Home > Electronic Reading Room > Document Collections > Reports Associated with Events
> Power Reactor Status Reports
> 2012
> February 11
Power Reactor Status Report for February 11, 2012
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Beaver Valley 1 |
100 |
|
|
|
|
Beaver Valley 2 |
100 |
|
|
|
|
Calvert Cliffs 1 |
0 |
02/05/2012 |
REFUELING OUTAGE |
|
|
Calvert Cliffs 2 |
100 |
|
|
|
|
FitzPatrick |
100 |
|
|
|
|
Ginna |
100 |
|
|
|
|
Hope Creek 1 |
100 |
|
|
|
|
Indian Point 2 |
100 |
|
|
|
|
Indian Point 3 |
100 |
|
|
|
|
Limerick 1 |
98 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
Limerick 2 |
63 |
|
PLANT TESTING AND CONDENSER CLEANING |
* |
|
Millstone 2 |
100 |
|
|
|
|
Millstone 3 |
100 |
|
|
|
|
Nine Mile Point 1 |
100 |
|
|
|
|
Nine Mile Point 2 |
100 |
|
|
|
|
Oyster Creek |
100 |
|
|
|
|
Peach Bottom 2 |
100 |
|
|
|
|
Peach Bottom 3 |
100 |
|
|
|
|
Pilgrim 1 |
100 |
|
|
|
|
Salem 1 |
100 |
|
HIGH VOLTAGE ACTION |
* |
|
Salem 2 |
100 |
|
HIGH VOLTAGE ACTION |
* |
|
Seabrook 1 |
85 |
|
HOLDING POWER BASED ON GENERATOR STATOR COOLING DELTA T LIMIT |
|
|
Susquehanna 1 |
99 |
|
100% ELECTRICAL CAPABILITY |
|
|
Susquehanna 2 |
100 |
|
|
|
|
Three Mile Island 1 |
100 |
|
HIGH VOLTAGE ACTION |
* |
|
Vermont Yankee |
100 |
|
|
|
|
Region 2
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Browns Ferry 1 |
100 |
|
YELLOW-161 KV OFFSITE LINE |
|
|
Browns Ferry 2 |
100 |
|
YELLOW-161 KV OFFSITE LINE |
|
|
Browns Ferry 3 |
100 |
|
YELLOW-161 KV OFFSITE LINE |
|
|
Brunswick 1 |
92 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Brunswick 2 |
100 |
|
|
|
|
Catawba 1 |
100 |
|
|
|
|
Catawba 2 |
100 |
|
|
|
|
Crystal River 3 |
0 |
09/25/2009 |
DEFUELED - CONTAINMENT TENSIONING ON HOLD |
|
|
Farley 1 |
100 |
|
|
|
|
Farley 2 |
100 |
|
|
|
|
Harris 1 |
100 |
|
|
|
|
Hatch 1 |
85 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
Hatch 2 |
100 |
|
|
|
|
McGuire 1 |
100 |
|
|
|
|
McGuire 2 |
100 |
|
|
|
|
North Anna 1 |
100 |
|
|
|
|
North Anna 2 |
100 |
|
|
|
|
Oconee 1 |
100 |
|
|
|
|
Oconee 2 |
100 |
|
|
|
|
Oconee 3 |
100 |
|
|
|
|
Robinson 2 |
0 |
01/17/2012 |
DEFUELED |
|
|
Saint Lucie 1 |
0 |
11/27/2011 |
REFUELING OUTAGE |
|
|
Saint Lucie 2 |
100 |
|
|
|
|
Sequoyah 1 |
100 |
|
|
|
|
Sequoyah 2 |
100 |
|
|
|
|
Summer |
100 |
|
|
|
|
Surry 1 |
100 |
|
|
|
|
Surry 2 |
100 |
|
|
|
|
Turkey Point 3 |
97 |
|
COASTDOWN TO REFUELING |
* |
|
Turkey Point 4 |
100 |
|
|
|
|
Vogtle 1 |
100 |
|
|
|
|
Vogtle 2 |
100 |
|
|
|
|
Watts Bar 1 |
100 |
|
|
|
|
Region 3
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
|
|
Braidwood 2 |
100 |
|
|
|
|
Byron 1 |
95 |
|
OUTPUT POWER LIMITED DUE TO OFFSITE TRANSMISSION LINE PROBLEM |
* |
|
Byron 2 |
81 |
|
OUTPUT POWER LIMITED DUE TO OFFSITE TRANSMISSION LINE PROBLEM |
* |
|
Clinton |
97 |
|
100% ELECTRICAL GENERATION |
|
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
100 |
|
|
|
|
Dresden 3 |
100 |
|
|
|
|
Duane Arnold |
60 |
|
ROD SEQUENCE EXCHANGE IN PROGRESS |
* |
|
Fermi 2 |
100 |
|
|
|
|
Kewaunee |
100 |
|
|
|
|
La Salle 1 |
100 |
|
|
|
|
La Salle 2 |
100 |
|
|
|
|
Monticello |
100 |
|
|
|
|
Palisades |
100 |
|
|
|
|
Perry 1 |
100 |
|
|
|
|
Point Beach 1 |
100 |
|
|
|
|
Point Beach 2 |
100 |
|
|
|
|
Prairie Island 1 |
100 |
|
|
|
|
Prairie Island 2 |
100 |
|
|
|
|
Quad Cities 1 |
100 |
|
|
|
|
Quad Cities 2 |
100 |
|
|
|
|
Region 4
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Arkansas Nuclear 1 |
100 |
|
|
|
|
Arkansas Nuclear 2 |
100 |
|
|
|
|
Callaway |
100 |
|
|
|
|
Columbia Generating Station |
100 |
|
|
|
|
Comanche Peak 1 |
100 |
|
|
|
|
Comanche Peak 2 |
100 |
|
|
|
|
Cooper |
100 |
|
|
|
|
Diablo Canyon 1 |
100 |
|
2/7 - 230KV MORRO BAY-GATES LINE OOS FOR MAINTENANCE |
|
|
Diablo Canyon 2 |
100 |
|
2/7 - 230KV MORRO BAY- GATES LINE OOS FOR MAINTENANCE |
|
|
Fort Calhoun |
0 |
04/09/2011 |
REFUELING OUTAGE - VESSEL HEAD OFF |
|
|
Grand Gulf 1 |
96 |
|
LIMITED BASED ON SECOND STAGE MSR ISOLATED |
|
|
Palo Verde 1 |
100 |
|
|
|
|
Palo Verde 2 |
100 |
|
|
|
|
Palo Verde 3 |
100 |
|
|
|
|
River Bend 1 |
100 |
|
|
|
|
San Onofre 2 |
0 |
01/09/2012 |
DEFUELED - SWITCHYARD RESTRICTIONS DUE TO UNIT 2 DIESEL OUTAGE |
|
|
San Onofre 3 |
0 |
01/31/2012 |
FORCED OUTAGE - SWITCHYARD RESTRICTIONS DUE TO UNIT 2 DIESEL OUTAGE |
|
|
South Texas 1 |
100 |
|
|
|
|
South Texas 2 |
0 |
11/28/2011 |
MAINTENANCE OUTAGE |
|
|
Waterford 3 |
100 |
|
|
|
|
Wolf Creek 1 |
0 |
01/13/2012 |
WORK CONTINUING TO RESTORE FROM LOSS OF OFFSITE POWER |
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
|
Page Last Reviewed/Updated Friday, March 30, 2012