Escalated Enforcement Actions Issued to Reactor Licensees - Q
Quad Cities 1 & 2 - Docket Nos. 050-00254; 050-00265
NRC Action Number(s) and Facility Name |
Action Type (Severity) & Civil Penalty (if any) |
Date Issued |
Description |
---|---|---|---|
EA-06-112 Quad Cities 1 & 2 |
NOV (White) |
06/29/2006 | On June 29, 2006, a Notice of Violation associated with a White SDP finding was issued for a finding involving the failure to establish measures to ensure that the Unit 1 electromatic relief valves (ERVs) remained suitable for operation prior to implementing an extended power uprate (EPU) in November 2002. This resulted in multiple ERVs becoming inoperable and unavailable due to being subjected to significantly higher vibration levels during Unit 1 operation at EPU power levels. |
EA-98-231 Quad Cities 1 & 2 |
NOVCP |
09/11/1998 | This action is based on one Severity Level II problem involving very significant inadequacies in ComEd's capability to shut down the Quad Cities facility and maintain the units in a safe shutdown condition following a postulated design basis fire. |
EA-97-591 Quad Cities 1 & 2 |
NOVCP (SL III) $330,000 |
03/12/1998 | Licensee used critical heat to perform code required leak testing and licensee lived with a failed inner o-ring in the RV for over one year. |
EA-97-466 Quad Cities 1 & 2 |
NOVCP (SL III) $ 55,000 |
03/03/1998 | Maintenance rule violation. |
EA-96-530 & EA-96-531 Quad Cities 1 & 2 |
NOVCP (SL III) $ 50,000 |
06/24/1997 | Failure to maintain secondary containment as safety related. |
EA-96-114 Quad Cities 1 & 2 |
NOVCP (SL III) $ 50,000 |
06/13/1996 | Corner rooms structural steel in a condition outside of FSAR caused by failure to account for modifications in the original design calculations. |