United States Nuclear Regulatory Commission - Protecting People and the Environment

Staff Requirements Memoranda (SRM) for 2012

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Document number Description Date
SECY-12-0097 Entergy Operations, Inc.’s Request to Relocate the River Bend Station Backup Emergency Operations Facility 08/20/2012
SECY-12-0091 Completeness and Quality of Integrated Safety Analyses 10/09/2012
SECY-12-0076 Plan for Retrospective Analysis of Existing Rules 08/15/2012
SECY-12-0069 Process for Addressing Late-Breaking Issues During a Combined License Application Review 06/25/2012
SECY-12-0066 Criminal Penalties for the Unauthorized Introduction of Weapons into Facilities Designated by the U.S. Nuclear Regulatory Commission and for Sabotage of Nuclear Facilities or Fuel 06/18/2012
SECY-12-0062 Renewal of Full-Power Operating License for Pilgrim Nuclear Power Station 05/25/2012
SECY-12-0060 Proposed Changes to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Associated with Buried Piping 06/13/2012
SECY-12-0053 Recommendations on Regulatory Changes for Permanent Implant Brachytherapy Programs 08/13/2012
SECY-12-0046 Options for Revising the Regulatory Approach to Ground Water Protection 05/24/2012
SECY-12-0042 Colorado Alternative Standards; Implementation of the Alternative Standards Provision in Section 274o of the Atomic Energy Act of 1954, As Amended 05/18/2012
SECY-12-0032 Report to Congress on Abnormal Occurrences: Fiscal Year 2011 04/11/2012
SECY-12-0030 Final Rule:  Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria (RIN 3150-AI77) 05/11/2012
SECY-12-0027 Preemption Authority Pursuant to Section 161A, "Use of Firearms by Security Personnel," of the Atomic Energy Act of 1954, as Amended 05/03/2012
SECY-12-0026 Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Referred Ruling in LBP-11-32 (Nov. 18, 2011); San Luis Obispo Mothers for Peace’s Petition for Partial Interlocutory Review of LBP-11-32 (Dec. 5, 2011) 06/07/2012
SECY-12-0025 Proposed Orders and Requests for Information in Response to Lessons Learned from Japan's March 11, 2011, Great Tohoku Earthquake and Tsunami 03/09/2012
SECY-12-0019 Denial of Petition for Rulemaking Requesting Amendments to 10 CFR Part 54 Regarding License Renewal Applications Submitted 20 Years Before Expiration of the Operating License (PRM-54-6) 04/16/2012
SECY-12-0011 Data Collection Regarding Patient Release 04/09/2012
SECY-12-0010 Engagement of Stakeholders Regarding the Events in Japan 03/21/2012
SECY-12-0009 Final Rule: 10 CFR 73.37, "Physical Protection of Irradiated Fuel in Transit" (RIN 3150-AI64) 06/07/2012
SECY-12-0008 Implementation Plan for the Safety Culture Policy Statement 03/01/2012
SECY-12-0004 Final Rule—10 CFR Parts 2, 12, 51, 54, and 61 "Amendments to Adjudicatory Process Rules and Related Requirements" (RIN 3150-AI43) 06/29/2012
SECY-12-0003 Draft Final Policy Statement on Volume Reduction and Low-Level Radioactive Waste Management 03/20/2012
Page Last Reviewed/Updated Thursday, October 11, 2012