United States Nuclear Regulatory Commission - Protecting People and the Environment

Materials and Plant Protection (Division 5): Regulatory Guides 5.41 - 5.60

This page lists the number, title, publication date, and revisions for each regulatory guide in Division 5, "Materials and Plant Protection," with references to draft guides and related documents (where applicable).

See also Draft Regulatory Guides for Division 5.

See NRC Regulatory Guides for more general information.

Reviewed (last column on table) means that the NRC has reviewed these guides and has determined that they are acceptable for continued use. The NRC encourages comments from stakeholders on any Regulatory Guide at any time. Comments received in this manner will be reviewed upon receipt, but will be fully evaluated during the next periodic review of the affect guides. Currently, Regulatory Guides are reviewed on a 5 year basis. In certain cases, a Regulatory Guide will be looked at before the 5 year period has passed.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Guide
Number
Title Rev. Publish
Date
Reviewed
5.41 (Not issued) -- --  
5.42 Design Considerations for Minimizing Residual Holdup of Special Nuclear Material in Equipment for Dry Process Operations -- 01/1975  
5.43 Plant Security Force Duties -- 01/1975 09/2011
5.44 Perimeter Intrusion Alarm Systems 3 10/1997 06/2010
2 05/1980  
1 06/1976  
-- 01/1975  
5.45 Standard Form and Content for the Special Nuclear Material Control and Accounting Section of a Special Nuclear Material License Application (including That for a Uranium Enrichment Facility)
(Withdrawn -- See 63 FR 2426, 01/15/1998)
W 01/1998  
-- 12/1974  
5.46 (Not issued) -- --  
5.47 Control and Accounability of Plutonium in Waste Material
(Withdrawn -- See 50 FR 25364, 06/18/1985)
W 06/1985  
5.48 Design Considerations--Systems for Measuring the Mass of Liquids -- 02/1975  
5.49 Internal Transfers of Special Nuclear Material (for Comment) -- 03/1975  
5.50 (Not issued) -- --  
5.51 Management Review of Nuclear Material Control and Accounting Systems (for Comment) -- 06/1975  
5.52 Standard Format and Content of a Licensee Physical Protection Plan for Strategic Special Nuclear Material at Fixed Sites (Other than Nuclear Power Plants) 3 12/1994 09/2011
2 07/1980
1 06/1976
-- 05/1975
5.53 Qualification, Calibration, and Error Estimation Methods for Nondestructive Assay 1 02/1984  
-- 08/1975  
5.54 Standard Format and Content of Safeguards Contingency Plans for Nuclear Power Plants (for Comment) -- 03/1978  
5.55 Standard Format and Content of Safeguards Contingency Plans for Fuel Cycle Facilities (for Comment) -- 03/1978 09/2011
5.56 Standard Format and Content of Safeguards Contingency Plans for Transportation (for Comment) -- 03/1978 09/2011
5.57 Shipping and Receiving Control of Strategic Special Nuclear Material 1 06/1980  
-- 06/1976  
5.58 Considerations for Establishing Traceability of Special Nuclear Material Accounting Measurements 1 02/1980  
-- 11/1978  
5.59 Standard Format and Content for a Licensee Physical Security Plan for the Protection of Special Nuclear Material of Moderate or Low Strategic Significance 1 02/1983 09/2011
-- 01/1980
5.60 Standard Format and Content of a Licensee Physical Protection Plan for Strategic Special Nuclear Material in Transit -- 04/1980 09/2011

To top of page

Page Last Reviewed/Updated Monday, September 24, 2012