Spotlight
Home
>
NRC Library
>
Document Collections
>
Commission Documents
>
Staff Requirements Memoranda (SRM)
> 2012
Staff Requirements Memoranda (SRM) for 2012
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Document number | Description | Date |
---|---|---|
SECY-12-0097 | Entergy Operations, Inc.’s Request to Relocate the River Bend Station Backup Emergency Operations Facility | 08/20/2012 |
SECY-12-0091 | Completeness and Quality of Integrated Safety Analyses | 10/09/2012 |
SECY-12-0076 | Plan for Retrospective Analysis of Existing Rules | 08/15/2012 |
SECY-12-0069 | Process for Addressing Late-Breaking Issues During a Combined License Application Review | 06/25/2012 |
SECY-12-0066 | Criminal Penalties for the Unauthorized Introduction of Weapons into Facilities Designated by the U.S. Nuclear Regulatory Commission and for Sabotage of Nuclear Facilities or Fuel | 06/18/2012 |
SECY-12-0062 | Renewal of Full-Power Operating License for Pilgrim Nuclear Power Station | 05/25/2012 |
SECY-12-0060 | Proposed Changes to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Associated with Buried Piping | 06/13/2012 |
SECY-12-0053 | Recommendations on Regulatory Changes for Permanent Implant Brachytherapy Programs | 08/13/2012 |
SECY-12-0046 | Options for Revising the Regulatory Approach to Ground Water Protection | 05/24/2012 |
SECY-12-0042 | Colorado Alternative Standards; Implementation of the Alternative Standards Provision in Section 274o of the Atomic Energy Act of 1954, As Amended | 05/18/2012 |
SECY-12-0032 | Report to Congress on Abnormal Occurrences: Fiscal Year 2011 | 04/11/2012 |
SECY-12-0030 | Final Rule: Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria (RIN 3150-AI77) | 05/11/2012 |
SECY-12-0027 | Preemption Authority Pursuant to Section 161A, "Use of Firearms by Security Personnel," of the Atomic Energy Act of 1954, as Amended | 05/03/2012 |
SECY-12-0026 | Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Referred Ruling in LBP-11-32 (Nov. 18, 2011); San Luis Obispo Mothers for Peace’s Petition for Partial Interlocutory Review of LBP-11-32 (Dec. 5, 2011) | 06/07/2012 |
SECY-12-0025 | Proposed Orders and Requests for Information in Response to Lessons Learned from Japan's March 11, 2011, Great Tohoku Earthquake and Tsunami | 03/09/2012 |
SECY-12-0019 | Denial of Petition for Rulemaking Requesting Amendments to 10 CFR Part 54 Regarding License Renewal Applications Submitted 20 Years Before Expiration of the Operating License (PRM-54-6) | 04/16/2012 |
SECY-12-0011 | Data Collection Regarding Patient Release | 04/09/2012 |
SECY-12-0010 | Engagement of Stakeholders Regarding the Events in Japan | 03/21/2012 |
SECY-12-0009 | Final Rule: 10 CFR 73.37, "Physical Protection of Irradiated Fuel in Transit" (RIN 3150-AI64) | 06/07/2012 |
SECY-12-0008 | Implementation Plan for the Safety Culture Policy Statement | 03/01/2012 |
SECY-12-0004 | Final Rule—10 CFR Parts 2, 12, 51, 54, and 61 "Amendments to Adjudicatory Process Rules and Related Requirements" (RIN 3150-AI43) | 06/29/2012 |
SECY-12-0003 | Draft Final Policy Statement on Volume Reduction and Low-Level Radioactive Waste Management | 03/20/2012 |
Page Last Reviewed/Updated Thursday, October 11, 2012