EA-04-214 - Perry 1 - (FirstEnergy Nuclear Operating Company)March 29, 2005 EA-04-214
Dear Mr. Anderson: The purpose of this letter is to provide you with the final results of our significance determination of the preliminary White finding identified in Inspection Report No. 05000440/2004016(DRS). The inspection finding was assessed using the significance determination process and was preliminarily characterized as White (i.e., a finding with low to moderate increased importance to safety, which may require additional NRC inspections). This preliminary White finding concerned the failure to follow the requirements of the Perry Emergency Plan during an event which was classified at the Alert level on July 20, 2004. The finding involved a failure to conduct an emergency dose assessment within 15 minutes of your classifying the event at the Alert level as required by your Emergency Plan on July 20, 2004. This finding was preliminarily classified as White because it involved a failure to implement a risk significant planning standard. This preliminary White finding was associated with an apparent violation of 10 CFR 50.47, “Emergency Plans.” In our letter dated December 23, 2004, transmitting the inspection report, we provided FirstEnergy Nuclear Operating Company (FENOC) an opportunity to request a Regulatory Conference or provide a written response. You declined the opportunity to discuss this issue in a Regulatory Conference and instead on January 26, 2005, provided a written response to our December 23, 2004, letter. A copy of the written response you provided to the NRC has been entered in the NRC’s document system (ADAMS) and is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html, ADAMS Accession Number ML050460286. In your letter, you disagreed with the NRC’s preliminary assessment of the violation and application of the significance determination process, and provided additional information that you requested the NRC use to re-evaluate the significance of the violation. The attachment to your letter provided a timeline of events describing the Shift Manager’s (Emergency Coordinator) actions to assess both the event and the potential for escalating the emergency classification level. The attachment to your letter also provided an outline of FENOC’s position regarding performance deficiencies and the significance of those performance deficiencies. Specifically, your letter stated that you believed the events resulted in the identification of two performance issues: (1) the Emergency Action Level HA1 note was not clear; and (2) the Shift Manager failed to direct a Computer Aided Dose Assessment Program (CADAP) run within 15 minutes of classifying the event at the Alert level. Your letter also stated that neither of these performance issues resulted in a failure to implement the Emergency Action Levels or the Emergency Plan and that neither of these performance issues had an impact or a potential impact on the health and safety of the general public. As a result, you concluded that the performance deficiencies did not rise to the level of a White finding. We have reviewed the information you provided relative to the timeline of events, and your position that the Shift Manager monitored plant indications and survey results during the event in order to assess actual plant conditions and to determine if an escalation of the event was required. We determined that the Shift Manager did not direct the performance of the CADAP run within 15 minutes of the initial classification of the event at the Alert level, a fact acknowledged in your January 26, 2005, letter. You also stated that the plant staff questioned the appropriateness of the Emergency Action Level note directing the Shift Manager to have a CADAP run completed since, according to Perry Nuclear Power Plant procedure development guidance, actions are not to be contained within notes. Notwithstanding the potential conflict between the Emergency Plan Emergency Action Level note and the lower tier procedure development guidance, the Perry Emergency Plan, as a part of the station’s license, must be implemented as written and approved. With respect to your position that there was no safety significance to this event, we acknowledge that the actual safety significance of this particular event was low. However, the NRC Significance Determination Process (SDP) defines the significance of an actual event based upon the declared emergency classification level and your success in implementing the risk significant planning standards. During the time period noted above, the Shift Manager failed to implement a risk significant planning standard during an event classified at the Alert level. The failure to implement a risk significant planning standard is important to safety since the emergency classification is the trigger for ensuring that emergency response personnel and equipment are prepared to implement actions to protect the public health and safety. Such a finding is considered White in accordance with Inspection Manual Chapter (IMC) 0609, Appendix B, and has low to moderate importance to safety. After considering the information developed during the inspection and the additional information provided in your January 26, 2005, letter, the NRC has concluded that the inspection finding is appropriately characterized as White (i.e., an issue with low to moderate increased importance to safety, which may require additional NRC inspections). You have 30 calendar days from the date of this letter to appeal the staff’s determination of significance for the identified White finding. Such appeals will be considered to have merit only if they meet the criteria given in NRC Inspection Manual Chapter 0609, Attachment 2. The NRC has also determined that the failure to properly implement the standard emergency classification and action level scheme is a violation of 10 CFR 50.47(b)(4), as cited in the enclosed Notice of Violation (Notice). The circumstances surrounding the violation are described in detail in NRC Inspection Report No. 05000440/2004016(DRS). In accordance with the NRC Enforcement Policy, NUREG-1600, the Notice of Violation is considered escalated enforcement action because it is associated with a White finding. You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. Because plant performance has been determined to be in the Multiple/Repetitive Degraded Cornerstone Column, we will use the NRC Action Matrix to determine the most appropriate NRC response for this event. We will notify you of that determination by separate correspondence. In accordance with 10 CFR 2.390 of the NRC's “Rules of Practice,” a copy of this letter, its enclosure, and your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRC’s document system (ADAMS) accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction. The NRC also includes significant enforcement actions on its Web site at www.nrc.gov; select What We Do, Enforcement, then Significant Enforcement Actions.
Docket No. 50-440 Enclosures: cc w/encls: NOTICE OF VIOLATION
During an NRC inspection conducted between October 4 and November 19, 2004, at the Perry Nuclear Power Plant, a violation of NRC requirements was identified. In accordance with the “General Statement of Policy and Procedure for NRC Enforcement Actions,” NUREG-1600, the violation is listed below:
Pursuant to the provisions of 10 CFR 2.201, First Energy Nuclear Operating
Company is hereby required to submit a written statement or explanation
to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington, DC 20555, with a copy to the Regional Administrator, Region
III, and a copy to the NRC Resident Inspector at the facility that is
the subject of this Notice, within 30 days of the date of the letter
transmitting this Notice of Violation (Notice). This reply should be
clearly marked as a “Reply to a Notice of Violation; If you contest this enforcement action, you should also provide a copy of your response, with the basis for your denial, to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Because your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRC’s document system (ADAMS) accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html, to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the public without redaction. If personal privacy or proprietary information is necessary to provide an acceptable response, then please provide a bracketed copy of your response that identifies the information that should be protected and a redacted copy of your response that deletes such information. If you request withholding of such material, you must specifically identify the portions of your response that you seek to have withheld and provide in detail the bases for your claim of withholding (e.g., explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2.390(b) to support a request for withholding confidential commercial or financial information). If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. In accordance with 10 CFR 19.11, you may be required to post this Notice within 2 working days. Dated this 29th day of March 2005
|