Official Site of the U.S. Air Force   Right Corner Banner
Join the Air Force

News > New upgrades revitalize B-1B Lancers
 
Photos 
Lancers
B-1B Lancers from the 337th Test and Evaluation Squadron soar over the Gulf of Mexico during a test mission near Eglin Air Force Base, Fla., Feb. 23, 2012. The 337th Test and Evaluation Squadron is a geographically separated unit of the 53rd Wing, headquartered at Eglin AFB. The 337th TES is responsible for operational testing of all B-1 defensive/offensive systems and weapons upgrades. (Courtesy photo/Jake Melampy)
Download HiRes
 
Related Factsheets
 B-1B Lancer
New upgrades revitalize B-1B Lancers

Posted 6/2/2012 Email story   Print story

    


by Airman 1st Class Charles V. Rivezzo
7th Bomb Wing Public Affairs


6/2/2012 - DYESS AIR FORCE BASE, Texas (AFNS) -- B-1B Lancers are currently undergoing the most advanced hardware and software upgrades to date as part of the Sustainment-Block 16 program.

Sustainment-Block 16 upgrades include a fully integrated data link in the aft station and vertical situation display upgrade in the front station as well as updates to navigation, radar and diagnostic systems.

"The B-1 has never seen this many upgrades in one block," said Maj. Thomas Bryant, the 337th Test and Evaluation Squadron assistant director of operations. "These upgrades will give us an entirely new aircraft; this is a game changer."

The aft crew station will now receive five new color displays, all capable of providing moving maps and data link integration. Weapon systems officers will receive full "QWERTY" keyboards and new controllers to interface with the integrated battle station software.

Furthermore, a new MIDS LVT-1 radio, using integrated battle station capabilities, brings the B-1 into the Link-16 network, allowing the B-1 to send and receive text messages, imagery and mission assignments.

Unlike current messaging capabilities, fully integrated data link assignments will interface directly with the aircraft, allowing combat commanders the capability to send target sets directly to weapons onboard the B-1.

"The new data link capability is huge for the B-1," Bryant said. "Command and control assets will have the ability to send us targets electronically, automatically linking into our system rather than manually entering the coordinates."

While the fully integrated data link upgrades primarily support the weapon systems officers in the aft station, Sustainment-Block 16 also includes vertical situation display upgrades for the front station.

Pilots receive a new digital flight instrument display, providing more precise flight parameters. The pilot and co-pilot stations each receive a new 8-inch by 10-inch multi-function display and the same cursor control that is installed in the aft station.

These new situational displays provide independent moving maps and link information to the front station, supplying them identical information available to the aft station.

Fully integrated data link and vertical situation display upgrades have now completed developmental testing at Edwards Air Force Base, Calif., and soon three 337th TES aircraft will be modified with the new upgrades.

Developmental testing for the entire Sustainment-Block 16 package is scheduled to begin March 2013. Under the current program schedule, the 337th TES will begin operational testing September 2013.



tabComments
6/7/2012 12:28:40 PM ET
The more she flys the better she fights. Our aircrews are going to love the stuff coming down the modification pike soon.
R.Cantwell, Oklahoma
 
6/6/2012 10:16:14 AM ET
Had the honor of deploying from EL with the 37th BS during Operation Desert Fox. Will never forget watching the jet depart knowing how historic it was. Amazed at how the jet just keeps improving.
Mole, WA
 
6/4/2012 1:19:43 PM ET
The backbone of the bomber fleet. Once a real POS, this bomber has proven its worth time and time again and is by far the most combat proven of anything in the inventory today, yes to include the BUFF.
Dave C, OH
 
6/3/2012 9:26:13 PM ET
Bone.
Caveman, Bedrock
 
Add a comment

 Inside AF.mil

ima cornerSearch

tabSubscribe AF.MIL
tabMore HeadlinesRSS feed 
KC-46 enters critical design review phase

Slideshow: Fifth-generation formation  1

Air Force Week in Photos

Chaplains provide support and comfort for families

IDS agencies team up to teach life skills to new Airmen

ANG director discusses way forward

Carter: Sequestration would have effect of 'hidden tax'

CMSAF: 'Be the best, know your Airmen, tell your story'  1

Carter urges stepped up progress on cyber defense

Partnerships develop Air Force youth  1

Air Force leaders offer perspectives at four-star forum

Dempsey: Insider attacks won't affect NATO's Afghan strategy  1

'Teammates wanted' to deliver future

Personnel chief: Road ahead for Airmen tough, but bright  3

tabCommentaryRSS feed 
Sept. 17: A day for Constitutional conversation  2

Losing Your Future to Sexual Assault   24


Site Map      Contact Us     Questions     Security and Privacy notice     E-publishing