Bonneville Power Administration

http://www.bpa.gov

Link to BPA Home Page
Link to BPA Home PageBPA - RiverBPA - Power LinesBPA - Home Lights

It started as a trickle of water slowly pushing dirt and twigs across fresh mud. Then, drawn inexorably by the rising tide, the trickle becomes a stream and the stream a torrent. Within a few short minutes, some 33.5 acres at Otter Point in the Lewis and Clark National Historic Park were reconnected to the Columbia River estuary and its tidal flows for the first time in more than a century.

You need to replace hydroelectric turbines weighing several tons and costing millions of dollars. How do you get the old ones out and the new ones in safely? Cranes. Lots of cranes.

President Franklin D. Roosevelt returned Saturday to the site of his historic speech at the height of the Great Depression to recite the very speech he gave 75 years ago dedicating the Bonneville Dam on the mighty Columbia River, the most powerful river in North America.


Documents produced from project, program and policy reviews of BPA functions.

Learn more about the multi-year effort to study the post-2024 issues around the treaty between the United States and Canada.

Be informed and up to date during an emergency.


Customer Portal   Sign in to the Customer Portal

BPA Customer access to bills, meter data, load/resource forecasts and contracts.



BPA invites your involvement on public processes, programs and projects.


Need help finding something? Send us a message, or give us a call at 800-622-4519.
NOTICE: This site is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel. BPA Privacy Policy