklist

    Attachment 11 - Financial Capacity Questionnaire
    ,Information Sheet
    03-11-11

    Financial capacity questionaire

    Attachment 12 - Internal Control Self-Assessment
    ,Forms
    11-18-05

    Internal control self- assessment for for grantees.

    Attachment 14 - TEAM Vendor ID Request Form
    ,Forms
    03-02-07

    Request to edit a TEAM recipient/vendor record.

    Attachment 15 - TEAM User Access Request Form
    ,Forms
    02-14-11

    FTA Team user access request form.

    Attachment 16 - Example Designation of Signature Authority Letter
    ,Forms
    01-22-09

    Sample of how the FTA would like a designation of signature authority.

    Attachment 17 - TEAM User Access Form Instructions
    ,Forms
    03-11-11

    TEAM User Access Form Instructions

    Attachment 18 - ECHO User Manual
    ,User Guide
    03-10-10

    ECHO web users manual for the FTA and FAA.

    Attachment 19 - ECHO User Setup Forms
    ,Forms
    03-11-11

    Instructions for echo user setup.

    Attachment 2 - Sample Opinion of Counsel
    ,Forms
    03-31-09

    Sample opinion of counsel.

    Attachment 3 - Sample Authorizing Resolution
    ,Forms
    03-31-09

    FTA sample authorizing resolution.

    Attachment 4 - Master Agreement
    ,Agreements
    10-01-10

    FTA mater agreement attachment.

    Attachment 6 - Limited English Proficiency Handbook
    ,User Guide
    04-13-07

    Implementing the DOT's LEP handbook.

    Attachment 7 - Title VI Program Checklist
    ,Checklist
    03-11-11

    Title VI program checklist.

    Attachment 8 - DBE Program Checklist
    ,Checklist
    11-02-09

    Overall DBE program checklist.

    Attachment 9 - EEO Checklist
    ,Checklist
    11-02-09

    Title VII EEO program checklist.

    August 2008 Transit Research Update
    ,News Update
    09-08-08

    Outlines various publications and information released during 2008 for the FTA.

    August 2009 Transit Research and Industry News Update
    ,News Update
    09-14-09

    Outlines various publications and information released during 2009 for the FTA

    Basic Grant Making Procedures Presentation
    ,Presentation
    12-09-07

    A guide on how to recieve grant funding from FTA in Florida.

    BeDazzle Consulting Group [PDF]
    ,Information Sheet
    02-29-08

    BeDazzle statement of capabilities within the FTA.

    Best Development Practices: A Primer
    ,Fact Sheet,Guidelines,Information Sheet
    07-13-99

    Going into detail about the best ways to deal with suburban sprawl and its costs.

    Bicycles & Transit: A Partnership that Works
    ,Information Sheet
    09-20-99

    Describes how transit agencies around the country are building bicycle and transit connections.

    Birth of a Grant
    ,Guidelines,Instructions,Presentation
    05-18-11

    PDF that explains how a grant is created.

    Bithop Systems [PDF]
    ,Brochure
    04-14-07

    Breakdown of Bithop systems and their capibilities within the FTA

    BOOZ ALLEN [PDF]
    ,Information Sheet
    12-20-07

    Booz Allen Hamilton FTA capabilities statement

    BPC GROUP CAPABILITY STATEMENT ONE [PDF]
    ,Information Sheet
    06-23-08

    BPC Group statement about capabilties within the FTA and list of project BPC Group is involved in.

    BPC GROUP CAPABILITY STATEMENT THREE [PDF]
    ,Information Sheet
    06-21-08

    BPC group modeling capabilties within FTA and example project that have benefitted.

    BPC GROUP CAPABILITY STATEMENT TWO [PDF]
    ,Information Sheet
    06-21-08

    BPC Group and thier capabilities witihng FTA regarding environmental services.

    Brochure - FMO Seminars 2007
    ,Brochure
    Bus and Bus Facilities Discretionary Program Grants (Section 5309)
    ,Fact Sheet,Information Sheet
    03-08-07

    Priorities established by the FTA for the discretionary program, criteria FTA will use in evaluating applications, and describes how to apply.

    Bus Livability FAQs
    ,Fact Sheet,Information Sheet
    07-18-11

    FAQ for 2011 Bus Livability program

    Bus Manufacturer Survey: Appendix B
    ,Information Sheet
    01-19-06

    Vehicle market reliability study suvey for bus manufacturers.

    Bus Manufacturers Interview Worksheet: Appendix C
    ,Information Sheet
    02-02-06

    FTA non rail vehicle market viability study bus manufacturer interview worksheet

    Bus Study Survey: Appendix A
    ,Fact Sheet,Information Sheet
    01-19-06

    FTA survey on non rail vehicle market viability.

    Capital Cost Database
    ,Information Sheet
    01-04-11

    Microsoft Access Database

    CDI [PDF]
    ,Brochure
    01-28-04

    CDI services capabilities withing FTA as well as project tey have worked on.

    CEM for LRV [PDF]
    ,Guidelines,Instructions
    02-14-08

    Possible collision safety improvement for light rail vehicles operating in shared right of way stree environments.

    Census and FTA Formula Grants
    Century Diversified [PDF]
    ,Information Sheet
    12-19-07

    Summary of the capabilities of Century Diversified within FTA.

    CH2M Hill [PDF]
    ,Information Sheet
    03-05-08

    CH2M Hill capabilties statement for the FTA.

    Charlotte Risk Assessment Presentation (PPT)
    ,Meeting,Presentation
    03-24-11

    Complete breakdown of risks associated with the South Corridor light rail project.

    Charlotte Risk Assessment Presentation (Word)
    ,Presentation
    05-09-05

    South Corridor Light Rail Project: Project Risk Assessment

    Charlotte State Programs Team Meeting Summary
    ,Meeting
    04-09-08

    Minutes from the Charlotte state programs team meeting about various program sates and comments.

    Chicago Transit Authority vs A&D Davenport Transportation Dec 1, 1976 (PDF)
    ,Fact Sheet,Information Sheet
    03-24-09

    Findings about the complaint between A&D Davenport Transportaion and radford School Bus District.

    Childcare Services at Transit Stations
    ,Presentation,Report
    11-12-05

    2005 report on successful examples of colocating childcare facilities at public transit centers including background and plans for further development.

    Civil Rights
    ,Accessibility,Information Sheet,Instructions
    04-22-08

    Reminder from the FTA to complete all paperwork and publications required for the DBE program.

    Coastal Georgia RDC Presentation
    ,Presentation
    11-01-07

    Study for Coastal Georgia Region to develop a plan for coordinated, regional transportation system.

    Co-Lead Categorical Exclusion Process [PDF]
    ,Final Guidance
    08-03-03

    Sound Transit categorical exclusion process becakground and information.

    Co-Lead Environmental Re-Evaluation Worksheet [PDF]
    ,Checklist
    08-06-03

    Woksheet from FTA for the environmental co-lead to fill out about the project.

    Co-Lead NEPA Categorical Exclusion Worksheet [PDF]
    ,Forms
    08-06-03

    Co-lead environmental review worksheet to determine categorical exclusions for NEPA.

    Columbia/Equador
    ,Meeting,Presentation
    03-20-07

    Power Point Presentation on transportation in Colombia and Equador

    Common Environmental Performance Commitments
    ,Information Sheet
    06-03-04

    Proposed commitments for the Lower Manhattan FTRC envorimental plan.

    Community Transportation Association - Joblinks Employment
    ,Meeting,Presentation
    04-30-01

    Joblinks presentation explaining the purpose and goals withing FTA.

    Comparison of Flexible Fund Obligations by Purpose and by State
    ,Fact Sheet,Information Sheet
    01-21-03

    Complete flexible fund breakdown for each state through fiscal year 1992 to fiscal year 2002.

    Comparison of Flexible Fund Obligations by Purpose for UZAs Greater than 1 Million Population
    ,Fact Sheet,Flowchart
    01-21-03

    Flexible fund obligation breakdown for all UZAs over one million in population for fiscal year 1992 through fiscal year 2002.

    Conference Report
    ,Fact Sheet,Information Sheet,Report
    09-09-05

    Details about the SAFTEA-LU new freedom program.

    Conflict of Interest Requirements Involving Environmental and Engineering Services [PDF]
    ,Final Guidance
    06-05-01

    Adhering to conflict of interest requirements in contracts involving environmental and engineering services.

    Conflict of Interest Requirements Involving Environmental and Engineering Services [PDF]
    ,Final Guidance
    08-06-03

    Hlping to assure that contracts with environmental and engineering dont not create a conflict of intrest.

    Conflict of Interest Requirements Involving Environmental and Engineering Services [PDF]
    ,Final Guidance
    06-05-01

    Adhereing to conflict of interest requirements in contracts.

    Construction Project Management Handbook (2009 Update)
    ,Guidelines,User Guide
    09-22-09

    Construction Project Management Handbook: Updated 2009 Edition

    Copy of FY 2010 Financial Management Oversight Registration Form
    ,Forms
    01-25-10

    Registration form for attendance to the fiscal year 2010 FTA financial mangement oversight seminar.

    Copy of FY 2010 Financial Management Oversight Seminar Overview
    ,Oversight,Seminar
    01-25-10

    Description of the seminar purpose and who should attend as well as things that will be discussed.

    Creating Section 508 Compliant Documents & Presentations
    ,Meeting,Presentation
    11-17-05

    Guidlines for creating section 508 compliant documentation.

    Cumulative Flexible Fund Transfers to All FTA Programs FY 1992 - 2002
    ,Fact Sheet,Information Sheet
    12-30-02

    A listing of all flexible fund transfers to all FTA programs by state from 1992 to 2002.

    DAVID EVANS CAPABILITY [PDF]
    ,Information Sheet
    12-20-07

    David evans and associated capabilities statement.

    Day 1 - Charter Final Rule Presentation
    ,Meeting,Presentation
    04-08-08

    Description of the new charter rule and how to find more information.

    Day 1 - AM - Beyond the Recession - Kentucky
    ,Meeting,Presentation
    04-16-09

    The effects of the recession in Kentucky as well as the measure the state is taking to counteract the effects.

    Day 1 - AM - Beyond the Recession - Mississippi
    ,Meeting,Presentation
    04-16-09

    The effects of the recession in Mississippi and the measures the state is taking to counteract them.

    Day 1 - AM - Beyond the Recession - South Carolina
    ,Meeting,Presentation
    04-16-09

    The effects of the recession in South Carlina and the measures the state is taking to counteract them.

    Day 1 - AM - State DOT Atlanta Meeting_April 2009 - Welcome and Beyond the Recession
    ,Meeting,Presentation
    04-16-09

    Schedule of events and guidelines for state recession presentations.

    Day 1 - Ia - NEPA Basics - Immings
    ,Meeting,Presentation
    05-19-08

    NEPA basic concepts and implementation.

    Day 1 - Ib - FTA 101 - Pfister
    ,Meeting,Presentation
    05-21-08

    FTA 101 training presentation.

    Day 1 - Ic - Third Party Procurement - Buy America - Jensen
    ,Meeting,Presentation
    05-28-08

    Presentation on whats new for the buy amercian FTA program.

    Day 1 - Ic - Third Party Procurement - JHarper
    ,Meeting,Presentation
    05-28-08

    Third party procurment region IV workshop presentation.

    Day 1 - Id - Safety and Security - Lazaro
    ,Meeting,Presentation
    05-28-08

    FTA transit bus safety and sercuity program overview presentation.

    Day 1 - IIa - NEPA Cat Ex - Immings
    ,Presentation
    05-19-08

    Categorical exclusion and how to differentiate and document CatX.

    Day 1 - IIb - Grant Making 101 - LaShore
    ,Meeting,Presentation
    05-19-08

    Grant Making 101 presentation.

    Day 1 - IIc - Charlotte TOD - Votaw
    ,Meeting,Presentation
    05-19-08

    Scaleybark TOD/ joint development project presentation.

    Day 1 - IId - Innovative Finance - Martin
    ,Meeting,Presentation
    05-19-08

    Various region IV financing options and their pros and cons.

    Day 1 - IId - Innovative Financing - SMyers
    ,Meeting,Presentation
    05-20-08

    Region IV conference presentation on innovative transit financing.

    Day 1 - IId - Innovative Financing - TBishop
    ,Meeting,Presentation
    05-15-08

    Description of funding problems and innovative ways to increase funding for FTA projects.

    Day 1 - IId - Innovative Financing - Volinski
    ,Meeting,Presentation
    05-20-08

    Lessons learned in transit efficiencies, cost reductions, and revenue generation.

    Day 1 - IIIa - Planning for a Transit Facility
    ,Meeting,Presentation
    05-20-08

    Examines the federal requirements for various types of tranist facilities.

    Day 1 - IIIb - FTA Grant Management and Reporting 101
    ,Meeting,Presentation
    05-20-08

    Grants managment 101 presentation.

    Day 1 - IIIc - NS and SS Overview - Day
    ,Meeting,Presentation
    05-20-08

    Overview of new starts and small starts programs beth day presentation.

    Day 1 - IIId - MSAA - Atlanta
    ,Meeting,Presentation
    05-28-08

    Atlant TMCC presentation.

    Day 1 - IIId - MSAA - Louisville
    ,Meeting,Presentation
    05-20-08

    Lousiville region: travel management coordination center.

    Day 1 - IIId - MSAA - LSCOG
    ,Meeting,Presentation
    05-20-08

    LSTMCC taskforce for better mobiltity.

    Day 1 - IIId - MSAA - Orlando
    ,Meeting,Presentation
    05-20-08

    MORETMCC presentation.

    Day 1 - IIId - MSAA - Schilling
    ,Meeting,Presentation
    05-20-08

    MSAA/UWR Initiatives and target agencies.

    Day 1 - Intercity Bus Presentation
    ,Meeting,Presentation
    04-08-08

    Intercity bus transit requirement presentation.

    Day 1 - Lunch - ARRA
    ,Meeting,Presentation
    04-16-09

    FTA ARRA presentation and introduction

    Day 1 - Lunch - ARRA - Kentucky
    ,Meeting,Presentation
    04-16-09

    Kentucy ARRA project slection and continuing fund processes

    Day 1 - North Carolina Rural Vanpool Program
    ,Meeting,Presentation
    04-09-08

    NC vanpool program presentation.

    Day 1 - PM - FTA Guidance Updates and New Information
    ,Meeting
    04-16-09

    Description of policy changes and updates to the new freedom, section 5310, and coordinated planning FTA documentation.

    Day 1 - PM - FTA Tracking and Transferring Funding
    ,Meeting,Presentation
    04-16-09

    Tracking and transferring funding presentation.

    Day 1 - PM - Intercity Bus Consultation Letter
    ,Meeting,Presentation
    04-09-09

    RIPTA letter confirming that the intercity bus needs are met.

    Day 1 - PM - Intercity Bus Program
    ,Meeting,Presentation
    04-16-09

    FTA intercity transit program overview.

    Day 1 - PM - Particulate Matter 2.5
    ,Meeting
    04-15-09

    PM 2.5 designations for air quality conformity presentation.

    Day 1 - PM - Planning for a Transit Facility in Small Urbanized and Rural Areas
    ,Meeting
    04-16-09

    Planning presention for transit facilities in small urbanized and rural areas.

    Day 1 - State DOT Charlotte Meeting Overview
    ,Meeting,Presentation
    04-08-08

    Charlotte state program team semi-annual meetingschedule and breakdown of events.

    Day 2 - State Management Review Presentation
    ,Meeting,Presentation
    04-08-08

    State oversight management review presentation.

    Day 2 - Transit Facility Planning
    ,Meeting,Presentation
    04-08-08

    Guidiance presentation for how to plan for a tansit facility using FTA funds.

    Day 2 - AM - State Management Review and Oversight
    ,Meeting,Presentation
    04-16-09

    State management review fiscal year 2008 and beyond.

    Day 2 - AM - ARRA Reporting Requirements
    ,Meeting
    04-16-09

    ARRA certifications and reporting requirements presentation.

    Day 2 - AM - Civil Rights
    ,Meeting,Presentation
    04-16-09

    FTA civil rights and ARRA 2009 programs presentation

    Day 2 - AM - Connecting Communities
    ,Meeting,Presentation
    04-16-09

    onnectiong communities and emergency reporting FTA region IV presnetation.

    Day 2 - AM - FY2009 Grant Making Procedures
    ,Meeting,Presentation
    04-16-09

    Fiscal year 2009 grant making dealine and procedure recap.

    Day 2 - AM - Grants Management
    ,Meeting,Presentation
    04-15-09

    Grant mangement reporting and close outs.

    Day 2 - Coordinated Planning - KYTC
    ,Meeting,Presentation
    04-08-08

    Kentucky coordinated plan update FTA state programs meeting.

    Day 2 - Coordinated Planning - SCDOT
    ,Meeting,Presentation
    04-08-08

    A guide through the coordinated planning process.

    Day 2 - Coordinated Planning Part II
    ,Meeting,Presentation
    04-08-08

    Region IV coordinated planning presentation part 2

    Day 2 - Grant Manangement Presentation
    ,Meeting,Presentation
    04-08-08

    Grant management and close outs presentation.

    Day 2 - IVa - Joint Planning Regs - Garland
    ,Meeting,Presentation
    05-18-08

    Joint FHWA/FTA planning regulations final rule key requirements presentation.

    Day 2 - IVb - Technical Capacity - Whyte
    ,Meeting,Presentation
    05-20-08

    Presentation about expanding the technical capacity in FTA programs.

    Day 2 - IVc - Small Starts Program - Day
    ,Meeting,Presentation
    05-20-08

    Small and very small starts program beth day presentation.

    Day 2 - IVd - University Research - Volinski
    ,Meeting,Presentation
    05-20-08

    UTC universities and their purpose and role in urban transit research.

    Day 2 - NTD Rural Reporting Presentation
    ,Meeting,Presentation
    04-08-08

    Rural reporting national transit database presentation.

    Day 2 - Time Management for FTA Grant Making Presentation
    ,Meeting,Presentation
    04-08-08

    Time management for FTA grant making presentation.

    Day 2 - Va - ARC Coordinated Planning
    ,Meeting,Presentation
    05-20-08

    Planning PDF, designed for Region 4, specifically city of Atlanta.

    Day 2 - Va - Coordinated Planning - Schilling
    ,Presentation
    04-20-08

    FTA region IV conference coordinated planning session presentation.

    Day 2 - Va - SCDOT Coordinated Planning
    ,Meeting,Presentation
    05-29-08

    Grantee Conference Region 4: South Carolina

    Day 2 - Vb - Oversight Programs - White
    ,Meeting,Presentation
    05-20-08

    FTA oversight programs presentation.

    Day 2 - Vc - University Transit - Anoka
    ,Meeting,Presentation
    05-20-08

    University transit presentation.

    Day 2 - Vc - University Transit - JLibby
    ,Meeting,Presentation
    05-29-08

    University transportation systems presentation.

    Day 2 - Vc - University Transit - RTS
    ,Meeting,Presentation
    05-20-08

    UF RTS partnership presentation.

    Day 2 - Vd - Going Green - Martin
    ,Meeting,Presentation
    05-20-08

    Public transit and sustainability presentation.

    Day 2 - Vd - Going Green - Thomas_Low_CouncilReportVII
    ,Meeting,Presentation
    04-28-08

    Study detailing the ways in which to go gren with urban transit.

    Day 2- AM - ARRA Reporting Requirements
    ,Meeting
    04-16-09

    ARRA and TIGGER reporting and certifications requirements presentation.

    Day 2 AM - Charter Final Rule
    ,Guidelines,Presentation
    05-20-08

    Charter service final rule description and breakdown.

    Day 2 PM - Transit Security and Emergency Preparedness
    ,Presentation
    05-20-08

    Transit security and emergency preparedness overview presentation.

    Day 3 - CCAM Panel - Schilling
    ,Guidelines,Presentation
    05-20-08

    CCAM program breakdown presentation.

    Day 3 - Mobility Management - Jim McLary
    ,Presentation
    05-20-08

    Mobility managmeent presnetation.

    Day 3 - Mobility Management - St. Johns County
    ,Presentation
    05-20-08

    Mobility management presentation.

    Day 3 - Mobility Management - TARC
    ,Presentation
    05-20-08

    Transit Authority of River City: To explore transportation opportunities that enhance social, economic and environment of the Greater Louisville community

    Day 3 - TeamWeb - Anoka
    ,Meeting,Presentation
    05-20-08

    FTA team web presentation

    Debt Service Reserve Pilot Program – September 2008 [PDF]
    ,Policy Letter
    09-23-08

    Letter detailing the effectiveness od the debt service reserve pilot program.

    Debt Service Reserve Pilot Program – September 2008 [Word]
    ,Policy Letter
    09-23-08

    Letter detailing the effectiveness of the debt service reserve pilot program.

    Debt Service Reserve Reimbursement Pilot Program - Composite Version (Corrected) PDF
    ,Forms
    02-23-07

    Description of the debt service reserve pilot program and its proposed purpose.

    December 2008 Transit Research Update
    ,News Update
    12-05-08

    Transit research update detailing all the FTA research done in 2008.

    December 2009 Transit Research and Industry News Update
    ,News Update
    01-15-10

    Transit research update detailing the research done by FTA in 2009.

    Delcan [PDF]
    ,Information Sheet
    12-19-07

    Delcan capabilities statement.

    Delcan Transportation Information Technology [PDF]
    ,Information Sheet
    05-25-07

    Delcan capabilities statement for the FTA.

    Deloitte Financial Advisory Services [PDF]
    ,Information Sheet
    12-20-07

    Deloitte Financial Advisory Services LLP financial advisory capabilities within FTA.

    Designated Recipients for the Job Access & Reverse Commute (JARC) Program
    ,Information Sheet
    01-08-07

    List of cities and the names of the transit agencies recieving JARC program funds.

    Designated Recipients for the New Freedom Program
    ,Information Sheet
    01-08-07

    List of recipients of new freedom project funds by UZA.

    Developing Effective Mass Transit Systems: Proceedings of the 5th International Workshop on Public Transportation
    ,Meeting,Presentation
    04-04-08

    Description of various plans to improve mass tansit in Moscow.

    DHA CAPABILITY STATEMENT [PDF]
    ,Information Sheet
    12-20-07

    DHA capabilities statement.

    Directions
    ,Instructions
    04-16-08

    Direction to LRTA hale stree bus maintanence facility.

    Disadvantaged Business Enterprise Program Goal Setting Process
    ,Meeting,Presentation
    03-23-06

    How to determine what you need to do as a DBE receiving FTA funds.

    Disadvantaged Business Enterprise Program Goal Setting Process [DOC]
    ,Information Sheet
    11-28-07

    How to determine what you need to do as a DBE recieving FTA funds.

    Discussion #1 – Allowances in the Valuation of Project Benefits and Determination of Cost-Effectiveness For Proposed New Starts Projects (Word)
    ,Information Sheet
    05-15-06

    Breakdown of the the FTA obtains rating and measurements for cost-effectiveness.

    Discussion #1 – Table 1. Alterative Methods for Computing Cost-Effectiveness (Excel)
    ,Forms
    03-07-06

    A sample of the way that the FTA computer cost-effectiveness.

    Discussion #10 – Additional Measures for Quality Control of New Starts Forecasts (Word)
    ,Information Sheet
    06-02-06

    Steps to ensure new starts projects maintain a high quality control level.

    Discussion #11 – Illustrative Mode-Choice and Summit Calculations for Travel by One Market Segment between a Pair of Zones for Base and Build Alternatives (Word)
    ,Guidelines
    03-28-06

    Describes how the FTA model works to determine a definitive mode choice for optimal cost-effectiveness.

    Discussion #11 – Spreadsheet example of Summit calculations (Excel)
    ,Forms
    03-07-06

    Interactive spreadsheet detailing the caculations being made to determine mode choice.

    Discussion #16 – Calibration and Validation of Travel Models for New Starts Forecasting (Word)
    ,Information Sheet
    06-06-06

    Calibration and validation of travel models for new starts forecasting.

    Discussion #17 – Methods for Collection of Data on Transit Riders (Word)
    ,Information Sheet
    06-13-06

    Description of methods it is possible to use for collecting data on transit riders.

    Discussion #18 – Preservation and Analysis of Travel Forecasts for New Starts Projects (Word)
    ,Information Sheet
    06-06-06

    Preservation and anlysis of travel forecasts for new starts projects.

    Discussion #3 – Evaluation of Highway Capacity Congestion Relief Benefits (Word)
    ,Information Sheet
    05-30-06

    FTA's evaluation of the FHWA's highway congestion relief benefits.

    Discussion #4 – Ridership and User Benefits from Variable Trip Tables (Word)
    ,Information Sheet
    06-06-06

    Ridership and user benfits from variable trip tables.

    Discussion #4 – Spreadsheet example of user benefits calculation from variable trip tables (Excel)
    ,Flowchart
    02-25-02

    Collection of different models used by the FTA in calculations for user benefits.

    Discussion #5 – Ridership and User Benefits from Variable Trip Ends (Land Use and Economic Development) (Word)
    ,Information Sheet
    06-12-06

    Ridership and user benfits from variable trip ends.

    Discussion #6 – Predicted and Actual Ridership of Proposed New Starts Projects (Word)
    ,Information Sheet
    06-06-06

    Predicted and actual ridership of proposed new starts projects.

    Discussion #7 – Library of Survey Data for Quality Control on Forecasts for New Starts Projects [Doc]
    ,Information Sheet
    06-13-06

    Library of survey data for quality control on forecasts for new starts projects.

    Discussion #8 – CTPP-based Aggregate Model (Word)
    ,Information Sheet
    06-06-06

    CTPP-based aggregate model.

    Discussion #9 – Semi-independent Forecasts of Ridership and User Benefits for New Starts Projects (Word)
    ,Information Sheet
    06-06-06

    Semi-independant forecasts of ridershipand user benefits for new starts projects.

    DKI Engineering and Consulting [PDF]
    ,Information Sheet
    02-29-08

    DKI engineering capabiltiies.

    DMJM Harris AECOM [PDF]
    ,Information Sheet
    12-20-07

    DMJM Harris capabilities.

    Do you Want ot Build a Facililty with Federal Funds
    ,Meeting,Presentation
    11-28-07

    Presentation detailing planning procedures and requirements for buildings contructed with federal funds.

    Do You Want to Build a Facility with Federal Funds? [DOC]
    ,Information Sheet
    11-28-07

    Presentation detailing planning procedures and requirements for buildings contructed with federal funds.

    Documented Categorical Exclusion (DCE) Worksheet - FTA / FHWA Co-Lead
    ,Forms
    05-13-08

    DCE worksheet for the FTA and FHWA.

    Documented Categorical Exclusion (DCE) Worksheet - FTA Lead
    ,Forms
    05-13-08

    FTA CE and DCE worksheet to meet NEPA requirements.

    Documented Categorical Exclusion (DCE) Worksheet - FTA Lead
    ,Forms
    05-13-08

    FTA CE and DCE worksheet.

    Documented Categorical Exclusion Checklist
    ,Checklist,Forms
    05-17-10

    Checklist to determine categorical exclusion eligibility.

    DOT Guidance on Special Language Services to LEP Beneficiaries
    ,Guidelines
    01-03-06

    Federal register volume 70 number 239.

    DOT Order to Address Environmental Justice
    ,Environment,Guidelines
    01-27-05

    OST docket number OST-95-141 (50125).

    DRAFT FTA Guidance on the Application of 49 U.S.C. 5324(c) to Railroad ROW Acquisition
    ,Guidelines,Information Sheet
    12-29-08

    Details how the FTA recommends grantess implement the ROW program.

    Draft Operating and Maintenance Costs Chapter
    ,Guidelines,Report
    12-20-06

    Breakdown of the operating and maintenance costs for FTA projects.

    EAC CONSULTING CAPABILITY STATEMENT [PDF]
    ,Information Sheet
    05-20-08

    EAC consulting capabiltities staement.

    ECHO Web User Manual for FTA and FAA Grantees
    ,User Guide
    05-24-12

    ECHO web 2010 update for the grantee users manual.

    Elements of Internal Controls - Preventing Fraud Waste and Abuse
    ,Meeting,Presentation
    10-22-07

    Presentation on preventing fraud, waste, and abuse in transit systems.

    Elements of Internal Controls - Preventing Fraud Waste and Abuse in Urban and Rural Transit Systems [DOC]
    ,Information Sheet
    11-28-07

    Details on preventing fraud, waste, and abuse in transit systems.

    Embezzlement 101
    ,Meeting,Presentation
    11-02-07

    Embezzlement 101 presentation.

    Embezzlement 101 [DOC]
    ,Information Sheet
    11-28-07

    Embezzlement education document.

    Endangered Species Act (ESA) Handbook [PDF]
    ,User Guide
    12-31-07

    Description of the ESA and how it affects the FTA.

    Endangered Species Act (ESA) Screening Checklist [PDF]
    ,Checklist
    08-06-03

    FTA ESA screeing checklist for grantees.

    Endangered Species Act Compliance [PDF]
    ,Final Guidance
    08-06-03

    Descripion of how the ESA impacts Sound Transit projects.

    Environmental Analysis Framework
    ,Information Sheet
    06-03-04

    Environmental framework for federal tranportation recovery projects in lower manhattan.

    Environmental Analysis Framework
    ,Guidelines
    06-03-04

    Evironmental analysis framwork for federal transportation recovery projects in lower manhattan.

    Environmental Assessment FONSI Format [PDF]
    ,Final Guidance
    01-04-01

    Format and appproval for a FONSI.

    Environmental Assessment Signature Page [PDF]
    ,Final Guidance,Forms
    01-26-11

    EA signature page.

    Environmental Benefits of Alternative Fuels and Advanced Technology in Transit
    ,Meeting
    08-09-07

    Detailed report showing the impact of fuel efficiency and lower emissions.

    Environmental Determination Re-Evaluation Checklist [PDF]
    ,Checklist
    08-06-03

    Report to aid sponsoring agencies in gathering and organizing materials for re-evaluation under the ESA.

    Environmental Justice [PDF]
    ,Final Guidance
    08-06-03

    Report describing the ESa and its effect on Sound transit projects.

    Environmental Justice Executive Order
    ,Executive Order
    02-08-05

    Order from the president for evironmental protection in minority and low income populations.

    Environmental Performance Commitments
    ,Information Sheet
    03-07-07

    Lower Manhattan FTA proposed commitments to evironmental safety.

    Environmental Protection Agency - Transportation and Brownfields
    ,Fact Sheet,Information Sheet
    07-07-00

    Transportation and brownfields EPA project.

    Environmental Re-Evaluation Process [PDF]
    ,Final Guidance
    08-06-03

    Report about the steps needed to ensure the ESA is complied with during sound transit projects.

    Essential Fish Habitat [PDF]
    ,Final Guidance
    09-06-01

    MSA - EFH report.

    Eugene, OR: Lane Transit District
    ,Information Sheet
    04-10-07

    LTD EMX BRT expasnionand information publication.

    Excel File
    ,Fact Sheet,Guidelines,Information Sheet
    06-10-98

    FTA scope and activity line item codes.

    Executive Order 11988
    ,Executive Order
    05-24-77

    Floodplain mangement executive order.

    FAQs
    ,Fact Sheet
    03-10-10

    Alternative transportation in parks and public lands FaQs.

    FAQs
    ,Fact Sheet,Information Sheet
    01-17-07

    Frequently Asked Questions: Alternative Transportation in Parks and Public Lands 

    Feasibility Study on the Use of Personal GPS Devices in Paratransit
    ,Information Sheet,Report
    05-27-09

    Report detailing the pros and cons to GPS devices in paratransit.

    February 2008 Transit Research Update
    ,News Update
    02-26-08

    Complete update for 2008 of all ongoing FTA programs and assignments.

    Federal Register Notice
    ,Information Sheet
    12-18-09

    ARRA public transit on indian reservations program project selections.

    Federal Transit Administration Cooperative Agreement, FTA C(11) October 1, 2004
    ,Agreements
    10-01-04

    FTA c-11 agreement.

    Federal Transit Administration Cooperative Agreement, FTA C-12, October 1, 2005
    ,Agreements
    10-01-05

    FTA C-12 agreement.

    Federal Transit Administration Cooperative Agreement, FTA C-13, October 1, 2006
    ,Agreements
    10-01-06

    FTA C-13 agreement.

    Federal Transit Administration Grant Agreement, FTA G(11) October 1, 2004
    ,Agreements
    10-01-04

    FTA G-11 agreement.

    Federal Transit Administration Grant Agreement, FTA G-12, October 1, 2005
    ,Agreements
    10-01-05

    FTA G-12 agreement.

    Federal Transit Administration Grant Agreement, FTA G-13, October 1, 2006
    ,Agreements
    10-01-06

    FTA G-13 agreement.

    Federal Transit Administration Master Agreement, FTA MA(11), October 1, 2004
    ,Agreements
    10-01-04

    FTA master agreement revision 11.

    Federal Transit Administration Master Agreement, FTA MA(12), October 1, 2005
    ,Agreements
    10-01-05

    FTA master agreement revision 12.

    Federal Transit Administration Master Agreement, FTA MA(13), October 1, 2006
    ,Agreements
    10-01-06

    FTA master agreement revision 13.

    Federal Transit Administration Master Agreement, FTA MA(9), October 1, 2002
    ,Agreements
    10-01-02

    FTA master agreement revision 9.

    Federal Transit Administration Supplemental Agreement, Attachment to FTA G-12, October 1, 2005
    ,Agreements
    11-07-05

    FTA supplemental grant agreement.

    Federal Transit Administration Supplemental Agreement, Attachment to FTA G-13, October 1, 2006
    ,Agreements
    10-06-05

    FTA supplemental grant agreement.

    Federal Transit Administration Supplemental Agreement, FTA S(11) October 1, 2004
    ,Agreements
    10-01-04

    FTA supplemental agreement G-11.

    Federal Transit Programs - Fiscal Year 2004 Requirements
    ,Agreements
    10-15-03

    FTA fiscal year 2004 certifications and assurances report.

    Federal Transit Programs Fiscal Year 2005 Requirements
    ,Fact Sheet,Guidelines,Information Sheet
    09-15-04

    FTA programs fiscal year 2005 requirements.

    Federal Transit Programs Fiscal Year 2006 Citations
    ,Fact Sheet
    11-07-05

    Fiscal year 2006 listing of all legislation changes.

    Federal Transit Programs Fiscal Year 2007 Citations
    ,Information Sheet
    10-02-06

    Fiscal year 2007 listing of all legislation changes.

    Figure 1: Map of New Starts Projects with Pending and Full Funding Grant Agreements [PDF]
    ,Agreements
    01-03-03

    Pending and existing full funding grants agreements map.

    Figure 2: Map of New Starts Projects in Preliminary Engineering and Final Design [PDF]
    ,Flowchart
    12-13-02

    FTA map of new starts projects in prelinimary engineering and final design.

    Final Design (FD) Process Requirements Checklist [Word]
    ,Checklist
    05-01-08

    Checklist of FTA project submittals to enter final design.

    Financial Management Oversight
    ,Meeting,Presentation
    04-18-07

    FMO presentation.

    Financial Review Lessons
    ,Meeting,Presentation
    11-26-07

    Financial management lessons learned presentation.

    Fiscal Year 2011 Annual List of Certifications and Assurances for Federal Transit Administration Grants and Cooperative Agreements
    ,Information Sheet
    10-29-10

    Cosolidation of certificates and assurances summaries and reports.

    Flexible Fund Obligations by Area, with State Totals
    ,Fact Sheet,Information Sheet
    10-01-02

    Flexible fund obligations by area with state totals.

    Flexible Fund Obligations by FTA Grantee
    ,Fact Sheet,Flowchart,Information Sheet
    10-01-02

    Flexible fund obligations by FTA grantee

    Flexible Fund Obligations for Transit Projects by Purpose and by Fund Type -- FY 1992 - 2002
    ,Flowchart
    10-01-03

    Pie chart describing the flexible fund breakdown for 1992 through 2002.

    Flexible Fund Obligations for Transit Projects by Purpose and by Population Group -- FY 1992 - 2002
    ,Fact Sheet,Flowchart
    10-01-02

    Flexible fund ibligations for transit projects by purpose and by population group.

    Flexible Fund Obligations for Transit Projects by Purpose and by Program -- FY 1992 - 2002
    ,Flowchart
    10-01-02

    Flexible fund obligations for transit projects bye purpose and by program.

    Flexible Fund Obligations, by State and Fiscal Year
    ,Fact Sheet,Information Sheet
    10-01-02

    Flexible fund obligations by state and fiscal year.

    Flexible Fund Projects by State
    ,Fact Sheet,Flowchart,Information Sheet
    10-01-02

    Flexible fund projects by state.

    Flexible Fund Transfers, by State and Fiscal Year
    ,Fact Sheet,Information Sheet
    10-01-02

    Flexible fund tranfers by state and year.

    Flexible Fund Utilization FY 1992 - 2002
    ,Fact Sheet
    10-01-02

    Fiscal year flexible fund breakdown.

    FMO Seminar Workbook - Day One
    ,Presentation,Workbook
    04-19-07

    Seattle FMO seminar presentation.

    FMO Seminar Workbook - Day Two
    ,Presentation,Workbook
    04-19-07

    Seattle FMO seminar presentation.

    FTA - New Start Risk Assessment Process (PPT)
    ,Meeting,Presentation
    04-05-04

    FTA presentation about risk and risk assessment.

    FTA - New Start Risk Assessment Process (Word)
    ,Meeting,Presentation
    05-18-05

    FTA documentation about risk and risk assessment.

    FTA 101 Training
    ,Guidelines,Training
    06-17-10

    State programs team FTA 101 training presentation.

    FTA BPA Ordering Procedures
    ,Fact Sheet,Information Sheet
    06-08-05

    Description of the method to use the BPA in 2005.

    FTA BPA Recipients
    ,Information Sheet
    05-26-05

    2005 BPA contractor listing.

    FTA Construction Roundtable: AirTrain Presentation [DOC]
    ,Meeting,Presentation
    05-03-04

    Report on AirTrain for JFK Airport

    FTA Construction Roundtable: AirTrain Presentation [PPT]
    ,Meeting,Presentation
    05-03-04

    Power Point Presentation on AirTrain For JFK Airport.

    FTA Fiscal Year 2005 Appportionments, Allocations and Program Information: Notice
    ,Fact Sheet,Information Sheet
    12-13-04

    Fiscal year 2005 JARC program allocations and amounts.

    FTA Fiscal Year 2005 Requirements compared to Fiscal Year 2004
    ,Information Sheet
    09-21-04

    Comparison of fical year 2004 and 2005 grant agreements.

    FTA Fiscal Year 2007 Requirements compared to Fiscal Year 2006
    ,Agreements,Information Sheet
    11-02-05

    Fical year 2006 and 2007 comparison of grante agreements.

    FTA FY 2006 Strategic Business Plan Summary
    ,Fact Sheet
    07-26-06

    FTA fiscal year 2006 strategic business plan summary.

    FTA General Acquisition & Relocation Brochure
    ,Brochure
    07-20-06

    Details about the FTA's aquisition and relocation program.

    FTA Guidance on the Application of 49 U.S.C. 5324(c) to ROW Acquisition
    ,Guidelines,Information Sheet
    04-29-09

    FTA guidelines on achieving ROW aquisition.

    FTA National Fuel Cell Bus Program Projects
    ,Presentation
    09-27-07

    Consolidation of all fuel cell bus programs managed by the FTA.

    FTA New Starts Project Development Process
    ,Meeting,Presentation
    12-13-06

    Detailed look at the development process for new starts projects.

    FTA New Starts Project Development Process [DOC]
    ,Information Sheet
    11-28-07

    Detailed look at the development process for new starts projects.

    FTA Performance Measurement Policy Statement
    ,Information Sheet
    07-26-06

    Breakdown of the FTA's policy on performance measurements.

    FTA Region IV - Day 1 State Programs Meeting Summary
    ,Meeting
    09-13-07

    GRTA board room minutes for the FTA region IV state programs meeting.

    FTA Region IV Conference Program
    ,Meeting,Presentation
    05-28-08

    FTA Region IV 2008 Conference – “The Route to Success… Today and Beyond!”

    FTA Region IV Earmark Process Flow Chart
    ,Flowchart,Workshop
    03-31-09

    Flowchart depicting earmark grants and how they are awarded.

    FTA Research Requirements
    ,Meeting,Presentation
    04-10-07

    FTA research requirements presentation.

    FTA Ridership Symposium Charlotte Presentation 052808
    ,Presentation
    05-19-08

    Ridership gains strategies presentation.

    FTA Ridership Symposium Nashville 52808
    ,Presentation
    05-28-08

    FTA ridership symposium luncheon presentation on the Nashville MTA.

    FTA State of Good Repair Summit Presentation
    ,Presentation
    08-01-08

    FTA state of good repair presentation.

    FTA’s SOGR Potential Concepts
    ,Information Sheet
    07-19-10

    FTA's stae of good repai program goals and concepts.

    Full Funding Grant (FFGA) Agreement Process Requirements Matrix Template [PDF]
    ,Forms
    08-06-03

    Region X FFGA application checklist.

    Full Funding Grant Agreement (FFGA) Checklist [Word]
    ,Checklist
    05-01-08

    New starts project planning and dvelopment checlist.

    Functional IT [PDF]
    ,Information Sheet
    02-29-08

    Functional IT statement of capabilities.

    FY 2005 Capital Program - New Starts Obligations, by Category for UZAs
    ,Road Map
    10-01-05

    Fiscal year 2005 capital program obligations for new starts.

    FY 2005 Metropolitan Planning and State Planning and Research Program Apportionments Table 2
    ,Fact Sheet,Information Sheet
    10-01-05

    Section 5303 and 5313(b) apportionments.

    FY 2005 to FY 2006 Comparison
    ,Fact Sheet,Information Sheet
    08-02-06

    Fical year 2006 year over year comparison.

    FY 2006 and 2007 Certifications & Assurances for Tribal Transit Program (Word Doc)
    ,Agreements
    05-10-07

    2006-2007 Tribal Certifications and Assurances Document

    FY 2006 Certs and Assurances
    ,Agreements
    05-01-06

    Fiscal year 2006 FTA certifications and assurances document.

    FY 2006 to FY 2007 Comparison
    ,Fact Sheet
    08-02-06

    Fiscal year 2007 year-over-year comparison.

    FY 2008 - Prior Year Unobligated Sec 5309 New Starts Allocations (Revised)
    ,Fact Sheet,Information Sheet
    10-01-08

    Revised year unobligated section 530- new starts allocations.

    FY 2008 - Section 5309 New Starts Allocations
    ,Fact Sheet,Information Sheet
    10-01-08

    Fiscal year 2008 new starts allocations by state.

    FY 2009 New Starts and Small Starts Evaluation and Rating Process
    ,Fact Sheet,Information Sheet
    07-02-07

    FTA's evaluation process for small and new starts projects in deatil.

    FY 2010 Financial Management Oversight Registration Form
    ,Forms
    01-25-10

    2010 FTA FMO seminar registration form.

    FY 2010 FTA Program Updates and ARRA Phase II Presentation
    ,Presentation,Proposal Profile,Report
    11-06-09

    FTA region IV fiscal year 2010 updates and ARRA phase II presentation.

    FY 2010 Implementation Form
    ,Forms
    04-14-10

    Transit in the parks program proposal form.

    FY 2010 Program Planning Form
    ,Forms
    04-14-10

    Transit in the parks program planning form.

    FY 2010 Proposal Guidance
    ,Guidelines
    04-14-10

    FTA proposal guidance for the transit in the parks program.

    FY 2010 Proposal Guidance
    ,Guidelines
    04-14-10

    Guidance for project proposals.

    FY 2011 FMO Seminar Schedule
    ,Information Sheet
    11-19-10

    Fiscal year 2011 FMO seminar dates and locations.

    FY 2011 Master Agreement
    ,Agreements
    11-17-10

    Tribal transit master agreement.

    FY 2011 Master Agreement
    ,Agreements
    10-06-10

    Tribal transit master agreement.

    FY 2011 SPT Annual Meeting Presentations
    ,Meeting
    01-26-11

    Region IV state programs team meeting.

    FY 2011 Transit in the Parks Program Implementation Proposal Form
    ,Forms
    04-26-11

    Paul S. Sarbanes Transit in Parks Program (Transit in the Parks Program) Implementation Project - Proposal for Fiscal Year 2011 Funds

    FY05 Section 5309 Bus and Bus-Related Allocations
    ,Fact Sheet,Information Sheet
    10-01-05

    FTA revised bus allocations for fiscal year 2005.

    FY2008 Appendix A
    ,Agreements
    10-25-07

    Federal fiscal year 2008 certifications and assurances for FTA assistance programs.

    FY2011 Financial Management Oversight Agenda
    ,Meeting
    12-01-10

    FMO seminar breakdown of events.

    FY2011 FMO Registration Packet
    ,Brochure
    12-01-10

    Fiscal year 2011 FMO seminar registration documentation.

    Gallegos Capability Statement [WORD]
    ,Information Sheet
    12-20-07

    Bardwell capabilities statement.

    Gannett Fleming [PDF]
    ,Information Sheet
    12-14-07

    Gannett flemming capabilities.

    Genco Systems [PDF]
    ,Information Sheet
    02-29-08

    GENCO systems repsonse to FTA project management oversight solicitation.

    Geographical Assignments
    ,Fact Sheet,Information Sheet
    05-09-11

    Geographic assignment changes for 2011.

    Global Solutions [PDF]
    ,Information Sheet
    02-29-08

    Global solutions capabilities statement.

    Grant Recipients
    ,Information Sheet
    08-05-03

    Grant recipient list for TRO-9 recipients.

    GreatLakes
    ,Fact Sheet,Information Sheet
    07-26-06

    Cumulative Flexible Fund Transfers For all FTA Programs (FY 1992-2002)

    Guidelines and Standards for Assessing Local Financial Commitment
    ,Guidelines
    06-29-07

    Guidelines and standards for assessing local financial commitment.

    Guidelines and Standards for Assessing Transit-Supportive Land Use
    ,Guidelines
    05-24-04

    FTA transit guidelines for assisted living land use.

    HALCROW INC CAPABILITY STATEMENT [PDF]
    ,Information Sheet
    05-29-08

    Halcrow inc FTA capabilities statement.

    HATCH MOTT MACDONALD CAPABILITY [PDF]
    ,Fact Sheet,Information Sheet
    05-01-08

    HMM project management oversight services experience and description.

    Heavy Rail (PPT)
    ,Meeting,Presentation
    05-04-04

    HEAVY RAIL TRANSIT CAPITAL COST STUDY

    Heavy Rail (Word)
    ,Meeting,Presentation
    05-04-04

    HEAVY RAIL TRANSIT CAPITAL COST STUDY

    How to Prepare a Research Publication 2008
    ,Guidelines,Report
    05-13-08

    Documentation detailing the way in which to prepare a research report for the FTA.

    How to Succeed in Statewide and MPO Transportation Planning
    ,Information Sheet
    06-08-06

    MPO transportation planning process breakdown.

    How to Succeed in Statewide and MPO Transportation Planning [DOC]
    ,Information Sheet
    11-28-07

    MPO transportation planning process breakdown.

    HSH [PDF]
    ,Information Sheet
    02-04-08

    HSH capabilities statement.

    Hudson-Bergen Light Rail (PPT)
    ,Meeting,Presentation
    05-04-04

    Construction Update: Hudson-Bergen Light Rail

    ICOR Partners [PDF]
    ,Information Sheet
    12-20-07

    ICOR Partners LLC capabilities statement.

    Impact of Flexible Funds on Major FTA Programs
    ,Fact Sheet,Information Sheet
    10-01-03

    Table detailing the impact flexible fundning has on major FTA programs.

    Implementation Plan Road Map
    ,Road Map
    02-12-07

    Proposed initiative roadmap.

    Implementing Title VI Requirements in Metropolitan and Statewide Planning
    ,Information Sheet
    10-07-99

    FTA report on implementing title vi requirements in metropolitan and statewide planning.

    Innovative Financing: Meeting the Needs for Capital
    ,Presentation
    05-19-08

    Presentation describing various innovations for meeting the funding needs of a project.

    INTERACTIVE ELEMENTS [PDF]
    ,Information Sheet
    12-20-07

    Interactive elements capabilities statement.

    ITS Architecture Guidance Update
    ,Final Guidance
    07-26-05

    Details about the ITS architecture update.

    JACOBS [PDF]
    ,Fact Sheet,Information Sheet
    12-20-07

    Jacobs capabilities statement.

    January - February 2009 Transit Research Update
    ,News Update
    03-03-09

    January - February 2009 transit research update for all FTA research projects.

    January - February 2010 Transit Research and Industry News Update
    ,News Update
    03-03-10

    January - February 2010 transit research and industry news update for the FTA.

    January 2008 Transit Research Update
    ,News Update
    02-11-08

    FTA research update for all FTA projects.

    Job Access/Reverse Commute Programs - By State and by Program
    ,Information Sheet
    02-24-04

    JARC commute recipients and amounts by state and category.

    Job Access/Reverse Commute Programs - By UZA and by Program
    ,Information Sheet
    02-24-04

    JARc obligations by population group and UZA complete breakdown.

    Job Access/Reverse Commute Programs - National Totals by Program and Population Group
    ,Information Sheet
    07-16-05

    Fiscal year 2004 JARC obligations and funding by population group.

    Job Access/Reverse Commute Programs - Vehicle Purchase by State and by Type
    ,Information Sheet
    02-24-05

    Fiscal year 2004 JARC vehicular obliations by state.

    Joint Development
    ,Meeting,Presentation
    10-22-07

    FTA joint Development Presentation.

    Joint Development [DOC]
    ,Information Sheet
    11-28-07

    Joint development presentation.

    July 2007 - Transit Research Update
    ,News Update
    08-01-07

    2007 Transit research update by region.

    July 2008 Transit Research Update
    ,News Update
    08-14-08

    2008 FTA research update.

    June 2008 Transit Research Update
    ,News Update
    07-16-08

    2008 transit research update.

    June 4 Meeting in Toronto
    ,Information Sheet
    06-04-07

    Transit reseearch agenda roundtable discussion.

    Kal Krishnan Consulting Services [PDF]
    ,Information Sheet
    12-13-07

    Kal Krishan Consulting services capabilities within  the FTA.

    KJM Capability Statement [WORD]
    ,Information Sheet
    03-21-08

    KJM capabilities statement.

    KY Medicaid Brokering FTA Atlanta
    ,Meeting,Presentation
    09-13-07

    Kentucky human service transportation presentation.

    LEA [PDF]
    ,Information Sheet
    12-20-07

    Statement of Capabilities for Project Management Oversight Services

    Legislative Text
    ,Fact Sheet,Legislation
    11-08-05

    Legislative text for new freedom program in SAFETEA-LU.

    Lessons for the U.S. Transit Industry
    ,Meeting,Presentation
    03-19-07

    Power Point Presentation on Transportation in South America

    Letter from Dick Doyle
    ,Policy Letter
    05-16-08

    Dear  colleague letter and invitation to the FTA region 1 symposium on increasing ridership.

    Limited English Proficiency Executive Order
    ,Executive Order
    02-08-05

    Exceutive order asking for improved access to services for persons with limited english proficiency.

    Litigating in the Dark FTA Roundtable (PPT)
    ,Meeting,Presentation
    05-04-04

    Presentation on the WMATA 14th street tunnel case.

    Litigating in the Dark FTA Roundtable (Word)
    ,Meeting,Presentation
    05-04-04

    Presentation on the WMATA 14th stree tunnel case.

    LMI [PDF]
    ,Information Sheet
    02-04-08

    LMI capabilities statement.

    Local Approaches: Birmingham MPO Presentation
    ,Meeting,Presentation
    03-23-07 presented by Darrell Howard
    Log of Changes
    ,Checklist
    03-30-06

    Documentation of changes made to the ALI tree.

    March 2008 Transit Research Update
    ,News Update
    03-11-08

    2008 transit research update.

    March 2009 Transit Research Update
    ,News Update
    04-02-09

    2009 transit research update.

    March 2010 Transit Research and Industry News Update
    ,Information Sheet
    04-07-10

    2010 transit research update.

    Marketing
    ,Meeting,Presentation
    02-15-07

    Marketting presentation condensed slides.

    Mass Mailings List [XLS]
    ,Fact Sheet,Information Sheet
    10-10-08

    Region II mass mailings publications.

    May 2008 Transit Research Update
    ,News Update
    05-01-08

    2008 transit research update

    May 23 Meeting in Reno
    ,Information Sheet
    05-23-07

    Developing a cooperative research agenda roundtable discussion.

    May 6 Meeting in Nashville
    ,Information Sheet
    05-06-07

    A roundtable discussion of transit safety and operational issues.

    MCKISS [PDF]
    ,Information Sheet
    12-20-07

    McKissack Group capabilities statement.

    Memorandum of Understanding
    ,Agreements
    06-03-04

    Environmental coordination and review among the federal partnerts of the FTFRNYC environmental review comitee.

    Memorandum of Understanding (MOU) [PDF]
    ,Agreements
    08-06-03

    Memorandum of understanding among the FTA, FHWA, WSDOT, and ST.

    Memorandum of Understanding LMRO
    ,Fact Sheet
    06-03-04

    Memorandum of understanding environmental coordination and review among the FTRNYCEPRC.

    MILLIGAN CAPABILITY [PDF]
    ,Information Sheet
    12-20-07

    Milligan and company capabilities statement.

    Minimizing Delays in Grant Application Submission and Helpful Tips in Grant Management
    ,Meeting,Presentation
    10-22-07

    Presentation on minimizing delays in grant application submisson.

    Minimizing Delays in Grant Application Submission and Helpful Tips in Grant Management [DOC]
    ,Information Sheet
    11-28-07

    Presentation on minimizing delays in grant application submission.

    Mississippi Statewide Coordinated Plan Approach
    ,Meeting,Presentation
    03-23-07

    Presentation about the Mississippi approach to coordinated planning.

    MR [PDF]
    ,Information Sheet
    01-03-08

    MR capabilities statement.

    Multi-Year Research Program Plan Development
    ,Meeting,Presentation
    11-28-07

    Breakdown the MYPP what it is and what it does.

    National Environmental Policy Act (NEPA) Scoping [PDF]
    ,Final Guidance
    08-06-03

    Clarification of requirements for NEPA scoping and a public involvement process.

    National Fuel Cell Bus Program Solicitation
    ,Guidelines
    04-11-06

    FTA solicitation guidelines.

    NC Coordinated Planning -NCDOT
    ,Meeting,Presentation
    10-18-07

    Presentation format bullets for the NCDOT coordinated transportation initiative.

    Nearshore Habitat Assessment Data Report: Appendix F
    ,Information Sheet
    07-01-05

    Nearshore habitat assessment data report for Pacific International Engineering.

    New Employee Orientation Form
    ,Guidelines,Information Sheet,Instructions
    07-12-06

    This form is used to determine your acceptability for Federal and Federal contract employment

    New Freedom Program: SAFETEA-LU Fact Sheet
    ,Fact Sheet
    10-07-05

    FTA authorization fact sheet for the new freedom program.

    New FTA Ridership Award Program
    ,Award or Honor,Information Sheet
    10-16-06

    New FTA redership award program.

    New Grantee Checklist
    ,Checklist
    07-20-07

    Region IV new grantee checklist.

    New Grantee Checklist
    ,Checklist
    11-27-07

    FTA region IV new grantee checklist.

    New Grantee Handbook
    ,User Guide
    04-25-11

    FTA new grantee handbook.

    New Grantee Handbook: 05 - Attachment A - General Title VI Requirements for all FTA Recipients
    ,Accessibility,Guidelines,User Guide
    02-05-09

    Description of required documentation under Title VI.

    New Grantee Handbook: 06 - Attachment B - Title VI and Title VI-Dependent Guidelines for FTA Recipients
    ,Guidelines,Information Sheet
    05-13-07 FTA Circular 4702.1A
    New Grantee Package: 01 - Cover Letter [DOC]
    ,Forms,Information Sheet
    03-01-07

    Cover

    New Grantee Package: 02 - Introduction [DOC]
    ,Fact Sheet,Information Sheet
    03-01-07

    Introduction

    New Grantee Package: 03 - Table of Contents [DOC]
    ,Checklist
    03-01-07

    Table of Contents

    New Grantee Package: 04 - New Tribal Grantee Letter [DOC]
    ,Award or Honor,Information Sheet,Policy Letter
    03-01-07

    Steps needed to finalize FTA grant reception.

    New Grantee Package: 05 - Attachment A - Sample Tribal Council Resolution [DOC]
    ,Information Sheet
    03-01-07

    Resolution Draft

    New Grantee Package: 06- Attachment B - FY 2007 Certifications and Assurances [DOC]
    ,Agreements,Forms
    03-01-07

    Federal fiscal years 2006 and 2007 certifications and assurances for FTA.

    New Grantee Package: 07 - Attachment C - Fiscal Year 2007 Tribal Transit Program Master Agreement [DOC]
    ,Agreements
    03-01-07

    Oulines grant agreements authorized by 49 U.S.C. § 5311(c)(1).

    New Grantee Package: 08 - Attachment D - Dear Collegue Letter for DUNS Number [DOC]
    ,Policy Letter
    03-01-07 Dun & Bradstreet Data Unviersal Numbering System (DUNS)
    New Grantee Package: 09 - Attachment E - Request for Addition to TEAM Electronic Grant-making System Vendor File [XLS]
    ,Forms
    03-01-07

    Request for addition to vendor file award in TEAM, FTA's electronic grant-making system. 

    New Grantee Package: 10 - Attachment F - TEAM User Access Request Forms and Instructions [PDF]
    ,Forms,Instructions
    03-01-07

    Transportation Electronic Award Management System (TEAM) Grantee/ Recipient User Access Request.

    New Grantee Package: 11 - Attachment G - Electronic Clearinghouse Operation (ECHO) Web Registration Letter [DOC]
    ,Forms,Instructions,Policy Letter
    03-01-07

    Announcement of the ECHO system and registration deadlines.

    New Grantee Package: 12 - Attachment H - Instruction for Electronic Clearinghouse Operation (ECHO) User Set-up Forms (Financial) [DOC]
    ,Forms
    03-01-07

    Detailed ECHO user setup and request intstructions.

    New Grantee Package: 13 - Attachment I - Electronic Clearinghouse Operaion (ECHO) Web User Authorization and Certification Forms [DOC]
    ,Forms
    03-01-07

    Authorization for users in ECHO to recieve and manipulate information.

    New Grantee Package: 14 - Attachment J - Electonic Clearinghouse Operation (ECHO) Web User Request Form [XLS]
    ,Forms
    03-01-07

    Information collection for grantee ECHO setup.

    New Grantee Package: 15 - Attachment K - Electronic Clearinghouse Operation (ECHO) Web Rules of Conduct Form [PDF]
    ,Forms
    03-01-07

    ECHO web rules of conduct agreement.

    New Grantee Package: 16 - Attachment L - Electronic Clearinghouse Operation (ECHO) User Manual [PDF]
    ,User Guide
    03-01-07

    ECHO grantee users manual and forms list.

    New Grantee Package: 17 - Attachment M - Payment Information Form and Instructions
    Forms
    04-30-08 Financial payment information.
    New Grantee Package: 18 - Attachment N - Documented Categorical Exclusion (DCE) Worksheet [DOC]
    ,Forms,Information Sheet
    03-01-07 Environmental Information worksheet used to assist in determining the environmental classification for a proposed project.
    New Grantee Package: 19 - Attachment O - Endangered Species Act (ESA) Screening Checklist [DOC]
    ,Checklist
    03-01-07 Environmental documentation needed for construction projects.
    New Grantee Package: 20 - Attachment P - Procurement Requirements and Sources of Information [DOC]
    ,Checklist,Guidelines
    03-01-07

    Links to procurment requirements.

    New Jersey - 22nd Transit Construction Roundtable Highlights
    ,Meeting
    04-18-06

    Meeting minutes for the twenty-second transit construction roundtable.

    New Starts - Small Starts
    ,Presentation
    10-22-07

    New starts and small starts presentation.

    New Starts - Small Starts [DOC]
    ,Information Sheet
    11-28-07

    New starts and small starts presentation.

    New Starts in Final Design, Preliminary Engineering and Project Development 2010
    ,Flowchart
    07-15-10

    Summary of fiscal year 2011 new starts ratings.

    New Starts Program Assessment Appendix B: Assessment of Analogous Project Delivery Processes
    ,Meeting,Presentation
    12-28-04

    Assessment of the effectiveness of the new starts program.

    New Starts Templates - Excel
    ,Forms
    07-01-09

    Excel templates for new starts projects.

    New Starts Templates Certification of Technical Assumptions and Land Use Information - Word
    ,Forms,Guidelines
    07-09-08

    Certification that the new starts grantee understands the planning assumptions.

    New Starts: Contractor Performance Assessment Report - August 2006
    ,Policy Letter
    08-23-06

    FTA's report adress contractor performance.

    NJT - Diesel Multiple Unit (PPT)
    ,Meeting,Presentation
    05-01-04

    Presentation on diesel/Electric moltiple units.

    NJT - Diesel Multiple Unit (Word)
    ,Meeting,Presentation
    05-01-04

    Presentation on diesel/electric multiple units.

    Noise Methodology and Criteria [PDF]
    ,Final Guidance
    08-06-03

    Noise analysis guidance by the EAT

    November - December 2007 Transit Research Update
    ,News Update
    01-16-08

    Complete update for 2007 of all FTA research projects.

    November 2008 Transit Research Update
    ,News Update
    11-13-08

    FTA 2008 transit research update.

    November 2009 Transit Research and Industry News Update
    ,News Update
    12-07-09

    FTA 2009 transit research update.

    NTI Fellows Application
    ,Information Sheet,Workshop
    01-01-94

    NTI Fellows program.

    October 2007 - Transit Research Update
    ,News Update
    11-21-07

    FTA 2007 transit research update.

    October 2008 Transit Research Update
    ,News Update
    11-03-08

    FTA 2008 transit research update.

    October 2009 Transit Research and Industry News Update
    ,News Update
    11-10-09

    FTA 2009 transit research update.

    Opportunity to Showcase Transit Tecnologies in India
    ,Information Sheet
    08-20-07

    India showcase of transit opportunities and technologies.

    Overview
    ,Meeting,Presentation
    02-15-07

    An Overview of Bus Rapid Transit (BRT) in the United States and Lessons Learned from South America

    Overview of Proposed EJ Circular
    Overview of Proposed Title VI Circular
    Overview: FTA Research Programs
    ,Meeting,Presentation
    04-17-07

    Presentation breaking down the FTA research programs in each step.

    Parsons [PDF]
    ,Information Sheet
    12-19-07

    Messer Bardwell and Harper capabilities statement.

    PBSJ [PDF]
    ,Information Sheet
    12-20-07

    PBSJ capabilities statement.

    PDF File
    ,Fact Sheet,Guidelines,Information Sheet
    03-30-06

    FTA scope and activity line item codes list.

    Pedestrian and Transit-Friendly Design: A Primer for Smart Growth
    ,Presentation,Report
    08-05-99

    Pedestrian friendly transit design manual prepared for Florida DOT, and published by American Planning Association.

    Phenix Data Solutions [PDF]
    ,Information Sheet
    12-19-07

    FTA pheonix data solutions capabilities statement.

    PM Preview [PDF]
    ,Information Sheet
    12-01-07

    PM preview capabilities statement.

    PMA Services [PDF]
    ,Information Sheet
    12-19-07

    PMA consultants FTA capabilities.

    PRAIRIE [PDF]
    ,Information Sheet
    12-20-07

    Prairie quest consulting capabilities statement.

    Preamble to the Certs
    ,Agreements
    11-09-05

    Annual assurances and certifications list.

    Preliminary Engineering (PE) Checklist [Word]
    ,Checklist
    10-22-09

    New starts project planning and development checklist.

    Presentation #1 (PDF)
    ,Presentation
    06-15-06

    Travel forecasting for new starts presentation.

    Presentation #2 (PDF)
    ,Presentation
    06-15-06

    Part 2 f the presentation on new stats projects.

    PRICEWATERHOUSECOOPERS CAPABILITY [PDF]
    ,Information Sheet
    12-20-07

    PwC statement of oversight capabilities.

    Pricing guide for FTA Grantees
    ,Guidelines
    05-19-03

    A tool in helping the Grantees obtain more for their contracting dollar.

    Prior Year Unobligated Section 5309 Bus and Bus-Related Allocations Table 9A
    ,Fact Sheet,Information Sheet
    10-01-06

    Prior year unobligated section 5309 bus and bus-related allocations.

    Procurement Oversight Review and You [DOC]
    ,Information Sheet
    11-28-07

    Outline of how the procurment oversight reviews work for the transit agency.

    Profiles of 511 Traveler Information Services Update 2007 [DOC]
    ,Meeting
    08-22-07

    Description of updates to the 511 information system in 2007.

    Profiles of 511 Traveler Information Services
    ,Information Sheet
    05-31-06

    Report of the similarities and uniqueness of the various 511 systems in the country.

    Profiles of 511 Traveler Information Services (2009)
    ,Guidelines,Report
    06-23-09

    511 infomration update for 2009 coverage and cost.

    Program Fact Sheet
    ,Fact Sheet,Information Sheet
    10-07-05

    FTA authorization fact sheet.

    Program Planning Professionals [PDF]
    ,Information Sheet
    12-18-07

    Pcubed capabilities statement.

    Program Rollout: Questions & Answers - June 28, 2007
    ,Fact Sheet,Presentation
    05-15-07

    Section 5310 and JARC program rollout Q and A.

    Program Rollout: Questions & Answers - June 28, 2007
    ,Fact Sheet,Information Sheet
    06-27-07

    JARC and new frieedom project Q and A

    Project Aide [PDF]
    ,Information Sheet
    12-14-07

    Project aide capabilities statement.

    Project Time and Cost [PDF]
    ,Information Sheet
    12-19-07

    Project time and cost capablities statement for FTA.

    Public Hearing Requirements [PDF]
    ,Final Guidance,Guidelines
    02-07-02

    FTA sound tranist public hearing requirements.

    Purpose of Visits
    ,Meeting,Presentation
    03-20-07

    South America BRT Technical Tour February 2007

    QUANDEL CONSULTANTS CAPABILITY [PDF]
    ,Information Sheet
    05-05-08

    Quandel capabilities statement for FTA.

    Quarterly Reports Template
    ,Forms
    10-01-07

    Quarterly progress report.

    Questions and Answers from the FY 2010 GM Call
    ,Information Sheet
    11-12-09

    Q and A session with FTA general managers.

    RAUL V BRAVO AND ASSOCIATES CAPABILITY STATEMENT [PDF]
    ,Information Sheet
    06-02-08

    FTA capabilities statement.

    Region 3 Strategic Plan [PDF]
    ,Fact Sheet,Information Sheet
    08-03-03

    FTA region 3 specific strategic plan.

    Region IV FY 2009 Bulletin
    ,Information Sheet
    11-10-09

    FTA region IV fiscal year 2010 bulletin.

    Region IV FY 2011 Bulletin
    ,Information Sheet
    10-28-10

    Fiscal year 2011 region IV bullentin.

    Region IV State Program Meeting - Day 1
    ,Meeting,Presentation
    09-13-07

    FTA state programs meeting presentation.

    Region IV State Program Meeting - Day 2
    ,Meeting,Presentation
    09-14-07

    FTA region IV state programs meeting.

    Region IV State Programs Team Meeting - April 15-16 - Atlanta, GA
    ,Meeting
    04-15-09

    State programs team meeting agenda.

    Region IV State Programs Team Meeting Agenda - Atlanta, GA - April 2009
    ,Meeting,Presentation
    04-15-09

    FTA state programs meeting final agenda.

    Regional Advisory 2007-02
    ,Fact Sheet,Information Sheet
    10-16-06

    Dear colleague advisory letter.

    Regional Advisory No. 2008-01
    ,Information Sheet,Policy Letter
    10-17-07

    Dear colleague advisory letter.

    Regional Advisory No. 2008-02
    ,Information Sheet,Policy Letter
    10-17-07

    Dear colleague advisory letter.

    Regional Advisory No. 2008-05
    ,Information Sheet,Policy Letter,Region 1
    01-28-08

    Dear colleague advisory letter.

    Regional Advisory No. 2008-06
    ,Information Sheet,Policy Letter,Region 1
    04-22-08

    Dear colleague advisory letter.

    Regional Advisory No.. 2008-04
    ,Policy Letter
    12-12-07

    Dear colleague advisory letter.

    Regional FMO Checklist
    ,Checklist
    04-30-04

    Financial package checklist to ensure FMO completion.

    Reporting Instructions for the Section 5309 New Starts Criteria
    ,Instructions
    07-01-08

    Section 5308 New starts reporting criteria.

    Required Supplemental PDF
    ,Forms
    01-04-11

    Applicant & Proposal Profile

    Required Supplemental PDF
    ,Forms
    09-28-11

    Applicant and Proposal Profile (Bus and Bus Facilities Program)

    Required Supplemental PDF
    ,Forms
    09-28-11

    Applicant and Proposal Profile (Bus and Bus Facilities Program)

    Required Supplemental PDF
    ,Forms
    03-03-11

    Applicant and Proposal Profile (Public Transportation on Indian Reservations Program)

    Required Supplemental PDF
    ,Forms
    09-28-11

    Applicant and Proposal Profile for TIGGER applicants

    Required Supplemental PDF
    ,Forms
    09-28-11

    Applicant and Proposal Profile (Over The Road Bus Accessibility Program)

    Required Supplemental PDF
    ,Forms
    01-04-11

    Applicant & Proposal Profile

    Required Supplemental PDF
    ,Forms
    09-28-11

    Applicant and Proposal Profile (alternative analysis program).

    Research Quality
    ,Meeting,Presentation
    04-04-07

    Deatils and guidlines on how to produce quality research.

    Revised FY 2000 Section 5309 Bus Allocations
    ,Bus and Paratransit Systems,Fact Sheet
    12-13-99

    Fiscal year 200 bus allocations.

    Revision 10 and Release Notes - May 07
    ,Information Sheet
    05-07-07

    Title VI revision Notes.

    Ridership Awards Application Form (2009)
    ,Forms
    11-05-08

    FTA 2009 ridership awards application form.

    Ridership Symposium
    ,Fact Sheet
    05-28-08

    Planning, Marketing and OperatingThe Three Legs of the Ridership Stool

    SAFETEA-LU Authorization Fact Sheet: Metropolitan & Statewide Planning Programs [PDF]
    ,Fact Sheet,Reauthorization
    09-01-05

    FTA authorization fact sheet.

    SAFETEA-LU Guidelines & Coordinated Planning Guidance
    ,Meeting,Presentation
    03-23-07

    Coordinated planning and united we ride workshop presentation.

    SAFETEA-LU Implementation: SAFETEA-LU Fact Sheet
    ,Fact Sheet
    10-07-05

    New starts capital investment grants fact sheet.

    SAFETEA-LU Implementation: SAFETEA-LU Fact Sheet for Indian Reservations
    ,Fact Sheet,Information Sheet
    10-08-05

    FTA authorization fact sheet public tranist on indian reservations.

    Safety and Security Presentation
    ,Presentation
    09-13-07

    FTA Safety and Security Programs

    Sample Agreements: FY 2011 Master Agreement
    ,Agreements
    10-08-10

    Sample FTA master agreement.

    Sample Making the Case: New York 2nd Ave Subway
    ,Information Sheet
    08-20-04

    Making the case 2nd avenue subway, FTA sample.

    Sample Making the Case: Pittsburgh North Shore Connector
    ,Fact Sheet,Information Sheet
    03-11-05

    Pittsburg North connector development proposal.

    Schedule of SAFETEA-LU Deliverables
    ,Checklist,Fact Sheet
    09-28-07

    SAFETEA-LU implementation schedule.

    School Bus Information
    ,Brochure,Information Sheet
    01-19-05

    An FTA brouchure about how the FTA helps fund certain school bus programs.

    SEA Capability Statement [PDF]
    ,Information Sheet
    03-17-08

    SEA capabilities statement.

    Section 106 Historic Preservation Compliance [PDF]
    ,Final Guidance,Information Sheet
    08-06-03

    Historic preservation compliance paper.

    Section 4(f) & 6(f) Compliance [PDF]
    ,Final Guidance
    08-06-03

    Sound transit issue paper.

    Section 5310 Program Performance
    ,Information Sheet
    10-07-10

    Transportation for the Elderly and Persons with Disabilities  (Section 5310 Program) Annual Data Collection & Analysis FY: 2008 – 2009

    Seismic Design [PDF]
    ,Final Guidance
    11-01-01

    Seismic analysis under NEPA.

    Self-Assessment Form
    ,Forms
    11-18-05

    Internal control self assessment form for FTA grantees.

    September 2007 - Transit Research Update
    ,News Update
    10-01-07

    2007 FTA transit research update.

    September 2008 Transit Research Update
    ,News Update
    09-30-08

    September transit research update.

    September 2008 Transit Research Update
    ,News Update
    10-08-08

    2008 FTA transit research update.

    Session 5a (pdf)
    ,Meeting,Presentation
    10-09-07

    FTA travel forecasting for new starts presentation.

    Session 5b (pdf)
    ,Meeting,Presentation
    10-09-07

    Pathbuilder Calibration with Data on Ridership Patterns

    Sessions 10-16 (PowerPoint)
    ,Meeting,Presentation
    09-01-07

    FTA presentation for session 10-16.

    Sessions 1-4 (pdf)
    ,Meeting,Presentation
    09-19-07

    Travel Forecasting for New Starts

    Sessions 6-9 (PowerPoint)
    ,Meeting,Presentation
    09-04-07

    FTA Requirements for New Starts Reporting

    Shaw Environmental and Infrastructure [PDF]
    ,Information Sheet
    12-19-07

    Shaw capabilities statement.

    Side by Side of Reporting Requirements for the Evaluation of New Starts, Small Starts, Very Small Starts, and Exempt Projects
    ,Fact Sheet
    06-19-07

    Required information for new and small starts evaluation and rating.

    Small Starts Impact -- January 2006
    ,Policy Letter
    08-23-06

    Small starts impact asessment.

    Small Urban & Rural Transit Center
    ,Meeting,Presentation
    08-17-04

    Plan to develope a center to adress the transit needs of people in urban and rural locations.

    Southern Iowa Transit v Ottumwa Transit Authority May 24, 2000 (PDF)
    ,Fact Sheet,Information Sheet
    05-24-00

    FTA complaint filing resolution.

    Southern Iowa Transit v Ottumwa Transit Authority May 24, 2000 (Word)
    ,Fact Sheet,Information Sheet
    05-24-04

    FTA complaint resolution statement.

    Stantec Consulting Services [PDF]
    ,Information Sheet
    02-29-08

    Santec description of company and capabilities within the FTA.

    State Programs Team - ARRA Phase II Bulletin - September 30, 2009
    ,Fact Sheet,Information Sheet
    09-30-09

    Team ARRA phase II bulletin.

    State Programs Team Bulletin - July 2008
    ,Fact Sheet,Information Sheet
    07-11-08

    State programs team bulletin for 2008.

    State Programs Team Meeting Agenda, Charlotte, NC
    ,Fact Sheet,Information Sheet,Instructions
    04-08-08

    FTA state programs meeting agenda and venue.

    State Programs Team Quarterly Call Summary - December 2008
    ,Fact Sheet,Meeting
    12-11-08

    FTA region IV December 2008 updates.

    State Transit Program Manager's Guide: Administration & Oversight of FTA Grant Programs
    ,User Guide
    06-03-08

    Adminitration and oversight of FTA grant programs guide.

    Statement of Work/Request for Proposal
    ,Information Sheet
    06-07-05

    Description of FTA functional areas.

    Statewide Coordinated Plan: Alabama Regional Councils
    ,Meeting,Presentation
    03-23-07

    Human services coordinated transit plan.

    Statewide Program Meeting Agenda
    ,Meeting
    09-13-07

    FTA state programs team meeting final agenda.

    STV CAPABILITY [PDF]
    ,Information Sheet
    01-02-08

    STV solicitation letter.

    Successes in Enhancing Transit Ridership Awards
    ,Fact Sheet,Information Sheet
    04-24-08

    FTA criteria for the transit ridership awards.

    Table 1 - 2007 Appropriations for Grant Programs (Excel)
    ,Information Sheet
    07-29-07

    Fiscal year 2007 grant program appropriations and apportionments.

    Table 10 - 2007 FGM Apportionments (Excel)
    ,Information Sheet
    07-01-07

    Section 5309 fixed guideway modernizaiont apportionments.

    Table 11 - FGM Formula (Excel)
    ,Information Sheet
    10-01-07

    The fixed guideway modernization funding formula created by the FTA.

    Table 12 - 2007 Bus and Bus Facility Allocations (Excel)
    ,Information Sheet
    10-01-07

    Section 5309 bus and bus facility allocations.

    Table 13 - Prior Year Bus and Bus Facility Allocations (Excel)
    ,Information Sheet
    02-02-07

    Unobligated funds of prior years breakdown.

    Table 14 - 2007 New Starts Allocations (Excel)
    ,Information Sheet
    10-01-07

    Section 5309 new starts project allocations.

    Table 15 - New Starts Carryover FY2007 (Excel)
    ,Information Sheet
    10-01-07

    Unobligated section 5309 new starts allocations.

    Table 16 - 2007 Elderly and Disabled (Excel)
    ,Information Sheet
    10-01-07

    Section 5310 special needs for eldler and disabled individuals apportionments.

    Table 17 - 2007 Nonurban and RTAP (Excel)
    ,Information Sheet
    10-01-07

    Section 5311 and section 5340 apportionments.

    Table 18 - 2007 National Research Program Allocations (Excel)
    ,Information Sheet
    10-01-07

    National research programs allocaitons.

    Table 19 - 2007 JARC Apportionments (Excel)
    ,Information Sheet
    10-01-07

    Section 5316 JARC program apportionments.

    Table 2 - 2007 Metropolitan and State Planning Apportionment (Excel)
    ,Information Sheet
    10-01-07

    Section 5303 metropolitan transit planning program and section 5304 statewide transit planning apportionments.

    Table 20 - Prior Year Unobligated JARC Allocations (Excel)
    ,Information Sheet
    10-01-07

    Prior year unobligated JARC allocations.

    Table 21 - 2007 New Freedom (Excel)
    ,Information Sheet
    10-01-07

    Section 5317 new freedom apportionments.

    Table 22 - 2007 Alternative Analysis Allocations (Excel)
    ,Information Sheet
    10-01-07

    Section 5339 alternatives analysis allocations.

    Table 23 - Alternative Analysis Carryover 2007 (Excel)
    ,Information Sheet
    10-01-07

    Prior year unobligated section 5339 allocations.

    Table 3 - Sec 5307 UAF and 5340 Apportionments (Excel)
    ,Information Sheet
    10-01-07

    Section 5307 and5340 urbanized area apportionments.

    Table 4 - sec 5307 Apportioment Formula (Excel)
    ,Information Sheet
    10-01-07

    Section 5307 apportionment formula.

    Table 5 - Formula Grant Program Apportionment Data Unit Values (Excel)
    ,Information Sheet
    10-01-07

    FISCAL YEAR 2007 FORMULA PROGRAMS APPORTIONMENT DATA UNIT VALUES

    Table 6 - Small Transit Intensive Cities (Excel)
    ,Information Sheet
    02-06-07

    FY 2007 small transit intensive cities performance data and apportionments.

    Table 7 - Large UZAs Eligible for Operating Assistance (Excel)
    ,Information Sheet
    10-01-07

    Large UZAs eligible for section 5307 funds for assisstance.

    Table 8 - 2007 Clean Fuels Allocations (Excel)
    ,Information Sheet
    10-01-07

    Fiscal year 2007 section 5308 clean fuels program allocations.

    Table 9 - Clean Fuels Carryover 2007 (Excel)
    ,Information Sheet
    10-01-07

    2006 unobligated section 5308 clean fuels allocations.

    TEAM
    ,Presentation,Training
    04-16-07

    FTA team GUI presentation.

    TEAM Access instructions 05-09-08
    ,Forms
    05-21-07

    TEAM grant reciepient UAR.

    TEAM Access User Form [DOC]
    ,Forms
    08-06-03

    Request for new user for FTA team system.

    TEAM User Guide 03-11-08
    ,User Guide
    03-11-08

    TEAM User Guide

    Technical Breakout Session
    ,Information Sheet
    06-03-08

    Technical breakout session agenda and times.

    The ALLEN GROUP CAPABILITY STATEMENT [PDF]
    ,Information Sheet
    05-11-08

    The allen group capabilities statement.

    The Americans with Disabilities Act
    ,Meeting,Presentation
    07-16-04

    The Americans with Disabilities Act: Lessons Learned from FTA Compliance Reviews

    The Americans with Disabilities Act [DOC]
    ,Information Sheet
    11-28-07

    ADA overview and DOT effects.

    THE BURNS GROUP CAPABILITY [PDF]
    ,Information Sheet
    04-23-08

    Burns group capabilities statement.

    The History of Envision Utah
    ,Presentation,Report
    12-03-01

    The role that transit-oriented development is playing in shaping the community and affecting economic growth.

    The MCCRAY Group [PDF]
    ,Information Sheet
    02-29-08

    The Mccray group inc. capabilities statement.

    TIGGER Collector Quick Reference Guide for Applicants
    ,Guidelines
    07-09-10

    TIGGER collector reference guide for applicants.

    Title VI of the Civil RIghts Act of 1964 [DOC]
    ,Information Sheet
    11-28-07

    Title VI compliance guidance.

    Title VI of the Civil Rights Acts of 1964
    ,Meeting,Presentation
    03-09-06

    Title VI compliance guidance.

    TOD Lessons Learned
    ,Information Sheet
    10-07-10 – Results of FTA’s Listening Sessions With Developers, Bankers, and Transit Agencies on Transit Oriented Development.
    TRACS Advisory Committee Charter [PDF]
    ,Information Sheet
    11-24-09

    Charter creating the tranist rail advisory comittee for safety

    Transit Facility Checklist
    ,Checklist
    03-30-09 The Transit Facility Checklist is a guide to help grantees understand the many requirements of using Federal funds for developing a transit facility.
    Transit in Parks Program Manual
    ,User Guide
    01-09-07

    Alternative transportation in parks and public lands presentation.

    Transit Safety and Security Courses
    ,Information Sheet
    04-22-08

    List of security and safety courses and applicable positions.

    Transit Signal Priority: A Planning and Implementation Handbook
    ,User Guide,Workbook
    10-20-05 A guide book for traffic engineers and transit planners about Transit Signal Priority (TSP) implementation.
    Translating Your Cost Estimate Into the SCC Format
    ,Guidelines,Instructions
    11-07-05

    Excel Spreadsheet: Translating Your Cost Estimate into the FTA SCC Format

    Transmilenio
    ,Meeting,Presentation
    03-15-07

    TransMilenio: Transportation project in Colombia.

    Transportation Economic Land Use System (TELUS) for Transit
    ,Information Sheet
    09-11-08

    TELUS for transit condensed report. 

    Travel Forecasting for New Starts: Workshop Agenda (Excel)
    ,Information Sheet
    09-19-07

    Travel forecasting workshop for new starts projects agenda.

    TRC CAPABILITY STATEMENT [PDF]
    ,Information Sheet
    12-20-07

    TRC capabilities statement.

    TRI-20 Overview (Powerpoint)
    ,Meeting,Presentation
    05-15-08

    FTA research programs presentation.

    TRI-30 Overview (Powerpoint)
    ,Meeting,Presentation
    12-09-98

    Description of the Office of Research Management and its purpose.

    Tribal Historic Preservation Office - Suquamish Indian Tribe of the Port Madison Reservation
    ,Fact Sheet,Information Sheet
    11-09-07

    Naotional park service approves the suquamish tribe to assume SHPO functions.

    Tribal Transit Program Master Agreement
    ,Agreements
    06-21-06

    FTA tribal transit program master agreement.

    Tribal Transit Program Notice of Funding Availability: Solicitation of Grant Proposals for FY 2011 Tribal Transit Program Federal Register notice
    ,Information Sheet
    07-25-11

    Federal Register

    Tribal Transit Program Procedures - August 2006 Federal Register Notice
    ,Information Sheet
    08-15-06

    Federal Register.

    Tribal Transit Workshop Registration Form
    ,Forms
    12-06-10

    2010 tribal transit workshop registration form.

    TSM/TDM [PDF]
    ,Guidelines
    10-04-01

    Environmental justice implementation in minority and low income populations.

    U.S. Transportation Secretary Ray LaHood Announces New Transit Rail Advisory Committee for Safety
    ,News Update,Rail Transit Vehicles and Systems,Safety
    06-23-10

    Panel is charged with laying the groundwork for drafting national safety measures for rail transit.

    United We Ride Technical Assistance Tools
    ,Presentation
    03-23-07

    FTA technical assistance workshop for the UWR program.

    URBAN ENGINEERS CAPABILITY [PDF]
    ,Information Sheet
    12-20-07

    Urban engineers capabilities statement.

    Urbanized Area Notes From Breakout
    ,Information Sheet
    02-28-07

    Urbanized area strategies for JARC initiation.

    USDOT Brownfields Strategy Action Plan
    ,Fact Sheet,Information Sheet
    05-18-99

    DOT brownfields strategy action plan.

    Valerie J. Southern Transportation Consultant [PDF]
    ,Information Sheet
    12-17-07

    Valerie J. Southern - transportation consultant, LLC abreviated capability statement.

    Valley Transit Inc v Chicago Transit Authority Jan 14 1981 (PDF)
    ,Information Sheet
    03-05-05

    Details about the case between valley transit and the CTA.

    Valley Transit Inc v Chicago Transit Authority Jan 14 1981 (Word)
    ,Information Sheet
    10-12-08

    Details about the case between valley transit and the CTA.

    Value Engineering [PDF]
    ,Final Guidance
    01-09-01

    FTA value engineering report.

    Vehicle Assist and Automation (VAA) RFP [PDF]
    ,Information Sheet
    11-26-07

    VAA pilot program to weigh benefits and applications.

    WALLACE [PDF]
    ,Information Sheet
    01-09-07

    Wallace capabilities statement.

    Washington State Ferries Wireless Connection Final Report
    ,Information Sheet
    08-29-05

    Report on delivering high speed internet to the WSF tranist system.

    Web application
    ,Forms
    10-01-07

    FTA successess in enhancing ridership award application.

    Webinar Presentation 1-16-07 (PDF)
    ,Presentation
    01-16-07

    Alternative transportation in parks and public lands presentation.

    WONG1 [WORD]
    ,Information Sheet
    12-06-07

    FTA PMO solicitation by PGH wong engineering.

    WSF, Appendix A
    ,Information Sheet
    08-15-05

    WSF test performance apendix.

    WSF, Appendix B-1
    ,Information Sheet
    10-04-05

    Seattle/Bainbridge screen shot appendix.

    WSF, Appendix B-2
    ,Information Sheet
    10-04-05

    Washington State Ferries Evaluation Results, Wireless Connection Project

    WSF, Appendix C
    ,Information Sheet
    08-15-05

    Kingston/Edmondss screen shots appendix.

    WSF, Appendix F
    ,Information Sheet
    08-18-05

    WSF synopsis appendix.

    A A A    Bookmark and Share