12/05/2011 | II-11-068 | NRC Staff Schedules Meeting with Shaw Areva Mox Services to Discuss Performance at Mixed Oxide Facility |
12/05/2011 | 11-219 | NRC Advisory Committee on Medical Uses of Isotopes Teleconference Meeting Dec. 15 |
12/02/2011 | III-11-036 | NRC Concludes Davis-Besse Nuclear Plant Safe to Restart and Issues Confirmatory Action Letter |
12/01/2011 | 11-218 | NRC Approves Rule Enhancing Background Check Requirements for Staff at Research Reactors |
November | ||
Date | Document Number | Description |
11/29/2011 | 11-217 | NRC Seeks Public Comment on Implementation of Reactor Oversight Process |
11/29/2011 | 11-216 | NRC to Discuss Implementing Recommendations of Near-Term Japan Task Force Dec. 1 in Rockville, Md. |
11/21/2011 | I-11-042 | NRC Cites Pilgrim Nuclear Power Plant for Inspection Finding of Low to Moderate Safety Significance |
11/21/2011 | IV-11-049 | NRC Issues Waterford Nuclear Plant Inspection Finding of Low to Moderate Safety Significance |
11/18/2011 | II-11-067 | NRC Begins Special Inspection at Brunswick Nuclear Power Plant |
11/16/2011 | 11-215 | NRC Advisory Committee on Reactor Safeguards to Meet Dec. 1-3 in Rockville, Md. |
11/16/2011 | 11-214 | NRC a Top Performer in Government Survey |
11/16/2011 | III-11-035 | NRC Responds to Alert at Davis-Besse Nuclear Power Station |
11/16/2011 | 11-213 | NRC Meets Performance Goals; Issues FY 2011 Performance and Accountability Report |
11/15/2011 | II-11-066 | NRC Proposes $17,500 Civil Penalty for Global Nuclear Fuel – Americas LLC in Wilmington |
11/14/2011 | I-11-041 | NRC Names New Resident Inspector at Calvert Cliffs Nuclear Plant |
11/11/2011 | 11-212 | NRC Approves Restart of North Anna Reactors, Will Ensure Dominion Meets Commitments |
11/10/2011 | IV-11-048 | NRC to Hold Pre-Decisional Enforcement Conference with Roxar Flow Measurement, Inc |
11/10/2011 | 11-211 | NRC Seeks Public Input on Draft Supplement to Watts Bar 2 Nuclear Plant Environmental Statement; Meetings on Dec. 8 |
11/09/2011 | 11-210 | NRC Announces Availability of License Renewal Application for Grand Gulf Nuclear Power Plant |
11/07/2011 | II-11-065 | NRC Schedules Regulatory Conference to Discuss Apparent Violations at Oconee Nuclear |
11/04/2011 | 11-209 | NRC Chairman Jaczko to Visit India Nov. 14-18 |
11/01/2011 | 11-208 | Opening Remarks of NRC Chairman Gregory B. Jaczko at the Information Briefing on the Fuel Cycle Oversight Program |
11/01/2011 | 11-207 | NRC Approves Final Rule Amending ABWR Reactor Design Certification to Include Consideration of Aircraft Impacts |
October | ||
Date | Document Number | Description |
10/31/2011 | II-11-064 | NRC Schedules Conference With Progress Energy to Discuss Crystal River Nuclear Plant Emergency Plan Issue |
10/31/2011 | II-11-063 | NRC Schedules Public Meeting For Nov. 8 to Discuss Watts Bar Nuclear Unit 2 Construction Project |
10/31/2011 | 11-206 | NRC Approves Westinghouse Hematite’s Request to Dispose of Low-Level Radioactive Waste at U.S. Ecology Site in Idaho |
10/28/2011 | 11-205 | NRC Seeks Public Input on Draft Environmental Impact Statement for Fermi New Reactor; Meetings Scheduled Dec. 15 |
10/28/2011 | II-11-062 | NRC Names Senior Resident Inspector for Summer Nuclear Plant Construction Activities |
10/28/2011 | II-11-061 | NRC Names New Resident Inspector at Brunswick Nuclear Plant |
10/26/2011 | 11-204 | NRC Begins Special Inspection at Rhode Island Atomic Energy Commission Research Reactor |
10/26/2011 | 11-203 | NRC Finds No Significant Environmental Impact From Proposed Renewal of NFS Operating License |
10/24/2011 | II-11-060 | NRC Schedules Nov. 1 Meeting to Discuss Restart Readiness at North Anna Nuclear Power Station |
10/24/2011 | IV-11-047 | NRC Begins Special Inspection at Wolf Creek Nuclear Plant |
10/24/2011 | I-11-040 | New Inspector Named at Fitzpatrick Nuclear Plant |
10/21/2011 | IV-11-046 | NRC to Meet with Wolf Creek Nuclear Power Plant Officials |
10/21/2011 | IV-11-045 | NRC to Hold Meeting with Nebraska Public Power District on Cooper Nuclear Station |
10/20/2011 | 11-202 | NRC Takes Action on Japan Near-Term Task Force Safety Recommendations |
10/18/2011 | 11-201 | NRC Advisory Committee on Reactor Safeguards to Meet Nov. 3-5 in Rockville, MD |
10/18/2011 | 11-200 | Opening Remarks of NRC Chairman Gregory B. Jaczko at the Meeting to Discuss Safety Challenges of the Brown's Ferry Nuclear Power Plant |
10/17/2011 | 11-199 | NRC to Conduct Public Meeting on Alternative Dispute Resolution Program in Rockville, Md. Nov. 8 |
10/14/2011 | II-11-059 | NRC Schedules Meeting Oct. 20 to Discuss Areva Eagle Rock Enrichment Facility |
10/14/2011 | 11-198 | NRC Seeks Public Comment on Proposed Changes to Agency’s Consumer Products Policy Statement |
10/12/2011 | 11-197 | Opening Remarks of NRC Chairman Gregory B. Jaczko at the Mandatory Hearing for New Reactors at the Virgil C. Summer Site |
10/12/2011 | 11-196 | NRC Issues License to Areva Enrichment Services for Gas Centrifuge Uranium Enrichment Plant in Idaho |
10/12/2011 | 11-195 | NRC Seeks Public Comment on Draft Guidance Concerning Treatment of Uranium Filtered From Local Water Systems |
10/12/2011 | I-11-039 | New NRC Senior Resident Inspector Assigned to Peach Bottom Nuclear Plant |
10/11/2011 | 11-194 | Opening Remarks of NRC Chairman Gregory B. Jaczko at the 45 Day Review of the Japan Task Force Safety Recommendations |
10/07/2011 | 11-193 | NRC Presenting at National Academy of Sciences Meeting Oct. 20 on NRC-Sponsored Cancer Risk Study |
10/07/2011 | 11-192 | NRC to Discuss North Anna Restart Review Oct. 21 in Rockville, MD |
10/06/2011 | 11-191 | NRC to Inspect Fuel Cycle Facilities on Preparations for Natural Disasters |
10/05/2011 | IV-11-044 | NRC Begins Special Inspection of Uranium One USA Uranium Recovery Facility in Wyoming |
10/04/2011 | 11-190 | NRC to Discuss Prioritizing Recommendations of Near-Term Japan Task Force Oct. 11 in Rockville, Md. |
10/04/2011 | 11-189 | NRC Sponsors ICRP Symposium Oct. 24-26 in MD on International System of Radiological Protection |
10/04/2011 | 11-188 | Licensing Board to Conduct Hearing Oct. 31 in Rockville, Md., on South Texas Project New Nuclear Reactor Application |
10/03/2011 | 11-187 | NRC Advisory Committee on Medical Uses of Isotopes Teleconference Meeting Oct. 18 |
10/03/2011 | 11-186 | NRC to Hold Mandatory Hearing Regarding Summer New Reactor Application Oct. 12-13 in Rockville, Md. |
10/03/2011 | 11-185 | NRC Completes Fy11 Education Grant Awards |
September | ||
Date | Document Number | Description |
09/30/2011 | 11-184 | NRC Extends Construction Permit for Bellefonte Unit 1 |
09/30/2011 | 11-183 | NRC Confirms Post-Earthquake Requirements for the North Anna Nuclear Power Plant |
09/30/2011 | I-11-038 | NRC Assigns New Senior Resident Inspector to Vermont Yankee |
09/28/2011 | III-11-034 | NRC Begins Special Inspection at Palisades Nuclear Plant |
09/28/2011 | 11-182 | NRC Approves USEC’S Plan to Return Portsmouth Gaseous Diffusion Enrichment Plant to Department of Energy |
09/27/2011 | I-11-037 | NRC Names New Senior Resident Inspector at Beaver Valley Nuclear Power Plant |
09/27/2011 | I-11-036 | NRC Proposes $1,750 Fine for Virginia Firm for Nuclear Gauge Violation |
09/27/2011 | 11-181 | Opening Remarks of NRC Chairman Gregory B. Jaczko at the Commission Mandatory Hearing on Vogtle COL |
09/26/2011 | IV-11-043 | NRC Begins Special Inspection at Columbia Generating Station |
09/23/2011 | 11-180 | NRC Meetings in Maryland, Illinois and California to Discuss Long-Term Storage of Spent Nuclear Fuel |
09/22/2011 | 11-179 | NRC Receives Top-Notch Rankings From Annual Survey |
09/22/2011 | 11-178 | NRC to Hold Mandatory Hearing Regarding Vogtle New Reactor Application Sept. 27-28 in Rockville, Md. |
09/20/2011 | 11-177 | Amended: NRC Advisory Committee on Medical Uses of Isotopes to Meet Sept. 22-23, in Rockville, Md. |
09/20/2011 | II-11-058 | NRC Schedules Meeting Oct. 3 to Discuss Inspection at Browns Ferry Nuclear Power Plant |
09/20/2011 | II-11-057 | NRC Schedules Enforcement Conference with Global Nuclear Fuel for Sept. 29 |
09/20/2011 | II-11-056 | NRC Schedules Meeting Oct. 3 to Discuss Inspection at North Anna Nuclear Power Station |
09/19/2011 | IV-11-042 | NRC to Hold Regulatory Conference with Entergy Operations, Inc. |
09/16/2011 | 11-176 | NRC to Hold Meetings in IL, MA on Compatibility of State Regulations for Certain Devices |
09/16/2011 | 11-175 | Corrected: NRC Seeks Public Input On Draft Generic Letter Regarding Updated Seismic Analyses For U.S. Nuclear Reactors |
09/15/2011 | 11-174 | NRC Final Rule Changes Definition of Construction for Materials Applicants |
09/15/2011 | 11-173 | NRC to Discuss Industry's Post-Fukushima Efforts Sept. 21 in Rockville, Md. |
09/13/2011 | III-11-033 | NRC Begins Special Inspection at Monticello Nuclear Power Plant |
09/13/2011 | 11-172 | NRC Issues Final Yucca Mountain Technical Report, Nears Closure of Licensing Review |
09/13/2011 | I-11-035 | NRC Assigns New Inspector to Ginna Nuclear Plant |
09/12/2011 | 11-171 | NRC Advisory Committee on Medical Uses of Isotopes to Meet Sept. 22-23, in Rockville, Md. |
09/12/2011 | IV-11-041 | NRC Names New Resident Inspector at Callaway Nuclear Power Plant |
09/12/2011 | IV-11-040 | NRC Sends Special Inspection Team to Fort Calhoun Nuclear Plant |
09/09/2011 | 11-170 | NRC to Discuss Early Implementation Recommendations of Near-Term Japan Task Force Sept. 14 in Rockville, MD |
09/08/2011 | I-11-034 | NRC Statement on U.S. Department of Justice Action Announcing Plea Agreement with Former Radiation Protection Technician at the James A. FitzPatrick Nuclear Power Plant |
09/08/2011 | 11-169 | The NRC Goes Live on YouTube |
09/07/2011 | I-11-033 | NRC to Discuss Process for Review of License Renewal Application for Limerick Nuclear Plant, Seeks Environmental Review Input |
09/07/2011 | II-11-055 | NRC Names New Resident Inspector at St. Lucie Nuclear Power Plant |
09/07/2011 | II-11-054 | NRC Names New Senior Resident Inspector at McGuire Nuclear Power Station |
09/07/2011 | I-11-032 | New NRC Senior Resident Inspector Assigned to TMI |
09/07/2011 | 11-168 | NRC Holds Public Meetings to Discuss Proposed Changes to Regulations for Research and Test Reactors in Idaho Falls, Idaho Sept. 13-14 |
09/07/2011 | 11-167 | NRC to Meet with Dominion Sept. 8 to Discuss Ongoing Post-Earthquake Actions at North Anna Nuclear Power Station |
09/06/2011 | 11-166 | NRC Issues Mid-Cycle Assessment for Nation's Nuclear Plants |
09/02/2011 | IV-11-039 | NRC Issues Confirmatory Action Letter for Fort Calhoun Restart Preparations |
09/02/2011 | I-11-031 | NRC to Seek Public Input on Sept. 15 on Draft Report Assessing Possible Environmental Impacts of Seabrook License Extension |
09/01/2011 | 11-165 | NRC Issues Second of Three Technical Evaluation Reports on DOE's Yucca Mountain License Application |
09/01/2011 | 11-164 | NRC Seeks Public Input on Draft Generic Letter Regarding Updated Seismic Analyses for U.S. Nuclear Reactors |
August | ||
Date | Document Number | Description |
08/31/2011 | I-11-030 | NRC Assigns New Senior Resident Inspector To Hope Creek Nuclear Power Plant |
8/31/2011 | II-11-053 | NRC Schedules Meeting on NFS Oversight and Related Issues |
8/30/2011 | 11-163 | NRC Issues Supplemental Safety Evaluation for Indian Point Nuclear Power Plant License Renewal |
8/30/2011 | 11-162 | Commission Approves Emergency Preparedness Regulations for Nuclear Power Plants, Other Facilities |
8/30/2011 | 11-161 | Opening Remarks of NRC Chairman Gregory B. Jaczko at the Commission Meeting to Discuss Inspections, Tests, Analyses and Acceptance Criteria |
08/29/2011 | 11-160 | NRC Advisory Committee on Reactor Safeguards to Meet Sept. 8-10 in Rockville, Md.; New Member Appointed |
08/29/2011 | II-11-052 | NRC Sends Augmented Inspection Team to North Anna Nuclear Power Station |
08/26/2011 | 11-159 | NRC Makes Preparations for Approach of Hurricane Irene; Dispatches Additional Inspectors to Nuclear Plants |
08/26/2011 | III-11-032 | NRC Cites Perry Nuclear Plant for Issues Involving Radiological Controls |
08/25/2011 | I-11-029 | NRC to Hold Predecisional Enforcement Conference with International Cyclotron, Inc. |
08/25/2011 | 11-158 | NRC to Release Preliminary Evaluations of Rulemaking Request Regarding Emergency Core Cooling Requirements |
08/25/2011 | IV-11-038 | NRC Issues Confirmatory Order to Entergy With Actions to Improve Quality Control and Employee Concerns Programs |
08/24/2011 | 11-157 | NRC Continues to Assess North Anna Nuclear Power Plant Following Virginia Earthquake |
8/24/2011 | 11-156 | Follow NRC on Twitter |
08/24/2011 | 11-155 | NRC Presenting at National Academy of Sciences Meeting Aug 29 on NRC-Sponsored Cancer Risk Study |
08/24/2011 | 11-154 | NRC Seeks Comment on Draft Environmental Report for Columbia Nuclear Plant License Renewal; Meeting Sept. 27 |
08/24/2011 | II-11-051 | NRC Names New Senior Resident Inspector at Summer Nuclear Power Plant |
08/24/2011 | II-11-050 | NRC Names New Senior Resident Inspector at North Anna Nuclear Power Plant |
08/24/2011 | II-11-049 | NRC Assigns Resident Inspector to Robinson Nuclear Power Plant |
08/24/2011 | II-11-048 | NRC Schedules Meeting in Atlanta to Discuss Upcoming Inspections at Browns Ferry Nuclear Power Plant |
08/23/2011 | 11-153 | NRC Monitoring Alert at North Anna Following Virginia Earthquake |
08/23/2011 | 11-152 | NRC to Discuss Japan Task Force Recommendations Aug. 31 in Rockville, Md. |
08/19/2011 | 11-151 | Commission Seeks Prompt Action on Japan Task Force Recommendations |
08/18/2011 | III-11-031 | NRC Issues $15,000 Fine and Confirmatory Order to Professional Service Industries, Inc. |
08/18/2011 | 11-150 | NRC Issues Final Safety Evaluation Report for Virgil C. Summer New Reactors Application |
08/18/2011 | II-11-047 | NRC Issues Confirmatory Order to USEC’S Paducah Gaseous Diffusion Plant |
08/17/2011 | 11-149 | NRC Seeks Public Comment on Proposed Revisions to Low-Level Radioactive Waste Reduction Policy Statement |
08/17/2011 | 11-148 | NRC Issues License for the Lost Creek in Situ Uranium Recovery Project in Wyoming |
08/17/2011 | II-11-046 | NRC Schedules Meeting in Hartsville to Discuss Robinson Nuclear Power Plant |
08/17/2011 | III-11-030 | NRC Cites Prairie Island Unit 1 Nuclear Plant for an Issue Involving Battery Chargers |
08/16/2011 | II-11-045 | NRC Begins Special Inspection at Turkey Point Nuclear Power Plant |
08/15/2011 | III-11-029 | NRC Begins Special Inspection at Palisades Nuclear Power Plant |
08/15/2011 | II-11-044 | NRC Schedules Public Meeting for Aug. 24 to Discuss Watts Bar Unit 2 Construction Project |
08/15/2011 | 11-147 | NRC Announces Opportunity for Hearing on Application to Renew Operating Licenses for Limerick Nuclear Power Plant |
08/09/2011 | 11-146 | NRC Issues Final Safety Evaluation Report for Vogtle New Reactors Application |
08/09/2011 | I-11-028 | NRC Proposes Civil Penalty for Virginia Firm for Temporary Loss of Portable Nuclear Gauge |
08/08/2011 | I-11-027 | NRC Cites Millstone Unit 2 Nuclear Plant for Inspection Finding of Low to Moderate Safety Significance |
08/04/2011 | III-11-028 | NRC Schedules Public Meeting August 11 to Discuss Perry Nuclear Power Plant Performance and NRC Oversight |
08/04/2011 | II-11-043 | NRC Schedules Meeting to Discuss Restart of NFS Process Line |
08/04/2011 | 11-144 | **CORRECTED** Licensing Board to Conduct Hearing Aug. 17 in Austin, Texas, on South Texas Project New Nuclear Reactor Application |
08/02/2011 | IV-11-037 | NRC Names New Resident Inspector at Columbia Generating Station |
08/02/2011 | 11-145 | NRC Seeks Public Input on Draft Environmental Report for Seabrook Nuclear Plant License Renewal, Meeting Sept. 15 |
08/02/2011 | 11-144 | Licensing Board to Conduct Hearing Aug. 17in Austin, Texas, on South Texas Project New Nuclear Reactor Application |
08/02/2011 | 11-143 | NRC to Hold Public Workshop in Houston Aug. 11-12 on Medical Event Definition and Other Rule Changes |
July | ||
Date | Document Number | Description |
07/28/2011 | 11-142 | Opening Remarks of NRC Chairman Gregory B. Jaczko at the Briefing on NRC’s Approach to Severe Accidents |
07/28/2011 | 11-141 | NRC Invites Nominations for Advisory Committee on Medical Use of Isotopes |
07/27/2011 | IV-11-036 | NRC to Hold Predecisional Enforcement Conference with Forsgren Associates |
07/25/2011 | 11-140 | NRC Publishes Final Policy Statement on Protection of Cesium Chloride Radiation Sources |
07/21/2011 | 11-139 | NRC Approves “Time Off” Amendment to its Fitness-For-Duty Regulations |
07/21/2011 | 11-138 | NRC Issues First of Three Technical Evaluation Reports on Doe’s Yucca Mt. License Application |
07/21/2011 | 11-137 | Japan Task Force Holding Public Meeting July 28 in Rockville, Md. |
07/21/2011 | III-11-027 | NRC to Hold Regulatory Conference on July 28 to Discuss Preliminary White Inspection Finding at Prairie Island Nuclear Plant |
07/20/2011 | 11-136 | NRC Seeks Public Comment on Potential Rulemaking to Revise Reporting of Defects in Reactor Parts; Meeting Aug. 1 |
07/20/2011 | 11-135 | NRC Recognized for Diversity/Work Life Balance |
07/20/2011 | 11-134 | NRC’s ACRS Subcommittee on Plant Operations and Fire Protection to Meet July 28 in Atlanta, Ga. |
07/20/2011 | 11-133 | NRC Seeks Public Comment on Prompt Remediation of Radioactive Contamination; Webinar to be Held July 25 |
07/20/2011 | I-11-026 | NRC, CENG Managers to Discuss Company’s Fleet of Nuclear Plants at Public Meeting on July 26 |
07/20/2011 | 11-132 | NRC Renews Operating Licenses for Hope Creek Nuclear Power Plant for an Additional 20 Years |
07/20/2011 | 11-131 | NRC Issues License to Uranerz Energy Corp. for Nichols Ranch Uranium Recovery Project in Wyoming |
07/19/2011 | III-11-026 | NRC Names New Resident Inspector at Point Beach Nuclear Plant |
07/19/2011 | 11-130 | Opening Remarks of NRC Chairman Gregory B. Jaczko at the Japan Task Force Briefing |
07/19/2011 | IV-11-035 | NRC Cites Fort Calhoun Nuclear Plant for Inspection Finding of Low to Moderate Safety Significance |
07/19/2011 | 11-129 | NRC Names Mark A. Satorius as Director Of Federal and State Materials and Environmental Management Programs |
07/15/2011 | III-11-025 | NRC Responds to Alert at Dresden Nuclear Power Plant |
07/14/2011 | IV-11-034 | NRC Staff to Meet with Omaha Public Power District Officials to Discuss Fort Calhoun Nuclear Plant |
07/13/2011 | 11-128 | NRC Directs Staff to Examine Feasibility and Need of Study on Radiation Doses to Public from Nuclear Medicine |
07/13/2011 | 11-127 | NRC’s Japan Task Force Recommends Changes to Defense in Depth Measures at Nuclear Plants; Cites Station Blackout, Seismic, Flooding and Spent Fuel Pools as Areas for Improvement |
07/12/2011 | 11-126 | Opening Remarks of NRC Chairman Gregory B. Jaczko at the Briefing Addressing the IRRS Report |
07/11/2011 | IV-11-033 | NRC Issues $3,500 Fine and Confirmatory Order to Bozeman Deaconess Hospital |
07/11/2011 | IV-11-032 | NRC Proposes $8,500 Fine for Luzenac America, Inc. |
07/07/2011 | 11-125 | William C. Ostendorff Sworn in as Commissioner of the U.S. Nuclear Regulatory Commission for a Second Term |
07/06/2011 | 11-124 | NRC Issues Supplemental Safety Evaluation for Pilgrim Nuclear Power Plant License Renewal |
07/06/2011 | 11-123 | NRC Advisory Committee on Reactor Safegurds to Meet July 13-15 in Rockville, Md. |
07/06/2011 | II-11-042 | NRC Begins Special Inspection at Oconee Nuclear Plant |
07/06/2011 | II-11-041 | NRC Schedules Regulatory Conference to Discuss Apparent Violation at Farley Nuclear Plant |
07/01/2011 | 11-122 | NRC Holding Public Meeting to Discuss the Westinghouse Hematite Decommissioning Plan |
June | ||
Date | Document Number | Description |
06/30/2011 | 11-121 | NRC Announces Availability of License Application for Ross Uranium Recovery Project in Wyoming |
06/30/2011 | 11-120 | NRC Renews Operating Licenses for Salem Nuclear Power Plant for an Additional 20 Years |
06/30/2011 | 11-119 | NRC Announces Availability of License Renewal Application for Limerick Nuclear Power Plant Units 1 and 2 |
06/30/2011 | III-11-024 | NRC Names New Senior Resident Inspector at Duane Arnold Energy Center |
06/30/2011 | III-11-023 | NRC Names New Resident Inspector at Monticello Nuclear Power Plant |
06/30/2011 | II-11-040 | NRC Assigns New Resident Inspector to Crystal River Nuclear Power Plant |
06/29/2011 | 11-118 | NRC Renews Operating Licenses for Prairie Island Nuclear Power Plant for an Additional 20 Years |
06/29/2011 | 11-117 | NRC Publishes Annual Security Inspection Report to Congress |
06/29/2011 | 11-116 | NRC Issues Annual Report on Abnormal Occurrences for FY2010 |
06/27/2011 | I-11-025 | NRC, Virginia Company to Discuss Apparent Violation Stemming From Temporary Loss of Nuclear Gauge |
06/27/2011 | 11-115 | Licensing Board to Hear Oral Argument July 7 in Rockville, Md., on Calvert Cliffs New Nuclear Reactor Application |
06/26/2011 | IV-11-031 | NRC Activates Incident Response Center for Tracking Events at the Fort Calhoun Nuclear Power Plant |
06/24/2011 | I-11-024 | Millstone Regulatory Conference Postponed; Now Scheduled for July 19th |
06/22/2011 | IV-11-030 | NRC Tracking Flooding at Two Nebraska Nuclear Power Plants |
06/22/2011 | 11-114 | NRC Issues Final Licensing, Inspection and Annual Fees Rule for Fiscal Year 2011 |
06/21/2011 | I-11-023 | NRC to Hold Regulatory Conference on June 30 Regarding Preliminary ‘White’ Finding Issued to Millstone 2 Nuclear Plant |
06/21/2011 | 11-113 | Remarks of NRC Chairman Gregory Jaczko, Prepared for Delivery, Press Conference, IAEA Ministerial Conference, Vienna, Austria, June 21, 2011 |
06/20/2011 | IV-11-029 | NRC Names New Resident Inspector at Grand Gulf Nuclear Station |
06/17/2011 | 11-112 | NRC Determines No Major Environmental Impacts Preclude Licensing Lost Creek Uranium Recovery Site in Wyoming |
06/17/2011 | 11-111 | NRC Issues New Environmental Protection Requirements to Avoid Future Legacy Sites with Radioactive Material |
06/16/2011 | I-11-022 | Decommissioning of Walter Reed Army Medical Center Facilities to Be Discussed at NRC Meeting Scheduled for June 23 |
06/16/2011 | III-11-022 | NRC Public Meeting June 23 to Discuss Decommissioning Plans for University of Missouri Building |
06/15/2011 | 11-110 | NRC Selects Laura Weil as Patients' Rights Advocate on Advisory Committee on the Medical Uses of Isotopes |
06/15/2011 | 11-109 | Opening Remarks of NRC Chairman Gregory B. Jaczko at the 60-Day Update From the Japan Task Force |
06/15/2011 | 11-108 | NRC Schedules Public Meeting June 21 to Discuss Implementing Revisions to the Environmental Protection Regulations Rule for License Renewal of Nuclear Power Plants |
06/15/2011 | 11-107 | NRC Issues License to TVA Authorizing Receipt of Fresh Nuclear Fuel for Watts Bar Nuclear Plant Unit 2 |
06/14/2011 | 11-106 | NRC Schedules Public Meeting June 23 to Discuss Implementing Fingerprint Rule for Research and Test Reactors |
06/14/2011 | 11-105 | Nuclear Regulatory Commission Honors Employees June 14 in Rockville, Md. |
06/14/2011 | 11-104 | NRC Issues Final Safety Culture Policy Statement |
06/14/2011 | IV-11-028 | NRC to Meet with Entergy Operations, Inc. |
06/14/2011 | IV-11-027 | NRC to Discuss 2010 Performance Assessment for Columbia Generating Station |
06/13/2011 | IV-11-026 | NRC Cites Cooper Nuclear Station for Inspection Finding of Low to Moderate Safety Significance |
06/13/2011 | 11-103 | Licensing Board to Hold Teleconference Oral Argument June 27 on South Texas Project Reactor License Renewal Application |
06/13/2011 | II-11-039 | NRC Schedules Public Meeting for June 20 to Discuss Watts Bar Unit 2 Construction Schedule |
06/13/2011 | I-11-021 | NRC to Hold Meeting on June 22 In Brattleboro, Vt., to Discuss Annual Assessment of Vermont Yankee Nuclear Power Plant |
06/10/2011 | 11-102 | Joint Press Release on Cooperation Regarding the Accident at TEPCO's Fukushima Dai-ichi Nuclear Power Plant; Gregory Jaczko, Chairman, Nuclear Regulatory Commisison, Goshi Hosono, Special Adviser to the Prime Minister of Japan, June 10, 2011 |
06/09/2011 | 11-101 | ASLB to Conduct Environmental Hearing on AREVA'S Uranium Enrichment Plant Proposed for Idaho |
06/09/2011 | 11-100 | NRC Launches Plain Writing Section on Website |
06/08/2011 | IV-11-025 | Dates Corrected: NRC Monitored Alert, Flooding at Fort Calhoun Nuclear Station |
06/08/2011 | 11-099 | Statement of NRC Chairman Gregory B. Jaczko |
06/07/2011 | I-11-020 | International Safety Review Team to Visit Seabrook Nuclear Plant |
06/06/2011 | 11-098 | Opening Statement of NRC Chairman Gregory B. Jaczko at Today's ACRS Meeting |
06/06/2011 | III-11-021 | NRC Schedules Open House for June 16 to Discuss D. C. Cook Nuclear Power Plant Performance and NRC Oversight |
06/06/2011 | III-11-020 | NRC Schedules Public Meeting for June 15 to Discuss Davis-Besse Nuclear Power Plant Performance and NRC Oversight |
06/06/2011 | 11-097 | NRC Continues Examination of Emergency Procedures at U.S. Nuclear Plants |
06/03/2011 | 11-096 | NRC to Host Fuel Cycle Information Exchange, June 7–8 in Rockville, Maryland |
06/02/2011 | 11-095 | NRC Issues Final Safety Evaluation Report for Diablo Canyon Power Plant License Renewal |
06/02/2011 | 11-094 | Opening Remarks of NRC Chairman Gregory B. Jaczko at Today's Briefing to the Commission from the Office of Human Resources and Office of Small Business and Civil Rights |
06/02/2011 | 11-093 | NRC Seeks Comments on Draft Environmental Report for Crystal River Nuclear Plant Unit 3 License Renewal Proposal; Meeting June 28 |
06/01/2011 | 11-092 | Nuclear Regulatory Commission Receives Two Community Awards From Montgomery County |
06/01/2011 | I-11-019 | NRC to Hold Public Meeting on June 8th in Seabrook, N.H., to Discuss Annual Assessment of Seabrook Nuclear Power Plant |
May | ||
Date | Document Number | Description |
05/31/2011 | I-11-018 | NRC to Hold Meeting on June 7th in Harrisburg, Pa., to Discuss Annual Assessment for Three Mile Island 1 Nuclear Plant |
05/27/2011 | 11-091 | Opening Remarks of NRC Chairman Gregory B. Jaczko at Today's Briefing on the Agency Action Review Meeting |
05/26/2011 | 11-090 | NRC to Hold Public Workshops in New York City and Houston on Medical Event Definition and Other Rule Changes |
05/26/2011 | II-11-138 | NRC Schedules Public Meeting for June 7 to Discuss Performance of Crystal River Nuclear Power Plant |
05/25/2011 | 11-089 | NRC Advisory Committee on Reactor Safeguards to Meet June 8-10 in Rockville, Md. |
05/23/2011 | I-11-017 | NRC to Hold Public Meeting on June 1st in Plymouth, Mass., to Discuss Annual Assessment of Pilgrim Nuclear Power Plant |
05/20/2011 | 11-088 | NRC Issues Summary of Recent U.S. Nuclear Plant Inspections |
05/20/2011 | 11-087 | NRC Chairman Gregory B. Jaczko's Statement on AP1000 Review Issues |
05/20/2011 | I-11-016 | NRC to Hold Public Meeting on June 2nd in Cortlandt Manor, N.Y., to Discuss Annual Assessment of Indian Point Nuclear Plant |
05/19/2011 | IV-11-024 | NRC to Hold Regulatory Conference With Omaha Public Power District on Fort Calhoun Nuclear Power Plant on June 2 |
05/18/2011 | II-11-037 | NRC Schedules Public Meeting for May 31 to Discuss Performance of Browns Ferry Nuclear Power Plant |
05/18/2011 | II-11-036 | NRC Schedules Public Meeting for May 26 to Discuss Performance of Summer Nuclear Power Plant |
05/18/2011 | II-11-035 | NRC Schedules Public Meeting for May 25 to Discuss Performance of Brunswick Nuclear Power Plant |
05/17/2011 | 11-086 | NRC Presenting at National Academy of Sciences Meeting May 23 in Atlanta Regarding NRC-Sponsored Cancer Risk Study |
05/17/2011 | 11-085 | NRC Seeks Public Comment on Proposed Rule Requiring Detailed Safety Analyses for Uranium Conversion Facilities |
05/17/2011 | 11-084 | NRC Issues Final Environmental Impact Statement for Prairie Island Nuclear Plant |
05/16/2011 | 11-083 | NRC Exits Monitoring Mode for Japanese Nuclear Emergency; Continues to Support U.S. Government Efforts |
05/16/2011 | I-11-015 | NRC to Hold Two Public Meetings on May 25th in Waterford, Conn., to Discuss Annual Assessment of Millstone Nuclear Power Plant |
05/16/2011 | 11-082 | NRC, U.S. Army Corps of Engineers Issue Final Environmental Impact Statement for New Reactors at Comanche Peak Site |
05/16/2011 | I-11-014 | NRC to Hold Public Meeting on May 26th in Toms River, N.J., to Discuss Annual Assessment of Oyster Creek Nuclear Plant |
05/16/2011 | I-11-013 | NRC Begins Special Inspection at Pilgrim Nuclear Power Plant |
05/13/2011 | 11-081 | Inspections at U.S. Nuclear Plants Prompt Corrective Actions; Reports Being Made Public |
05/13/2011 | 11-080 | NRC, U.S. Army Corps of Engineers Issue Final Environmental Impact Statement for New Reactor at Calvert Cliffs Site |
05/13/2011 | III-11-019 | NRC Schedules Public Meeting for May 26 to Discuss Kewaunee Power Station Performance and NRC Oversight |
05/13/2011 | III-11-018 | NRC Schedules Public Meeting for May 25 to Discuss Point Beach Nuclear Plant Performance and NRC Oversight |
05/12/2011 | 11-079 | NRC Public Meeting May 19 in Piketon, Ohio, to Discuss Decertification of Portsmouth Gaseous Diffusion Plant |
05/12/2011 | IV-11-023 | NRC to Discuss Performance Assessment for Diablo Canyon Nuclear Power Plant |
05/11/2011 | III-11-017 | NRC Schedules Open House for May 23 to Discuss Fermi Nuclear Power Plant Performance and NRC Oversight |
05/11/2011 | 11-078 | NRC Staff Issues Bulletin to Nuclear Power Plants on Strategies to Handle Extreme Events |
05/10/2011 | IV-11-022 | NRC to Discuss Performance Assessment of South Texas Project Nuclear Power Plant |
05/10/2011 | IV-11-021 | NRC Names New Resident Inspector at Diablo Canyon Nuclear Power Plant |
05/10/2011 | II-11-034 | NRC Finds Valve Failure at Browns Ferry to Be of High Safety Significance |
05/09/2011 | IV-11-019R | Reissued - NRC to Discuss 2010 Performance Assessment for Waterford 3 Nuclear Plant |
05/09/2011 | I-11-012 | NRC to Hold Public Meeting on May 19th in Berwick, Pa., to Discuss Annual Assessment of Susquehanna Nuclear Plant |
05/09/2011 | 11-077 | NRC Public Meeting May 18 in Rockville, Md, to Discuss Upcoming Seismic Review of U.S. Nuclear Power Plants |
05/09/2011 | I-11-011 | NRC to Hold Public Meeting on May 18th in Limerick, Pa., to Discuss Annual Assessment of Limerick Nuclear Power Plant |
05/05/2011 | IV-11-020R | Reissued - NRC to Discuss 2010 Performance Assessment of Comanche Peak Nuclear Power Plant |
05/05/2011 | II-11-033 | NRC Reschedules Meeting to Discuss Safety Performance of USEC's Paducah Gaseous Diffusion Plant |
05/05/2011 | II-11-032 | NRC Reschedules Meeting to Discuss Safety Performance of Honeywell Metropolis Facility |
05/04/2011 | III-11-016 | NRC Continues to Monitor Event at Duane Arnold Nuclear Power Plant |
05/03/2011 | III-11-015 | NRC Activates its Emergency Response Center Due to an Alert at Duane Arnold Nuclear Power Plant |
05/03/2011 | IV-11-020 | NRC to Discuss 2010 Performance Assessment of Comanche Peak Nuclear Power Plant |
05/03/2011 | IV-11-019 | NRC to Discuss 2010 Performance Assessment for Waterford 3 Nuclear Plant |
05/03/2011 | IV-11-018 | NRC Schedules Open House to Discuss the 2010 Performance of River Bend Nuclear Station |
05/03/2011 | 11-076 | NRC to Hold Public Meeting May 10 in Aiken. S.C., to Discuss Safety Evaluation Report on Mox Fuel Facility Application |
05/03/2011 | IV-11-017 | NRC to Hold Open House to Discuss 2010 Performance for Palo Verde Nuclear Generating Station |
05/03/2011 | 11-075 | NRC Approves Increased Power Output for Point Beach Nuclear Power Plant |
05/03/2011 | 11-074 | Opening Remarks of NRC Chairman Gregory B. Jaczko at Today's Briefing on Emergency Preparedness |
05/03/2011 | II-11-031 | NRC Schedules Meeting to Discuss Safety Performance of Westinghouse Nuclear Fuel Plant in Columbia |
05/03/2011 | III-11-014 | NRC Schedules Two Public Meetings May 12 to Discuss Braidwood Nuclear Station Performance and Special Inspection Findings at Braidwood and Byron Plants |
05/02/2011 | I-11-010 | NRC to Hold Public Meeting on May 12th in Prince Frederick, Md., to Discuss Annual Assessment of Calvert Cliffs Nuclear Plant |
05/02/2011 | 11-073 | NRC to Hold Predecisional Enforcement Conference with U.S. Army on Depleted Uranium Munitions at Army Sites |
05/02/2011 | III-11-013 | NRC Schedules Open House for May 11 to Discuss Dresden Nuclear Power Plant Performance and NRC Oversight |
April | ||
Date | Document Number | Description |
04/29/2011 | I-11-009 | NRC to Hold Public Meeting on May 10th in Salem, N.J., to Discuss Annual Assessment of Salem, Hope Creek Nuclear Power Plants |
04/28/2011 | 11-072 | NRC Advisory Committee on Reactor Safeguards to Meet May 12-14 in Rockville, Md. |
04/28/2011 | 11-071 | Opening Remarks of Chairman Gregory B. Jaczko at Commission Briefing on Japan and the Station Blackout Rule |
04/28/2011 | II-11-030 | NRC Monitors Events at Browns Ferry Nuclear Power Plant After Loss of Offsite Power and Unusual Event Declaration |
04/27/2011 | II-11-029 | NRC Staff to Meet with USEC to Discuss Performance at Paducah Gaseous Diffusion Plant |
04/27/2011 | II-11-028 | NRC Schedules Meeting to Discuss Safety Performance of Honeywell Metropolis Facility |
04/26/2011 | III-11-012 | NRC Begins Special Inspection at Perry Nuclear Plant |
04/26/2011 | I-11-008 | NRC to Hold Public Meeting on May 5 in Macedon, N.Y. to Discuss annual Assessment of Ginna Nuclear Power Plant |
04/26/2011 | 11-070 | NRC Seeks Public Comments on New Proposed “Time Off” Amendment to its Fitness-For-Duty Regulations |
04/26/2011 | IV-11-016 | NRC to Hold Open House to Discuss 2010 Performance of Arkansas Nuclear One |
04/25/2011 | 11-069 | Online Registration Open for Fuel Cycle Information Exchange, June 7-8 in Rockville, Md. |
04/22/2011 | I-11-007 | NRC to Hold Public Meeting on May 4th in Scriba, N.Y., to Discuss Annual Assessment of Nine Mile Point, Fitzpatrick Nuclear Plants |
04/21/2011 | 11-068 | NRC Renews Operating Licenses for Palo Verde Nuclear Power Plant for an Additional 20 Years |
04/21/2011 | IV-11-015 | NRC to Hold Regulatory Conference with Nebraska Public Power District on Cooper Nuclear Station |
04/21/2011 | III-11-011 | NRC Schedules Public Meeting for May 5 to Discuss Palisades Nuclear Power Plant Performance and NRC Oversight |
04/21/2011 | III-11-010 | NRC Schedules Public Meeting for May 5 to Discuss Byron Nuclear Power Plant Performance and NRC Oversight |
04/21/2011 | II-11-027 | NRC Schedules Public Meeting to Discuss 2010 Performance of Turkey Point Nuclear Power Plant |
04/20/2011 | II-11-026 | NRC Schedules Meeting to Discuss 2010 Performance Assessment for Sequoyah Nuclear Power Plant |
04/20/2011 | II-11-025 | NRC Schedules Meeting to Discuss 2010 Performance Assessment for Catawba Nuclear Power Plant |
04/20/2011 | II-11-024 | NRC Schedules Meeting to Discuss 2010 Performance Assessment for McGuire Nuclear Power Plant |
04/20/2011 | II-11-023 | NRC Schedules Meetings to Discuss 2010 Performance Assessment for Watts Bar 1 Nuclear Power Plant and Construction Inspections for Watts Bar 2 |
04/20/2011 | IV-11-014 | NRC to Discuss 2010 Performance Assessment for Cooper Nuclear Plant |
04/19/2011 | 11-067 | NRC, U.S. Army Corps of Engineers Issue Final Environmental Impact Statement for New Reactors at Virgil C. Summer Site |
04/19/2011 | 11-066 | Opening Remarks of NRC Chairman Gregory B. Jaczko at Today's Briefing on Part 37 Proposed Rule |
04/19/2011 | IV-11-013 | NRC to Hold Open House to Discuss 2010 Performance of Callaway Nuclear Plant |
04/18/2011 | II-11-022 | NRC to Present Results of Licensee Performance Review at Global Nuclear Fuel-Americas in Wilmington |
04/18/2011 | 11-065 | NRC Unveils New Web Design that Enhances Usability and Adds New Features |
04/17/2011 | II-11-021 | NRC Monitors Events at Surry Nuclear Power Plant After Loss of Offsite Power and Unusual Event Declaration |
04/15/2011 | I-11-006 | NRC to Hold Public Meeting on April 28 in Shippingport PA., to Discuss Annual Assessment of Beaver Valley Nuclear Plant |
04/14/2011 | III-11-009 | NRC Schedules Open House for April 28 to Discuss Clinton Nuclear Power Plant Performance and NRC Oversight |
04/14/2011 | III-11-008 | NRC Schedules Open House for April 28 to Discuss Duane Arnold Nuclear Power Plant Performance and NRC Oversight |
04/14/2011 | II-11-020 | NRC Schedules Meeting to Discuss 2010 Performance Assessment for Hatch Nuclear Power Plant |
04/14/2011 | II-11-019 | NRC Schedules Meeting to Discuss 2010 Performance Assessment for Vogtle Nuclear Power Plant |
04/14/2011 | II-11-018 | NRC Schedules Meeting to Discuss 2010 Performance Assessment for Oconee Nuclear Power Plant |
04/11/2011 | IV-11-012 | NRC Sends Special Inspection Team to Cooper Nuclear Station |
04/11/2011 | 11-064 | NRC Approves Increased Power Output for Limerick Nuclear Power Plant |
04/08/2011 | 11-063 | NRC Presenting at National Academy of Sciences Meeting April 18 in Chicago Regarding NRC-Sponsored Cancer Risk Study |
04/07/2011 | IV-11-011 | NRC to Discuss 2010 Performance Assessment for San Onofre Nuclear Generating Station |
04/06/2011 | III-11-007 | NRC Begins Special Inspection at Braidwood and Byron Nuclear Plants |
04/06/2011 | III-11-006 | NRC to Discuss 2010 Performance Assessment for LaSalle Nuclear Power Plant Unit 1 and 2 April 13 |
04/06/2011 | III-11-005 | NRC Schedules Open House and Public Meeting for April 14 to Discuss Prairie Island Nuclear Power Plant Performance and NRC Oversight |
04/04/2011 | I-11-005 | NRC to Hold Public Meeting on April 13 in Delta, Pa., to Discuss Annual Assessment of Peach Bottom Nuclear Power Plant |
04/01/2011 | II-11-017 | NRC Schedules Meeting to Discuss 2010 Performance of Harris Nuclear Power Plant |
04/01/2011 | II-11-016 | NRC Schedules Meeting to Discuss 2010 Performance of St. Lucie Nuclear Power Plant |
04/01/2011 | II-11-015 | NRC to Discuss URENCO USA Performance at Meeting in Eunice |
04/01/2011 | 11-062 | NRC Appoints Task Force Members and Approves Charter For Review of Agency’s Response to Japan Nuclear Event |
04/01/2011 | 11-061 | Licensing Board Admits Additional Contentions Regarding Mixed-Oxide Fuel Fabrication Facility License Application |
04/01/2011 | IV-11-010 | NRC to Discuss 2010 Performance Assessment for Grand Gulf Nuclear Plant April 13 |
04/01/2011 | 11-060 | NRC Issues Final Environmental Impact Statement and Safety Evaluation Reports for Salem and Hope Creek Nuclear Power Plants‘ License Renewal Application |
March | ||
Date | Document Number | Description |
03/30/2011 | II-11-014 | NRC to Discuss NFS Performance at Public Meeting in Erwin |
03/30/2011 | II-11-013 | NRC Schedules Meeting to Discuss 2010 Performance of Surry Nuclear Power Plant |
03/30/2011 | II-11-012 | NRC Schedules Conference with TVA to Discuss Browns Ferry Nuclear Plant Issues |
03/29/2011 | IV-11-009 | NRC to Discuss 2010 Performance Assessment for Wolf Creek Nuclear Plant |
03/29/2011 | 11-059 | NRC Advisory Committee on Medical Uses of Isotopes to Meet Apr. 11-12 in Rockville, Md. |
03/29/2011 | II-11-011 | NRC Schedules Open House to Discuss 2010 Performance of North Anna Nuclear Power Plant |
03/28/2011 | III-11-004 | NRC Schedules Open House for April 5 to Discuss Monticello Nuclear Power Plant Performance and NRC Oversight |
03/28/2011 | III-11-003 | NRC Schedules Open House for April 5 to Discuss Quad Cities Nuclear Power Plant Performance and NRC Oversight |
03/25/2011 | 11-058 | NRC Issues Final Supplemental Environmental Impact Statement for Vogtle New Reactors Application |
03/24/2011 | 11-057 | NRC Advisory Committee on Reactor Safeguards to Meet April 7-9 in Rockville, Md. |
03/24/2011 | 11-056 | NRC Seeks Comment on Proposed Rule to Certify GE-Hitachi ESBWR Reactor Design |
03/23/2011 | 11-055 | Nuclear Regulatory Commission Directs Staff on Continuing Agency Response to Japan Events; Adjusts Commission Schedule |
03/23/2011 | II-11-010 | NRC to Discuss 2010 Performance of Farley Nuclear Power Plant |
03/23/2011 | IV-11-008 | NRC to Discuss 2010 Performance Assessment for Fort Calhoun Nuclear Plant |
03/21/2011 | IV-11-007 | NRC Sends Special Inspection Team to Callaway Nuclear Plant |
03/21/2011 | 11-054 | Opening Remarks of NRC Chairman Gregory B. Jaczko at Today's Commission Meeting on the Events in Japan |
03/19/2011 | 11-053 | NRC Posts Updated Seismic Questions and Answers |
03/18/2011 | 11-052 | NRC Informs U.S. Nuclear Power Plants on Japan Earthquake's Effects |
03/18/2011 | 11-051 | NRC Proposes to Amend Licensing, Inspection and Annual Fees Rule |
03/17/2011 | II-11-009 | NRC Cancels Crystal River Plant Restart Meeting |
03/17/2011 | II-11-008 | NRC Schedules Meeting to Discuss 2010 Performance of Robinson Nuclear Power Plant |
03/16/2011 | 11-050 | NRC Provides Protective Action Recommendations Based on U.S. Guidelines |
03/15/2011 | 11-049 | NRC Analysis Continues to Support Japan’s Protective Actions |
03/15/2011 | 11-048 | (Revised) NRC Sends Additional Experts to Assist Japan |
03/14/2011 | II-0-007 | NRC Sends Special Inspection Team to Global Nuclear Fuel Plant |
03/14/2011 | 11-047 | Japanese Government Asks for Assistance with Reactor Events; U.S. Government and NRC Preparing Response |
03/13/2011 | 11-046 | (Revised)NRC Sees No Radiation at Harmful Levels Reaching U.S. From Damaged Japanese Nuclear Power Plants |
03/12/2011 | 11-045 | NRC Experts Deploy to Japan as Part of U.S. Government Response |
03/12/2011 | 11-044 | NRC in Communication with Japanese Regulators |
03/11/2011 | 11-043 | NRC Continues to Track Earthquake and Tsunami Issues |
03/11/2011 | 11-042 | NRC Monitors Notice of Unusual Event at Diablo Canyon Power Plant, Tsunami Issues |
03/10/2011 | 11-041 | NRC Will Renew Vermont Yankee Operating License for an Additional 20 Years |
03/10/2011 | 11-040 | ASLB Offers Government Agencies Chance to Participate in Hearing on Idaho Uranium Enrichment Project |
03/09/2011 | 11-039 | NRC Issues Final Safety Evaluation Report and Final Design Approval for GE-Hitachi ESBWR Advanced Reactor |
03/09/2011 | 11-038 | NRC Announces Availability of the IAEA's Integrated Regulatory Review Service Final Report on NRC Nuclear Reactor Program |
03/09/2011 | 11-037 | NRC Announces Availability of the IAEA's Integrated Regulatory Review Service Final Report on NRC Nuclear Reactor Program |
03/08/2011 | 11-036 | NRC Issues Annual Assessment Letters for Nation's Nuclear Plants |
03/04/2011 | II-11-006 | NRC Schedules Meeting to Discuss Crystal River Restart |
03/03/2011 | 11-035 | NRC Advisory Committee on Reactor Safeguards to Meet March 10-12 in Rockville, Md. |
03/02/2011 | 11-034 | NRC Proposes FY 2012 Budget to Congress; Detailed Budget Justification Report Available |
03/02/2011 | 11-033 | NRC Issues Final Environmental Impact Statement for South Texas Project New Reactors Application |
03/01/2011 | 11-032 | Opening Remarks of Chairman Gregory B. Jaczko at Today’s Briefing on Reactor Materials Aging Management Issues |
February | ||
Date | Document Number | Description |
02/24/2011 | 11-030 | NRC Renews Operating License for Kewaunee Nuclear Power Plant for an Additional 20 Years |
02/24/2011 | 11-029 | Opening Remarks of NRC Chairman Gregory B. Jaczko at the Briefing on Groundwater Task Force |
02/24/2011 | I-11-004 | Licensing Board Grants Motion Expediting March 9th Proceedings Plymouth, Mass., on Pilgrim License Renewal Contention |
02/23/2011 | III-11-002 | NRC Issues Orders to Two Individuals Involved in 2002-2008 Medical Errors at VA Medical Center in Philadelphia |
02/22/2011 | I-11-003 | NRC Begins Special Inspection at Millstone Unit 2 Nuclear Plant |
02/18/2011 | 11-028 | NRC Issues Summary of Agency Performance and Financial Information for 2010 |
02/16/2011 | I-11-002 | Licensing Board to Hold Evidentiary Hearing on March 9th in Plymouth, Mass., on Pilgrim License Renewal Contention |
02/16/2011 | 11-027 | Public Meeting Feb. 24 to Discuss Revisions to Key NRC Document on Classification of Low-Level Waste |
02/16/2011 | 11-026 | Nuclear Regulatory Commission Lays Out Framework for Conducting Mandatory Hearings on New Reactor Licenses |
02/14/2011 | 11-025 | NRC FY 2012 Budget Briefing Slides Available on Website |
02/14/2011 | 11-024 | NRC Issues New Guidance on Release of Patients Following Iodine Treatment for Thyroid Conditions |
02/14/2011 | 11-023 | NRC Finds No Significant Environmental Impacts from Proposed Uranium Enrichment Plant in Idaho |
02/10/2011 | 11-022 | NRC Seeks Comment on Proposed Rule to Amend Certified AP1000 Reactor Design |
02/10/2011 | I-11-001 | Firm In Indiana, Pa., to Pay $17,000 Fine, Make Changes Under Settlement Agreement with NRC |
02/08/2011 | 11-021 | Opening Remarks Of NRC Chairman Gregory B. Jaczko at Today's Commission Meeting to Discuss the Implementation of Part 26’s Fatigue Management Requirements |
02/08/2011 | 11-020 | NRC Participating in National Academy of Sciences Meeting on Feb. 24 on First Phase of NRC-Sponsored Analysis of Cancer Risks |
02/08/2011 | 11-019 | NRC Seeks Public Comment for Updated Environmental Impact Statement for North Anna New Reactor Application |
02/08/2011 | III-11-001 | NRC Schedules Public Meetings to Discuss Zion Nuclear Power Plant Decommissioning |
02/08/2011 | 11-018 | NRC Seeks Public Comment on Proposed Rule on Verifying New Reactor Construction |
02/07/2011 | 11-017 | NRC to Meet with Public March 2 for Input on South Texas Project Nuclear Plant Environmental Review for License Renewal |
02/03/2011 | 11-016 | Licensing Board to Hear Oral Argument March 1 on Davis-Besse Reactor License Renewal Application |
02/03/2011 | 11-015 | Licensing Board to Hear Oral Argument March 3 on North Anna New Nuclear Reactor License Application |
02/01/2011 | 11-014 | NRC Advisory Committee on Reactor Safeguards to Meet Feb. 10-12 in Rockville, Md. |
02/01/2011 | II-11-005 | NRC to Increase Oversight of Robinson Nuclear Plant |
02/01/2011 | 11-013 | Opening Remarks of NRC Chairman Gregory B. Jaczko at Today's Briefing on Digital I&C |
January | ||
Date | Document Number | Description |
1/31/2011 | 11-012 | NRC Unveils First-Ever External Blog to Enhance Dialogue with the Public |
1/28/2011 | 11-011 | NRC Announces Availability of Design Certification Renewal Application for Advanced Boiling Water Reactor |
1/25/2011 | IV-11-006 | NRC to Hold Public Meeting to Discuss PG&E Digital Upgrade Proposal at the Diablo Canyon Nuclear Plant |
01/25/2011 | 11-031 | Opening Remarks of NRC Chairman Gregory B. Jaczko at the Safety Culture Policy Statement Briefing |
1/24/2011 | 11-010 | NRC Determines No Major Environmental Impacts Preclude Licensing Nichols Ranch Uranium Recovery Site in Wyoming |
1/24/2011 | IV-11-005 | NRC Names New Resident Inspector at Arkansas Nuclear One Power Plant |
1/20/2011 | II-11-004 | NRC Schedules Meeting to Discuss Inspection of Oconee Nuclear Plant Issues |
1/13/2011 | 11-009 | NRC Announces Opportunity for Hearing on Application to Renew Operating Licenses for South Texas Project Nuclear Power Plant |
1/13/2011 | 11-008 | NRC Issues Final Safety Evaluation Report for Palo Verde Nuclear Power Plant License Renewal |
1/13/2011 | IV-004 | NRC Hold Public Meeting to Discuss Results of License Renewal Inspection at the Diablo Canyon Nuclear Plant |
1/13/2011 | IV-003 | NRC Names New Resident Inspector at River Bend Nuclear Station |
1/12/2011 | 11-007 | NRC Directs Staff to Resolve Potential Debris Clogging of Emergency Cooling Water Source |
1/11/2011 | 11-006 | NRC Issues Safety Evaluation Report for Diablo Canyon Nuclear Power Plant License Renewal Application |
1/11/2011 | 11-005 | National Academy of Sciences Announces Expert Panel for First Phase of NRC-Sponsored Cancer Risk Study |
1/10/2011 | 11-004 | Registration Opens for NRC Regulatory Information Conference March 8-10 in Rockville, Md. |
1/05/2011 | 11-003 | ASLB to Hold Evidentiary Hearings Beginning Jan. 25 on Areva Application for Uranium Enrichment Plant in Idaho |
1/05/2011 | II-11-003 | NRC Schedules Enforcement Conference in Atlanta with Westinghouse Nuclear Fuel Plant Officials |
1/05/2011 | II-11-002 | NRC Schedules Meeting to Discuss Safety Culture at FPL's Nuclear Plants |
1/04/2011 | II-11-001 | Victor McCree Named Administrator of NRC’s RII Office |
1/03/2011 | IV-11-002 | NRC To Hold Regulatory Conference With Comanche Peak Nuclear Power Plant |
1/03/2011 | 11-002 | NRC Issues Final Safety Evaluation Report For Palo Verde Nuclear Power Plant License Renewal |
1/03/2011 | 11-001 | NRC Approves Use of Advanced Fire Protection Standard at Oconee Nuclear Plant in South Carolina |
1/03/2011 | IV-11-001 | NRC Names New Senior Resident Inspector at Palo Verde Nuclear Power Plant |