Fish Funding FY 2002-2006
Capital Cost Spreadsheets
(Chronological order)
Capital Cost Spreadsheets
(Chronological order)
May 1, revised:
- Expanded transportation (low option)
- Expanded transportation
- In-river migration (low option)
- In-river migration (high option & CWA)
- John Day drawdown to natural river
- John Day drawdown to spillway crest
- Lower Snake and John Day drawdown to natural river
- Lower Snake drawdown to natural river and John Day to spillway crest
- Two dam Lower Snake drawdown to natural river
- Four dam Lower Snake drawdown to natural river
- Transportation plus
- Four dam Lower Snake and John Day drawdown (high option & CWA)
- Transportation plus (CWA)
Original:
- Expanded transportation (low option)
- Expanded transportation
- In-river migration (low option)
- In-river migration (high option & CWA)
- John Day drawdown to natural river
- John Day drawdown to spillway crest
- Lower Snake and John Day drawdown to natural river
- Lower Snake drawdown to natural river and John Day to spillway crest
- Two dam Lower Snake drawdown to natural river
- Four dam Lower Snake drawdown to natural river
- Transportation plus
- Four dam Lower Snake and John Day drawdown (high option & CWA)
- Transportation plus (CWA)
Archive of content originally posted or last updated on: May 7, 1998.
Content originally provided by: Audrey Perino, BPA Power Business Line.
Content currently provided by: PBL Federal Hydro Projects - PGF.
Page maintained by: BPA Web Team.