BPA Power Services
 
http://www.bpa.gov/power/
 
Link to BPA Home Page Skip Primary Navigation
Power Services Home Page

Firstgov
 
Dry Year Tools

November 9, 2006 - Final Dry Year Guide: The Final Dry Year Guide (PDF, 5 pages, 44 kb) and Figure 1 - Dry Year Strategy (PDF, 1 page, 24 kb) have now been issued. This guide is intended to guide BPA through future critical periods marked by abnormal conditions such as drought, volatile market prices, and/or significant reductions in the availability of power to BPA.

May 30, 2006 - Dry Year Guide: In August 2002, following the events of the energy crisis of 2000 and 2001, BPA issued a Draft Guide to Tools and Principles for a Dry Year Strategy (Guide) (PDF, 21 pages, 167 kb) and Appendices (PDF, 55 pages, 210 kb). This draft was released for public comments with a closing date of October 30, 2002.

   

Archive of content originally posted or last updated on:  September 17, 2002.
Content originally provided by:  Eric King and Mary Johannis.
Content currently provided by:  Kieran Connolly, 503-230-4680, kpconnolly@bpa.gov and Rob Diffely, 503-230-4213, rjdiffely@bpa.gov.
Page maintained by:  BPA Web Team.
Skip to start of content.  Access Key = C
Skip to short cut links below
Skip to start of content.  Access Key = C If you believe information on this site is missing or in error, please Submit that comment here.
NOTICE: This server is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel.