United States Nuclear Regulatory Commission - Protecting People and the Environment
Home > NRC Library > Document Collections > Regulatory Guides > Power Reactors > Regulatory Guides 1.61 - 1.80

Power Reactors (Division 1): Regulatory Guides 1.61 - 1.80

This page lists the number, title, publication date, and revisions for each regulatory guide in Division 1, "Power Reactors," with references to draft guides and related documents (where applicable).

See also Draft Regulatory Guides for Division 1.

See NRC Regulatory Guides for more general information.

Reviewed (last column on table) means that the NRC has reviewed these guides and has determined that they are acceptable for continued use. The NRC encourages comments from stakeholders on any Regulatory Guide at any time. Comments received in this manner will be reviewed upon receipt, but will be fully evaluated during the next periodic review of the affect guides. Currently, Regulatory Guides are reviewed on a 5 year basis. In certain cases, a Regulatory Guide will be looked at before the 5 year period has passed.

Guide
Number
Title Rev. Publish
Date
Reviewed
1.61 Damping Values for Seismic Design of Nuclear Power Plants 1 03/2007  
-- 10/1973
1.62 Manual Initiation of Protective Actions

1

06/2010  
-- 10/1973
1.63 Electric Penetration Assemblies in Containment Structures for Nuclear Power Plants 3 02/1987 11/2011
2 07/1978
1 05/1977
-- 10/1973
1.64 Quality Assurance Requirements for the Design of Nuclear Power plants
(Withdrawn -- See 56 FR 36175, 07/31/1991)
W 07/1991  
1.65 Materials and Inspections for Reactor Vessel Closure Studs 1 04/2010  
-- 10/1973
1.66 Nondestructive Examination of Tubular Products
(Withdrawn -- See 42 FR 54478, 10/6/1977)
W 10/1977  
1.67 Installation of Overpressure Protection Devices
(Withdrawn -- See 48 FR 19101, 04/27/1983)
W 04/1983  
1.68 Initial Test Programs for Water-Cooled Nuclear Power Plants 3 03/2007  
2 08/1978
1 01/1977
-- 11/1973
1.68.1 Preoperational and Initial Startup Testing of Feedwater and Condensate Systems for Boiling Water Reactor Power Plants 2 09/2012  
1 01/1977
-- 12/1975
1.68.2 Initial Startup Test Program To Demonstrate Remote Shutdown Capability for Water-Cooled Nuclear Power Plants 2 04/2010   
1 07/1978
-- 01/1977
1.68.3 Preoperational Testing of Instrument and Control Air Systems 1 09/2012  
-- 04/1982
1.69

Concrete Radiation Shields and Generic Shield Testing for Nuclear Power Plants

Concrete Radiation Shields for Nuclear Power Plants

1 05/2009  
-- 12/1973
1.70 Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants (LWR Edition) 3 11/1978 04/2009
2 09/1975
1 10/1972
-- 02/1972
1.71 Welder Qualification for Areas of Limited Accessibility 1 03/2007  
-- 12/1973
1.72 Spray Pond Piping Made from Fiberglass-Reinforced Thermosetting Resin 2 11/1978 05/2009
1 01/1978
-- 12/1973
1.73 Qualification Tests of Electric Valve Operators Installed Inside the Containment of Nuclear Power Plants -- 01/1974  
1.74 Quality Assurance Terms and Definitions
(Withdrawn -- See 54 FR 38919, 09/21/1989)
W 09/1989  
-- 02/1974
1.75 Physical Independence of Electric Systems 3 02/2005  
2 09/1978
1 01/1975
-- 02/1974
1.76 Design-Basis Tornado and Tornado Missiles for Nuclear Power Plants 1 03/2007  
-- 04/1974
1.77 Assumptions Used for Evaluating a Control Rod Ejection Accident for Pressurized Water Reactors -- 05/1974  
1.78 Evaluating the Habitability of a Nuclear Power Plant Control Room During a Postulated Hazardous Chemical Release 1 12/2001 12/2011
-- 06/1974
1.79 Preoperational Testing of Emergency Core Cooling Systems for Pressurized Water Reactors 1 09/1975  
-- 06/1974
1.80 Preoperational Testing of Instrument Air Systems
(Withdrawn -- See 47 FR 19258, 05/4/1982)
W 05/1982  

To top of page

Page Last Reviewed/Updated Monday, September 24, 2012