United States Nuclear Regulatory Commission - Protecting People and the Environment

Draft NRC Regulatory Guides - Power Reactors (Division 1)

This page lists the title of each recent Draft Regulatory Guide for Division 1, Power Reactors. Each draft guide listed is available online from this site. Comments on any regulatory guide may be submitted electronically.

See also Regulatory Guides for Division 1.

See Notes on Regulatory Guides for more information.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Task Number Title Publish Date
DG-1197

Inservice Inspection of Prestressed Concrete Containment Structures with Grouted Tendons (ML081560507)

04/2011
DG-1199 Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors (ML090960464) 10/2009
DG-1206 Configuration Management Plans for Digital Computer Software used in Safety Systems of Nuclear Power Plants (ML103200044) 08/2012
DG-1207 Software Test Documentation for Digital Computer Software Used in Safety Systems of Nuclear Power Plants (ML083370243) 08/2012
DG-1208 Software Requirement Specifications for Digital Computer Software used in Safety Systems of Nuclear Power Plants (ML103120751) 08/2012
DG-1209 Software Requirement Specifications for Digital Computer Software used in Safety Systems of Nuclear Power Plants (ML103080963) 08/2012
DG-1210 Developing Software Lifecycle Processes for Digital Computer Software Used in Safety Systems of Nuclear Power Plants (ML103120727) 08/2012
DG-1211 Materials and Inspections for Reactor Vessel Closure Studs (ML082820439) 04/2009
DG-1216 Plant-Specific Applicability of Transition Break Size Specified in 10 CFR 50.46a (ML100430356) 06/2010
DG-1220 Performance-Based Containment Leak-Test Program (ML090490183) 04/2009
DG-1245 Inspection of Water-Control Structures Associated with Nuclear Power Plants (ML093060150) 01/2011
DG-1253 Preoperational Testing of Emergency Core Cooling Systems for Pressurized Water Reactors (ML110110480) 05/2011
DG-1265 Initial Test Program of Condensate and Feedwater Systems for Light-Water Reactors (ML112020111) 03/2012
DG-1267 Verification, Validation, Reviews, and Audits for Digital Computer Software in Safety Systems of Nuclear Power Plants (ML103160431) 08/2012
DG-1268 Preoperational Testing of Instrument and Control Air Systems (ML113180379) 03/2012
DG-1270 Evaluations of Explosions Postulated to Occur at Nearby Facilities and on Transportation Routes Near Nuclear Power Plant (ML110390554) 07/2011
DG-1271 Decommissioning of Nuclear Power Reactors (ML111360054) 02/2012
DG-1274 Design, Inspection, and Testing Criteria for Air Filtration and Adsorption Units of Postaccident Engineered-Safety-Feature Atmosphere Cleanup Systems in Light-Water-Cooled Nuclear Power Plants (ML11244A045) 12/2011
DG-1277 Initial Test Program of Emergency Core Cooling Systems for Boiling-Water Reactors (ML113550182) 06/2012
DG-1280 Design, Inspection, and Testing Criteria for Air Filtration and Adsorption Units of Normal Atmosphere Cleanup Systems in Light-Water-Cooled Nuclear Power Plants (ML11273A057) 06/2012
DG-1282 Fuel Oil systems for Emergency Power Supplies (ML121090447) 06/2012
DG-1285 An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis (ML12012A006) 05/2012
DG-1286 An Approach for Plant-Specific, Risk-Informed Decision-Making: Inservice Testing (ML12017A053) 05/2012
DG-1287 An Approach for Plant-Specific, Risk-Informed Decisionmaking: Technical Specifications (ML12017A054) 05/2012
DG-1288 An Approach for Plant-Specific, Risk-Informed Decisionmaking for Inservice Inspection of Piping (ML12017A076) 05/2012
Page Last Reviewed/Updated Tuesday, August 21, 2012