Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Beaver Valley 1 |
100 |
|
|
* |
|
Beaver Valley 2 |
100 |
|
|
* |
|
Calvert Cliffs 1 |
43 |
|
HOLDING POWER PENDING RESOLUTION OF ISSUE |
* |
|
Calvert Cliffs 2 |
100 |
|
|
* |
|
FitzPatrick |
98 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Ginna |
100 |
|
|
|
|
Hope Creek 1 |
100 |
|
|
* |
|
Indian Point 2 |
100 |
|
138 KV CROSS-TIE FEEDER OUT OF SERVICE |
|
|
Indian Point 3 |
100 |
|
138 KV CROSS-TIE FEEDER OUT OF SERVICE |
|
|
Limerick 1 |
100 |
|
|
|
|
Limerick 2 |
100 |
|
|
|
|
Millstone 2 |
0 |
08/12/2012 |
FORCED OUTAGE - TS REQUIRED SHUTDOWN DUE TO HIGH ULTIMATE HEAT SINK TEMPERATURE - SEE EN #48181 |
|
|
Millstone 3 |
100 |
|
|
|
|
Nine Mile Point 1 |
100 |
|
|
|
|
Nine Mile Point 2 |
100 |
|
|
|
|
Oyster Creek |
100 |
|
|
|
|
Peach Bottom 2 |
90 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
Peach Bottom 3 |
100 |
|
|
|
|
Pilgrim 1 |
100 |
|
|
|
|
Salem 1 |
100 |
|
|
|
|
Salem 2 |
100 |
|
|
|
|
Seabrook 1 |
85 |
|
POWER LIMITED TO 85% BASED ON GENERATOR STATOR COOLING DELTA T LIMIT |
|
|
Susquehanna 1 |
73 |
|
INCREASING POWER TO 100% |
* |
|
Susquehanna 2 |
100 |
|
|
* |
|
Three Mile Island 1 |
100 |
|
|
* |
|
Vermont Yankee |
100 |
|
|
* |
|
Region 2
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Browns Ferry 1 |
100 |
|
|
|
|
Browns Ferry 2 |
100 |
|
|
|
|
Browns Ferry 3 |
100 |
|
|
|
|
Brunswick 1 |
100 |
|
|
|
|
Brunswick 2 |
93 |
|
REDUCING POWER TO 70% FOR TESTING |
* |
|
Catawba 1 |
100 |
|
|
|
|
Catawba 2 |
100 |
|
|
|
|
Crystal River 3 |
0 |
09/25/2009 |
DEFUELED - CONTAINMENT TENSIONING ON HOLD |
|
|
Farley 1 |
100 |
|
|
|
|
Farley 2 |
100 |
|
|
|
|
Harris 1 |
100 |
|
|
|
|
Hatch 1 |
100 |
|
|
|
|
Hatch 2 |
100 |
|
|
|
|
McGuire 1 |
100 |
|
|
|
|
McGuire 2 |
100 |
|
|
|
|
North Anna 1 |
100 |
|
|
|
|
North Anna 2 |
100 |
|
|
|
|
Oconee 1 |
100 |
|
|
|
|
Oconee 2 |
100 |
|
|
|
|
Oconee 3 |
100 |
|
|
|
|
Robinson 2 |
100 |
|
|
|
|
Saint Lucie 1 |
100 |
|
|
|
|
Saint Lucie 2 |
0 |
08/05/2012 |
REFUELING OUTAGE |
|
|
Sequoyah 1 |
100 |
|
|
|
|
Sequoyah 2 |
0 |
08/16/2012 |
STARTUP PREPARATIONS IN PROGRESS - ANTICIPATE RESTART ON DAYSHIFT, 8/18 |
* |
|
Summer |
100 |
|
|
|
|
Surry 1 |
100 |
|
|
|
|
Surry 2 |
100 |
|
|
|
|
Turkey Point 3 |
2 |
|
HOLDING POWER FOR COMPLETION OF SURVEILLANCES |
* |
|
Turkey Point 4 |
100 |
|
|
|
|
Vogtle 1 |
100 |
|
|
|
|
Vogtle 2 |
100 |
|
|
|
|
Watts Bar 1 |
100 |
|
|
|
|
Region 3
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
|
|
Braidwood 2 |
100 |
|
|
|
|
Byron 1 |
100 |
|
|
* |
|
Byron 2 |
96 |
|
REDUCED POWER DUE TO DEGRADED COOLING TOWER PERFORMANCE |
* |
|
Clinton |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
D.C. Cook 1 |
100 |
|
|
* |
|
D.C. Cook 2 |
100 |
|
|
* |
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
100 |
|
|
|
|
Dresden 3 |
100 |
|
|
|
|
Duane Arnold |
95 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Fermi 2 |
68 |
|
REDUCED POWER DUE TO ONE FEED PUMP NOT AVAILABLE |
|
|
Kewaunee |
100 |
|
|
|
|
La Salle 1 |
100 |
|
|
|
|
La Salle 2 |
100 |
|
|
|
|
Monticello |
1 |
|
STARTUP - INCREASING POWER |
* |
|
Palisades |
0 |
08/11/2012 |
FORCED OUTAGE - SHUTDOWN TO INVESTIGATE PRIMARY COOLANT SYSTEM LEAKAGE - SEE EN #48182 |
|
|
Perry 1 |
100 |
|
|
|
|
Point Beach 1 |
67 |
|
HOLDING FOR EHC EQUIPMENT ISSUES |
* |
|
Point Beach 2 |
100 |
|
|
|
|
Prairie Island 1 |
0 |
08/14/2012 |
STARTUP PREPARATIONS |
|
|
Prairie Island 2 |
100 |
|
|
|
|
Quad Cities 1 |
100 |
|
|
|
|
Quad Cities 2 |
100 |
|
|
|
|
Region 4
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Arkansas Nuclear 1 |
100 |
|
|
|
|
Arkansas Nuclear 2 |
100 |
|
|
|
|
Callaway |
100 |
|
|
|
|
Columbia Generating Station |
100 |
|
|
|
|
Comanche Peak 1 |
100 |
|
|
|
|
Comanche Peak 2 |
100 |
|
|
|
|
Cooper |
100 |
|
|
|
|
Diablo Canyon 1 |
100 |
|
|
|
|
Diablo Canyon 2 |
100 |
|
|
|
|
Fort Calhoun |
0 |
04/09/2011 |
REFUELING OUTAGE |
|
|
Grand Gulf 1 |
100 |
|
|
|
|
Palo Verde 1 |
100 |
|
|
|
|
Palo Verde 2 |
100 |
|
|
|
|
Palo Verde 3 |
100 |
|
|
|
|
River Bend 1 |
100 |
|
|
|
|
San Onofre 2 |
0 |
01/09/2012 |
REFUELING OUTAGE |
|
|
San Onofre 3 |
0 |
01/31/2012 |
FORCED OUTAGE - S/G REPAIR |
|
|
South Texas 1 |
100 |
|
|
|
|
South Texas 2 |
98 |
|
|
* |
|
Waterford 3 |
100 |
|
|
|
|
Wolf Creek 1 |
89 |
|
DECREASING POWER FOR 345 KV POWER LINE WORK |
* |
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
|
Page Last Reviewed/Updated Monday, September 17, 2012