REGULATORY CHALLENGES FOR FUTURE NUCLEAR POWER PLANTS |
|
TOPIC
| SPEAKER
| TIME
|
1. |
Introduction |
Tom Kress
George Apostolakis
|
9:00- 9:15 am |
2. |
Keynote Address |
Commissioner Diaz |
9:15- 10:00 am |
|
BREAK |
10:00- 10:15 am |
3. |
DOE Presentations |
|
|
|
- Overview and Introduction to
Generation IV Initiative
|
W. Magwood (DOE)
|
10:15- 10:40 am |
|
- Generation IV Goals and Roadmap
Effort
|
R. Versluis (DOE)
|
10:40- 11:00 am |
|
- Near-Term Deployment Efforts
|
T. Miller (DOE)
|
11:00- 11:25 am |
|
|
R. Versluis (DOE)
|
11:25- 11:40 am |
|
- Next Steps Generation III +/IV
|
S. Johnson (DOE) |
11:40- 12.00 pm |
|
LUNCH |
12:00- 1:00 pm |
4. |
Generation IV Design Concepts |
|
|
|
- Pebble Bed Modular Reactor
|
W. Sproat
(Exelon)
|
1:00- 1:45 pm |
|
- International Reactor Innovative
and Secure
|
M. Carelli
(Westinghouse)
|
1:45- 2:30 pm |
|
- General Atomic- Gas Turbine
Modular Helium Reactor
|
L. Parme
(General Atomics) |
2:30- 3:15 pm |
|
BREAK |
3:15- 3:30 pm |
|
- General Electric Advanced Liquid
MetalReactor and ESBWR designs
|
A. Rao
(General Electric)
|
3:30- 4:15 pm |
5. |
NRC Presentations |
|
|
|
- NRR Response to 2/13/2001 SRM
on Evaluation of NRC Licensing
Infrastructure
|
M. Gamberoni
T. Kenyon
E. Benner
A. Rae
A. Cubbage
|
4:15- 5:15 pm |
|
|
J. Flack
S. Rubin
|
5:15- 6:00 pm |
6. |
Panel Discussion on Industry and NRC
Licensing Infrastructure Needed for
Generation IV Reactors |
Panelists:
J. Flack, NRC
S. Johnson, DOE
W. Sproat, Exelon
M. Carelli, Westinghouse
L, Parme, General Atomics
A. Rao, General Electric
|
6:00- 7:00 pm |
7. |
Closing Remarks and Recess |
T. Kress, ACRS
G. Apostolakis, ACRS |
7:00 pm |
SECOND DAY, June 5 -- 8:30 A.M. to 6:45 P.M.
REGULATORY CHALLENGES FOR FUTURE NUCLEAR POWER PLANTS |
|
TOPIC |
PRESENTER |
TIME |
1. |
Introduction |
T. Kress, ACRS
G. Apostolakis, ACRS
|
8:30- 8:45 am |
2. |
NEI Advanced Reactors Initiatives |
R. Simard, NEI
|
8:45- 9:30 am |
3. |
Technical Presentations |
|
|
|
- Safety Goals for Future Nuclear
Power Plants
|
N. Todreas, MIT |
9:30- 10:30 am |
|
BREAK |
10:30- 10:45 am |
|
|
A. Kadak, MIT
|
10:45- 11:45 am |
|
- NERI Project on Risk-Informed
Regulation
|
G. Davis, Westinghouse
M. Golay, MIT
|
1:45- 12:45 pm |
|
LUNCH |
12:45- 2:00 pm |
Note: The afternoon Subcommittee will reconvene at 2:00 p.m. in the NRC Commission Conference Room, One White Flint North, 11155 Rockville Pike,
Rockville MD. |
|
|
C. Forsberg, ORNL
|
2:00- 3:00 pm |
|
- Regulatory Framework for Future
Nuclear Power Plants
|
A. Heymer, NEI |
3:00- 4:00 pm |
|
BREAK |
4:00 - 4:15 pm |
4. |
ACRS and Panel Discussion with
Audience Participation |
|
4:15- 6:30 pm |
|
- The Most Important Regulatory
Challenges for the Licensing of
Future Nuclear Power Plants
|
Panelists:
N. Todreas, MIT
R. Barrett, NRR
E. Lyman, NCI
R. Simard, NEI
W. Hauter, Public Citizen
|
|
5. |
Conclusions |
T. Kress, ACRS
G. Apostolakis, ACRS |
6:30- 6:45 pm |