Significant Changes in the Asbestos Standard for Construction 29 CFR 1926.1101 |
|||||||||||||||
This handout is designed to acquaint interested persons with significant changes
to OSHA's new Asbestos Standard for Construction, 29 CFR 1926.1101. It is not
intended to be a comprehensive review of the entire standard. Persons who wish
to learn more about the specific provisions of the standard should consult the
preamble and regulatory text of the standard as published in the Federal
Register. The issues that are discussed here are the Permissible Exposure Limit (PEL); duties of building/facility owners; duties and training of the competent person; aspects of exposure monitoring; and control measures, especially for the 4 classes of asbestos work defined by the standard. Basic definitions that are important to understanding these issues are presented. Definitions Asbestos-Containing Material (ACM) - means any material containing more than one percent asbestos. Presumed Asbestos-Containing Material (PACM) - means thermal system insulation and surfacing material found in buildings constructed no later than 1980. The designation of a material as "PACM" may be rebutted following procedures specified in the standard. Surfacing ACM - means material that is sprayed, troweled-on or otherwise applied to surfaces (such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, and other purposes) and that contains more than 1% asbestos. Thermal System Insulation (TSI) ACM - means ACM applied to pipes, fittings, boilers, breeching, tanks, ducts or other structural components to prevent heat loss or gain and that contains more than 1% asbestos. Class I Asbestos Work - means activities involving the removal of TSI and surfacing ACM and PACM. Class II Asbestos Work - means activities involving the removal of ACM which is not thermal system insulation or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastics. Class III Asbestos Work - means repair and maintenance operations, where "ACM," including TSI and surfacing ACM and PACM, may be disturbed. Class IV Asbestos Work - means maintenance and custodial construction activities during which employees contact but do not disturb ACM or PACM and activities to clean up dust, waste and debris resulting from Class I, II and III activities. NOTES:Building/Facility Owner - means the legal entity, including a lessee, which exercises control over management and recordkeeping functions relating to a building and/or facility in which activities covered by this standard take place. Permissible Exposure Limit (PEL) The time-weighted average (TWA) permissible exposure limit has been reduced to 0.1 fibers per cubic centimeter. The Excursion Limit remains at 1.0 fibers per cubic centimeter averaged over 30 minutes. Both of these values are considered PELs. There is no established action level in the new standard because the sampling and analytical method is not reliable below the time-weighted average limit of 0.1 fibers per cubic centimeter. Requirements for Building/Facility Owners Most asbestos-related construction activities involve previously installed building materials. Building owners often are the only and/or best sources of information concerning them. Therefore they are assigned specific information conveying and retention duties under the new asbestos standard. Where a building/facility owner also is an employer with employees who may be exposed to asbestos-containing materials, the duties of employers also apply. The following materials must be treated as asbestos-containing, unless specified procedures are followed to determine otherwise:
Before work is begun, building/facility owners must identify the presence, location, and quantity of ACM/PACM and notify the following persons:
NOTE: When materials labeled as containing asbestos according to the requirements of this standard are installed on non-residential roofs, the contractor must notify the building owner of the presence and location of such asbestos-containing materials. This facilitates the owner's future notification requirements.Signs and Labels Building/facility owners must post signs at the entrance to mechanical rooms/areas in which employees reasonably can be expected to enter and which contain TSI and surfacing ACM/PACM. The signs must identify the material which is present, its location, and appropriate work practices that will ensure ACM/PACM will not be disturbed. Previously installed PACM/ACM that is identified by a building owner or employer must be labeled in areas where the label will clearly be noticed. Posting of signs may be used as an alternative to labels. The wording for labels is
Labels must also contain a warning statement against breathing asbestos fibers. Records Retention Where a building/facility owner has communicated and/or received notification concerning the identification, location, and quantity of ACM/PACM, written records of such notifications and their content must be maintained by the building owner for the duration of ownership and transferred to successive owners. Where a building/facility owner has relied on data to demonstrate that PACM is not asbestos-containing, such data must be maintained for as long as they are relied upon to rebut the presumption. Competent Person The new standard requires that a competent person be designated for all worksites covered by the standard. The competent person must have the qualifications and authority required by 29 CFR 1926.20-32, the basic construction requirements. The standard specifies additional duties and training for the competent person on asbestos worksites. Duties The competent person must make frequent and regular inspections of the job site, materials, and equipment. On jobsites where Class I or II work is being performed, the competent person must perform or supervise the following duties:
For Class II and III jobs, on-site inspections must be made frequently enough to assess whether conditions have changed, as well as at any reasonable time at employee request. Training For Class I and II asbestos work, training of the competent person must include all aspects of asbestos removal and handling, including:
For Class III and IV, training of the competent person must include aspects of asbestos handling appropriate to the work, including:
Training required for Class I and II competent persons also satisfies the requirements for Class III and IV. Exposure Monitoring Initial Exposure Assessment A competent person must make an "initial exposure assessment" before or at the initiation of all covered operations to determine expected exposures. An initial exposure assessment is not the same as initial exposure monitoring. Initial employee exposure monitoring cannot adequately predict all future exposures on construction jobs. First-day exposures may reflect set-up activities and thus be lower than later exposures. In addition, results of monitoring are not instantaneously available. Therefore, the initial exposure assessment will identify jobs likely to exceed the PEL in time for employers to install and implement the extra controls required to reduce exposures. The bases for the initial exposure assessment are: 1) Employee exposure monitoring, if feasible, andFor Class I jobs, exposures are to be assumed to exceed the PELs until and unless the employer is able to make a "negative exposure assessment." If a "negative exposure assessment" has been made, the "initial exposure assessment" is not required. Negative Initial Exposure Assessment A "negative initial exposure assessment" is a demonstration by the employer that employee exposure during an operation is expected to be consistently below the PELs. The determination of a "negative exposure assessment" is job-specific. It can apply only to jobs performed by trained employees. An employer may demonstrate that exposure will be below the PELs by data conforming to the following criteria: 1) Objective data - demonstrating that the product or material containing asbestos minerals or the activity involving such product or material cannot release airborne fibers in concentrations in excess of the PELs (TWA or Excursion Limit) under those work conditions having the greatest potential for releasing asbestos (the worst case), orPeriodic Monitoring Daily monitoring is required for Class I and II operations unless the employer has made a negative exposure assessment for the entire operation. For Class I work, daily monitoring may be dispensed with only if all employees are equipped with supplied-air respirators operated in the pressure demand mode (or other positive pressure mode respirator) and only control methods listed in the standard are used. For Class II work, daily monitoring may be dispensed with if all employees are equipped with supplied-air respirators operated in the positive-pressure mode. All work operations, other than Class I and II work, where exposures are expected to exceed a PEL, must be monitored at intervals sufficient to document the validity of the exposure prediction. Methods of Compliance Some methods of compliance specified in the new standard apply to all covered asbestos jobs. Others are Class-specific. Requirements Applying to All Jobs Controls and practices that must always be used, regardless of the level of exposure, are 1) Vacuum cleaners with HEPA filters to collect asbestos-containing debris and dustControls and work practices that may never be used, regardless of the level of exposure, are 1) High-speed abrasive disc saws that are not equipped with point of cut ventilator or enclosures with HEPA filtered exhaust airFor all work covered by the standard, one or more of the following controls must be used, as necessary, to achieve compliance with the PELs:
Requirements for controls and work practices that apply to a specific Class or type of asbestos work are found in the sections of the Standard as indicated in the following table:
|
|||||||||||||||