Individual Plant Examination: Submittal Guidance (NUREG-1335)

On this page:

Download complete document

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Publication Information

Manuscript Completed: July 1989
Date Published:
August 1989

Office of Nuclear Regulatory Research
Office of Nuclear Reactor Regulation
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001

Availability Notice

Abstract

Based on a Policy Statement on Severe Accidents Regarding Future Designs and Existing Plants, the performance of a plant examination is requested from the licensee of each nuclear power plant. The plant examination looks for vulnerabilities to severe accidents and cost-effective safety improvements that reduce or eliminate the important vulnerabilities. This document delineates the guidance for reporting the results of that plant examination.