Accomplishments
Loan Programs Office
Our Projects
Current Totals
Loans: $34.5B
Jobs: ~60,000
1703 | ||
---|---|---|
AREVA | Front-end Nuclear | |
Front-end Nuclear |
Idaho Falls, ID | |
$2 billion Loan Amount | 310/1,000 Jobs (Permanent / Construction) | N/A Generation Capacity |
N/A MWh/Gallons | N/A Annual Avoided CO2(tons) | N/A Annual Cars off the Road* |
N/A Annual Households Equivalent |
1703 | ||
---|---|---|
Georgia Power Company | Nuclear Generation | |
Nuclear Generation |
Waynesboro, GA | |
$8.33 billion Loan Amount | 800/3,500 Jobs (Permanent / Construction) | 2,204 Generation Capacity |
17,956,000 MWh/Gallons | 10,317,000 Annual Avoided CO2(tons) | 1,984,000 Annual Cars off the Road* |
1,564,000 Annual Households Equivalent |
1705 | ||
---|---|---|
1366 Technologies, Inc. | Solar Manufacturing | |
Solar Manufacturing |
Lexington, MA | |
$150 million Loan Amount | 70/50 Jobs (Permanent / Construction) | N/A Generation Capacity |
647,000 MWh/Gallons | 372,000 Annual Avoided CO2(tons) | 71,000 Annual Cars off the Road* |
56,000 Annual Households Equivalent |
1705 | ||
---|---|---|
Abengoa Bioenergy Biomass of Kansas LLC | Biofuel | |
Biofuel |
Hugoton, KS | |
$132.4 million Loan Amount | 65/300 Jobs (Permanent / Construction) | N/A Generation Capacity |
N/A MWh/Gallons | 139,000 Annual Avoided CO2(tons) | 27,000 Annual Cars off the Road* |
N/A Annual Households Equivalent |
1705 | ||
---|---|---|
Abengoa Solar, Inc. (Mojave Solar) | Solar Generation | |
Solar Generation |
San Bernardino County, CA | |
$1.2 billion Loan Amount | 70/830 Jobs (Permanent / Construction) | 250 Generation Capacity |
617,000 MWh/Gallons | 355,000 Annual Avoided CO2(tons) | 68,000 Annual Cars off the Road* |
54,000 Annual Households Equivalent |
1705 | ||
---|---|---|
Abengoa Solar, Inc. (Solana) | Solar Generation | |
Solar Generation |
Gila Bend, AZ | |
$1.446 billion Loan Amount | 60/1,700 Jobs (Permanent / Construction) | 250 Generation Capacity |
944,000 MWh/Gallons | 544,000 Annual Avoided CO2(tons) | 105,000 Annual Cars off the Road* |
82,000 Annual Households Equivalent |
1705 | ||
---|---|---|
Abound Solar | Solar Manufacturing | |
Solar Manufacturing |
Longmont, CO and Tipton, IN | |
$400 million Loan Amount | N/A/400 Jobs (Permanent / Construction) | N/A Generation Capacity |
1,906,000 MWh/Gallons | 1,095,000 Annual Avoided CO2(tons) | 210,000 Annual Cars off the Road* |
166,000 Annual Households Equivalent |
1705 | ||
---|---|---|
Abound Solar | Solar Manufacturing | |
Solar Manufacturing |
Tipton, IN | |
$400 million Loan Amount | N/A/400 Jobs (Permanent / Construction) | N/A Generation Capacity |
1,906,000 MWh/Gallons | 1,095,000 Annual Avoided CO2(tons) | 210,000 Annual Cars off the Road* |
166,000 Annual Households Equivalent |
1705 | ||
---|---|---|
Beacon Power Corporation | Energy Storage | |
Energy Storage |
Stephentown, NY | |
$43 million Loan Amount | 14/20 Jobs (Permanent / Construction) | N/A Generation Capacity |
N/A MWh/Gallons | N/A Annual Avoided CO2(tons) | N/A Annual Cars off the Road* |
N/A Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Caithness Shepherds Flat | Wind Generation | |
Wind Generation |
Gilliam and Morrow Counties, OR | |
partial guarantee of $1.3 billion Loan Amount | 35/400 Jobs (Permanent / Construction) | 845 Generation Capacity |
1,797,000 MWh/Gallons | 1,032,000 Annual Avoided CO2(tons) | 199,000 Annual Cars off the Road* |
157,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Caithness Shepherds Flat | Wind Generation | |
Wind Generation |
Stamford, CT | |
partial guarantee of $1.3 billion Loan Amount | 35/400 Jobs (Permanent / Construction) | 845 Generation Capacity |
1,797,000 MWh/Gallons | 1,032,000 Annual Avoided CO2(tons) | 199,000 Annual Cars off the Road* |
157,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Caithness Shepherds Flat | Wind Generation | |
Wind Generation |
North OR | |
partial guarantee of $1.3 billion Loan Amount | 35/400 Jobs (Permanent / Construction) | 845 Generation Capacity |
1,797,000 MWh/Gallons | 1,032,000 Annual Avoided CO2(tons) | 199,000 Annual Cars off the Road* |
157,000 Annual Households Equivalent |
1705 | ||
---|---|---|
Cogentrix of Alamosa, LLC. | Solar Generation | |
Solar Generation |
Alamosa, CO | |
$90.6 million Loan Amount | 10/75 Jobs (Permanent / Construction) | 30 Generation Capacity |
75,000 MWh/Gallons | 43,000 Annual Avoided CO2(tons) | 8,000 Annual Cars off the Road* |
7,000 Annual Households Equivalent |
1705 | ||
---|---|---|
Exelon (Antelope Valley Solar Ranch) | Solar Generation | |
Solar Generation |
Lancanster, CA | |
$646 million Loan Amount | 20/350 Jobs (Permanent / Construction) | 230 Generation Capacity |
623,000 MWh/Gallons | 358,000 Annual Avoided CO2(tons) | 69,000 Annual Cars off the Road* |
54,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Granite Reliable | Wind Generation | |
Wind Generation |
Coos, NH | |
partial guarantee of $168.9 million Loan Amount | 6/198 Jobs (Permanent / Construction) | 99 Generation Capacity |
224,000 MWh/Gallons | 124,000 Annual Avoided CO2(tons) | 23,000 Annual Cars off the Road* |
19,000 Annual Households Equivalent |
1705 | ||
---|---|---|
Kahuku Wind Power, LLC. | Wind Generation | |
Wind Generation |
Kahuku Oahu, HI | |
$117 million Loan Amount | 10/200 Jobs (Permanent / Construction) | 30 Generation Capacity |
71,000 MWh/Gallons | 41,000 Annual Avoided CO2(tons) | 8,000 Annual Cars off the Road* |
6,000 Annual Households Equivalent |
1705 | ||
---|---|---|
Kahuku Wind Power, LLC. | Wind Generation | |
Wind Generation |
Oahu, HI | |
$117 million Loan Amount | 10/200 Jobs (Permanent / Construction) | 30 Generation Capacity |
71,000 MWh/Gallons | 41,000 Annual Avoided CO2(tons) | 8,000 Annual Cars off the Road* |
6,000 Annual Households Equivalent |
1705 | ||
---|---|---|
LS Power Associates (ON Line – formerly known as SWIP-S) | Transmission | |
Transmission |
Ely to Las Vegas, NV | |
$343 million Loan Amount | 15/400 Jobs (Permanent / Construction) | N/A Generation Capacity |
N/A MWh/Gallons | N/A Annual Avoided CO2(tons) | N/A Annual Cars off the Road* |
N/A Annual Households Equivalent |
1705 | ||
---|---|---|
LS Power Associates (ON Line – formerly known as SWIP-S) | Transmission | |
Transmission |
Chesterfield, MO | |
$343 million Loan Amount | 15/400 Jobs (Permanent / Construction) | N/A Generation Capacity |
N/A MWh/Gallons | N/A Annual Avoided CO2(tons) | N/A Annual Cars off the Road* |
N/A Annual Households Equivalent |
1705 | ||
---|---|---|
LS Power Associates (ON Line – formerly known as SWIP-S) | Transmission | |
Transmission |
Eastern Nevada, NV | |
$343 million Loan Amount | 15/400 Jobs (Permanent / Construction) | N/A Generation Capacity |
N/A MWh/Gallons | N/A Annual Avoided CO2(tons) | N/A Annual Cars off the Road* |
N/A Annual Households Equivalent |
1705 | ||
---|---|---|
Mesquite Solar 1, LLC (Sempra Mesquite) | Solar Generation | |
Solar Generation |
Maricopa County, AZ | |
$337 million Loan Amount | 7/300 Jobs (Permanent / Construction) | 170 Generation Capacity |
350,000 MWh/Gallons | 201,000 Annual Avoided CO2(tons) | 39,000 Annual Cars off the Road* |
30,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Nevada Geothermal Power Company, Inc. (Blue Mountain) | Geothermal | |
Geothermal |
Reno, NV | |
partial guarantee of $98.5 million Loan Amount | 14/200 Jobs (Permanent / Construction) | 36 Generation Capacity |
305,000 MWh/Gallons | 175,000 Annual Avoided CO2(tons) | 34,000 Annual Cars off the Road* |
27,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
NextEra Energy Resources, LLC (Desert Sunlight) | Solar Generation | |
Solar Generation |
Riverside County, CA | |
partial guarantee of $1.46 billion Loan Amount | 15/550 Jobs (Permanent / Construction) | 550 Generation Capacity |
1,280,000 MWh/Gallons | 735,000 Annual Avoided CO2(tons) | 141,000 Annual Cars off the Road* |
111,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
NextEra Energy Resources, LLC (Genesis Solar) | Solar Generation | |
Solar Generation |
Riverside County, CA | |
partial guarantee of $852 million Loan Amount | 47/800 Jobs (Permanent / Construction) | 250 Generation Capacity |
560,000 MWh/Gallons | 322,000 Annual Avoided CO2(tons) | 62,000 Annual Cars off the Road* |
49,000 Annual Households Equivalent |
1705 | ||
---|---|---|
NRG Energy, Inc. (BrightSource) | Solar Generation | |
Solar Generation |
Mojave, CA | |
$1.6 billion Loan Amount | 86/1,000 Jobs (Permanent / Construction) | 383 Generation Capacity |
998,000 MWh/Gallons | 574,000 Annual Avoided CO2(tons) | 110,000 Annual Cars off the Road* |
87,000 Annual Households Equivalent |
1705 | ||
---|---|---|
NRG Solar (California Valley Solar Ranch) | Solar Generation | |
Solar Generation |
San Luis Obispo, CA | |
$1.237 billion Loan Amount | 15/350 Jobs (Permanent / Construction) | 250 Generation Capacity |
739,000 MWh/Gallons | 425,043 Annual Avoided CO2(tons) | 74,153 Annual Cars off the Road* |
59,000 Annual Households Equivalent |
1705 | ||
---|---|---|
NRG Solar, LLC (Agua Caliente) | Solar Generation | |
Solar Generation |
Yuma County, AZ | |
$967 million Loan Amount | 10/400 Jobs (Permanent / Construction) | 290 Generation Capacity |
648,000 MWh/Gallons | 372,000 Annual Avoided CO2(tons) | 72,000 Annual Cars off the Road* |
56,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Ormat Nevada, Inc. | Geothermal | |
Geothermal |
Jersey Valley, McGinness Hills, and Tuscarora, NV | |
partial guarantee of $350 million Loan Amount | 64/332 Jobs (Permanent / Construction) | 121 Generation Capacity |
1,007,000 MWh/Gallons | 579,000 Annual Avoided CO2(tons) | 111,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
28 States | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
New York | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
New Jersey | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Pennsylvania | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Virginia | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
North Carolina | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
South Carolina | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Georgia | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
28 States | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Tennessee | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Kentucky | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Ohio | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Illinois | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Wisconsin | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Mississippi | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Louisiana | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Oregon | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
28 States | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Minnesota | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Texas | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Utah | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Arizona | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Nevada | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
California | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 (FIPP) | ||
---|---|---|
Prologis (Project Amp) | Solar Generation | |
Solar Generation |
Washington | |
partial guarantee of $1.4 billion Loan Amount | 42/Over 1,000 Jobs (Permanent / Construction) | 752 Generation Capacity |
1,015,000 MWh/Gallons | 583,000 Annual Avoided CO2(tons) | 112,000 Annual Cars off the Road* |
88,000 Annual Households Equivalent |
1705 | ||
---|---|---|
Record Hill Wind | Wind Generation | |
Wind Generation |
Roxbury, ME | |
$102 million Loan Amount | 8/200 Jobs (Permanent / Construction) | 50 Generation Capacity |
96,000 MWh/Gallons | 55,000 Annual Avoided CO2(tons) | 11,000 Annual Cars off the Road* |
8,000 Annual Households Equivalent |
1705 | ||
---|---|---|
SolarReserve, LLC (Crescent Dunes) | Solar Generation | |
Solar Generation |
Nye County, NV | |
$737 million Loan Amount | 45/600 Jobs (Permanent / Construction) | 110 Generation Capacity |
504,000 MWh/Gallons | 289,000 Annual Avoided CO2(tons) | 56,000 Annual Cars off the Road* |
44,000 Annual Households Equivalent |
1705 | ||
---|---|---|
SoloPower | Solar Manufacturing | |
Solar Manufacturing |
Portland, OR | |
$197 million Loan Amount | 450/270 Jobs (Permanent / Construction) | N/A Generation Capacity |
794,000 MWh/Gallons | 456,000 Annual Avoided CO2(tons) | 88,000 Annual Cars off the Road* |
69,000 Annual Households Equivalent |
1705 | ||
---|---|---|
Solyndra Inc. | Solar Manufacturing | |
Solar Manufacturing |
Fremont, CA | |
$535 million Loan Amount | N/A/3,000 Jobs (Permanent / Construction) | N/A Generation Capacity |
681,000 MWh/Gallons | 391,000 Annual Avoided CO2(tons) | 75,000 Annual Cars off the Road* |
59,000 Annual Households Equivalent |
1705 | ||
---|---|---|
US Geothermal, Inc. | Geothermal | |
Geothermal |
Malheur Cty, OR | |
$97 million Loan Amount | 10/150 Jobs (Permanent / Construction) | 23 Generation Capacity |
180,000 MWh/Gallons | 103,000 Annual Avoided CO2(tons) | 20,000 Annual Cars off the Road* |
16,000 Annual Households Equivalent |
ATVM | ||
---|---|---|
Fisker Automotive | OEM | |
OEM |
Wilmington, DE | |
$529 million Loan Amount | 2,000 Jobs (Permanent) | N/A Generation Capacity |
N/A MWh/Gallons | 154,000 Annual Avoided CO2(tons) | 30,000 Annual Cars off the Road* |
N/A Annual Households Equivalent |
ATVM | ||
---|---|---|
Fisker Automotive | OEM | |
OEM |
Irvine, CA | |
$529 million Loan Amount | 2,000 Jobs (Permanent) | N/A Generation Capacity |
N/A MWh/Gallons | 154,000 Annual Avoided CO2(tons) | 30,000 Annual Cars off the Road* |
N/A Annual Households Equivalent |
ATVM | ||
---|---|---|
Ford Motor Company | Motor Vehicle Manufacturing | |
Motor Vehicle Manufacturing |
Michigan | |
$5.907 billion Loan Amount | 33,000 Jobs (Permanent) | N/A Generation Capacity |
N/A MWh/Gallons | 2,018,000 Annual Avoided CO2(tons) | 388,000 Annual Cars off the Road* |
N/A Annual Households Equivalent |
ATVM | ||
---|---|---|
Ford Motor Company | Motor Vehicle Manufacturing | |
Motor Vehicle Manufacturing |
Illinois | |
$5.907 billion Loan Amount | 3,000 Jobs (Permanent) | N/A Generation Capacity |
N/A MWh/Gallons | 2,018,000 Annual Avoided CO2(tons) | 388,000 Annual Cars off the Road* |
N/A Annual Households Equivalent |
ATVM | ||
---|---|---|
Ford Motor Company | Motor Vehicle Manufacturing | |
Motor Vehicle Manufacturing |
Kentucky | |
$5.907 billion Loan Amount | 3,500 Jobs (Permanent) | N/A Generation Capacity |
N/A MWh/Gallons | 2,018,000 Annual Avoided CO2(tons) | 388,000 Annual Cars off the Road* |
N/A Annual Households Equivalent |
ATVM | ||
---|---|---|
Ford Motor Company | Motor Vehicle Manufacturing | |
Motor Vehicle Manufacturing |
Missouri | |
$5.907 billion Loan Amount | 4,000 Jobs (Permanent) | N/A Generation Capacity |
N/A MWh/Gallons | 2,018,000 Annual Avoided CO2(tons) | 388,000 Annual Cars off the Road* |
N/A Annual Households Equivalent |
ATVM | ||
---|---|---|
Nissan North America, Inc. | OEM | |
OEM |
Smyrna, TN | |
$1.448 billion Loan Amount | 1,300 Jobs (Permanent) | N/A Generation Capacity |
N/A MWh/Gallons | 204,000 Annual Avoided CO2(tons) | 39,000 Annual Cars off the Road* |
N/A Annual Households Equivalent |
ATVM | ||
---|---|---|
Tesla Motors | OEM | |
OEM |
Fremont, CA | |
$465 million Loan Amount | 1,500 Jobs (Permanent) | N/A Generation Capacity |
N/A MWh/Gallons | 26,000 Annual Avoided CO2(tons) | 5,000 Annual Cars off the Road* |
N/A Annual Households Equivalent |
ATVM | ||
---|---|---|
The Vehicle Production Group LLC | OEM | |
OEM |
Mishawaka, IN | |
$50 million Loan Amount | 900 Jobs (Permanent) | N/A Generation Capacity |
N/A MWh/Gallons | 9,000 Annual Avoided CO2(tons) | 2,000 Annual Cars off the Road* |
N/A Annual Households Equivalent |
ATVM | ||
---|---|---|
The Vehicle Production Group LLC | OEM | |
OEM |
Mishawaka, IN | |
$50 million Loan Amount | 900 Jobs (Permanent) | N/A Generation Capacity |
N/A MWh/Gallons | 9,000 Annual Avoided CO2(tons) | 2,000 Annual Cars off the Road* |
N/A Annual Households Equivalent |
About the Data
Annual MWh/Gallon:
Annual generation of electricity in megawatt-hours (MWh) or gallons of biofuel (project type dependent).
20-year avoided GHG:
Tons of greenhouse gases that might have otherwise been emitted from other energy sources over a 20-year period if not for implementation of the project.
Annual avoided CO2:
Annual tons of carbon dioxide that might have otherwise been emitted from other energy sources if not for implementation of the project.
Annual avoided SO2:
Annual tons of sulfur dioxide that might have otherwise been emitted from other energy sources if not for implementation of the project.
Annual avoided NOx:
Annual tons of nitrogen oxides that might have otherwise been emitted from other energy sources if not for implementation of the project.
Annual “cars off the road”:
The number of passenger vehicles with equivalent annual tons of greenhouse gases emissions that might have otherwise occurred from other energy sources if not for implementation of the project (as based on EPA MOBILE6.2 Average passenger vehicle = 5.20 metric tons CO2e).
Household equivalents:
The number of residential households with equivalent annual tons of carbon dioxide emissions that might have otherwise occurred from other energy sources if not for implementation of the project (as based on EIA figure 14,796 lbs CO2 emissions per year for an average household).
Latest News
Visit LPO News Room »Update on the 1703 Loan Program
Today Dave Frantz, LPO Acting Executive Director, sent Senators Bingaman and Murkowski a letter to update them on our loan program.
April 5, 2012