Sequoyah Fuels Corporation Site – Environmental Review

Sequoyah Fuels Corporation Site in Gore, Oklahoma

Sequoyah Fuels

On this page:

Application Information:

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Environmental Report
Surface Reclamation Plan

Schedule for the Sequoyah Fuels Corporation Site ER Review and EIS Preparation*

Actions

Date

Surface Reclamation Plan Received

January 2003

Groundwater Corrective Action Plan Received

June 2003

Environmental Report Received

October 2006

Draft EIS/FRN Availability

September 21, 2007

DEIS Public Meeting (Gore, OK)

October 16, 2007

Draft EIS Public Comment Period Ends

November 5, 2007

Issue Final EIS to EPA

April 2008

* These schedules reflect work plans that are subject to change. Subsequent meetings and comment periods may change based on the revised schedule. This work plan will be updated on a periodic basis. Please see the NRC Public Meetings Page or contact the listed PM for the latest information on meetings and status.

Public Involvement

  1. The public is encouraged to participate in the environmental review process through public meetings, and public comment periods on rules, guidance, and other documents. Comments to the NRC on the Draft Environmental Impact Statement (DEIS) may be submitted by e-mail or regular mail as follows:

    By regular mail - postmarked by November 5, 2007
    Chief, Rules Review and Directives Branch,
    U.S. Nuclear Regulatory Commission
    Mail Stop T-6D59
    Washington, DC 20555-0001

    By email - received by midnight November 5, 2007 "Sequoyah Fuels DEIS" in the subject line

    Send to NRCREP.Resource@nrc.gov

  2. On October 16, 2007, the NRC staff conducted a public meeting for comment on the Draft Environmental Impact Statement (DEIS) for the licensee’s surface reclamation and groundwater corrective action plans. Several stakeholders were in attendance at the meeting. Links to the meeting transcript and presentation are provided below:

Draft Environmental Impact Statement (DEIS): NUREG-1888
DEIS Meeting Presentation
Public Meeting for Comment on the DEIS - Official Transcript

Project Managers for Sequoyah Fuels Corporation Site Reviews

NRC PMs for Sequoyah Fuels Corporation Site

Environmental Review

Allen Fetter

Surface Reclamation Plan Review

Myron Fliegel

Groundwater Corrective Action Plan Review

Stephen Cohen