![](https://webarchive.library.unt.edu/web/20121006235042im_/http://www.exim.gov/images/spacer.gif) |
![Export Import Bank of the United States](https://webarchive.library.unt.edu/web/20121006235042im_/http://www.exim.gov/images/logo.jpg) |
|
![](https://webarchive.library.unt.edu/web/20121006235042im_/http://www.exim.gov/images/spacer.gif) |
|
![](https://webarchive.library.unt.edu/web/20121006235042im_/http://www.exim.gov/images/curve7.gif) |
![](https://webarchive.library.unt.edu/web/20121006235042im_/http://www.exim.gov/images/curve1.gif) |
![](https://webarchive.library.unt.edu/web/20121006235042im_/http://www.exim.gov/images/spacer_topContent.gif) |
![](https://webarchive.library.unt.edu/web/20121006235042im_/http://www.exim.gov/images/topContent.gif) |
![](https://webarchive.library.unt.edu/web/20121006235042im_/http://www.exim.gov/images/curve2.gif) |
![](https://webarchive.library.unt.edu/web/20121006235042im_/http://www.exim.gov/images/leftshim.gif) |
September 15, 2012 - October 14, 2012 |
Ex-Im Bank Direct Loans should apply the following minimum interest rate: |
Standard Minimum Interest Rates |
|
Minimum Interest Rates for New Nuclear Power and Large Hydro-Power Projects [1] |
Repayment Term (years) |
Interest Rate |
Repayment Term (years) |
Interest Rate |
Up to and including 5 years |
1.37 |
Up to and including 5 years |
1.37 |
Over 5 and up to and including 8.5 years |
1.71 |
Over 5 and up to and including 8.5 years |
1.71 |
Over 8.5 years |
2.14 |
Over 8.5 years |
2.14 |
11 to 12 |
2.14 |
11 to 12 |
2.14 |
13 |
2.34 |
13 |
2.52 |
14 |
2.52 |
14 |
2.70 |
15 |
2.52 |
15 |
2.70 |
16 |
2.70 |
16 |
2.93 |
17 |
2.70 |
17 |
2.98 |
18 |
2.88 |
18 |
2.98 |
NOTE: |
The 8-year and 9-year bond rates have been interpolated from the 7-year and 10-year rates. |
1 |
As per the definition of the International Commission on Large Dams (ICOLD). ICOLD defines a large dam as a dam with a height of 15 m or more from the foundation. Dams that are between 5 and 15m high and have a reservoir volume of more than 3 million m3 are also classified as large dams |
|
|
|
|
![](https://webarchive.library.unt.edu/web/20121006235042im_/http://www.exim.gov/images/spacer.gif) |
![](https://webarchive.library.unt.edu/web/20121006235042im_/http://www.exim.gov/images/curve3.gif) |
![Jobs Through Exports](https://webarchive.library.unt.edu/web/20121006235042im_/http://www.exim.gov/images/tagline.gif) |
![Bottom right curve image](https://webarchive.library.unt.edu/web/20121006235042im_/http://www.exim.gov/images/curve4.gif) |
|
|
![](https://webarchive.library.unt.edu/web/20121006235042im_/http://www.exim.gov/images/curve5.gif) |
![](https://webarchive.library.unt.edu/web/20121006235042im_/http://www.exim.gov/images/spacer.gif) |