TABLE OF CONTENTS

Publication Number: EP 870-1-32
Title: Bridging the Imjin: Construction of Libby and Teal Bridges During the Korean War (October 1952 - July 1953)
Proponent: CEHO
Publication Date: 01 Aug 89
Distribution Restriction Statement: Approved for public release; distribution is unlimited.
File Format: Adobe Acrobat.pdf. Adobe Acrobat Reader software is required to read pdf files. Click Viewers to access free Adobe Acrobat Reader software and follow installation instructions or go directly to the Adobe homepage at http://www.adobe.com.
Entire document (This file contains all elements of the document inclusive of appendices. File size: 16.2 MB.)
Foreword
Editor's Preface
Table of Contents
Introduction (File size: 4.26 MB.)
Preface
Chapter 1 - Background
Chapter 2 - The Construction of Teal Bridge (File size: 3.59 MB.)
Chapter 3 - Construction of X-Ray (Libby) Bridge (File size: 5.11 MB.)
Appendix A - Correspondence Between I Corps and Eighth Army Leading to the Approval of the Construction of Teal Bridge
Appendix B - Engineering Report on Bridge Study and Design
Appendix C - Excerpt from Libby Hi-Level Highway Bridge
Appendix D - Log of Libby Bridge (File size: 1.63 MB.)
Notes
Photo Sources
Suggestions for Further Reading
Map Symbols
Index
Back Cover