Bonneville Power Administration

http://www.bpa.gov

Link to BPA Home Page
Link to BPA Home PageBPA - RiverBPA - Power LinesBPA - Home Lights
  BPA Home Triangle Bullet Point Rate Cases Triangle Bullet Point 2008 Triangle Bullet Point Tiered Rate Methodology Rate Case

Triangle bullet point Rate Case Overview

Triangle bullet point BPA's Costs

Triangle bullet point Before a Rate Case

Triangle bullet point Rate Case Elements

Triangle bullet point Step by Step

Triangle bullet point FERC Review

Triangle bullet point Upcoming/Current Rate Cases

Triangle bullet point Inactive Rate Cases

Tiered Rate Methodology Rate Case




Background
As a result of BPA's Long-Term Regional Dialogue Policy BPA is establishing a long-term Tiered Rates Methodology to implement a tiered rate construct post 2011. The Methodology will define the processes and the rate constructs necessary to establish a tiered Priority Firm rate. This TRM will be developed in accordance Section 7(i) of the Northwest Power Act.

Resources
The links on the right go to individual elements of the rate case.
table top
Tiered Rate Methodology Rate Case
table bottom


Need help finding something? Send us a message, or give us a call at 800-622-4519.
NOTICE: This site is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel. BPA Privacy Policy