Spotlight
News Releases - 2008
`Search News Releases
January • February • March • April • May • June • July• August • September • October • November • December
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
December | ||
---|---|---|
Date | Document Number | Description |
12/30/2008 | II-08-057 | NRC Staff to Meet With USEC to Discuss Performance at Paducah Gaseous Diffusion Plant |
12/30/2008 | II-08-056 | NRC Staff to Meet with TVA to Discuss Inspection of Browns Ferry Nuclear Power Plant |
12/30/2008 | 08-236 | NRC Announces Opportunity to Request Hearing on License Renewal Application for Cooper Nuclear Station |
12/24/2008 | 08-235 | NRC Meeting with Public Jan. 14 in Monroe, Mich., on Scope of Environmental Issues for Fermi New Reactor Application |
12/24/2008 | 08-234 | NRC Announces Availability of License Renewal Application for Palo Verde Nuclear Generating Station |
12/24/2008 | I-08-065 | NRC to Continue Enhanced Oversight of Indian Point in 2009 |
12/23/2008 | 08-233 | NRC Recertifies Two Gaseous Diffusion Plants Operated by United States Enrichment Corporation |
12/22/2008 | 08-232 | NRC Seeks Public Input on Draft Environmental Report for Indian Point Nuclear Plant License Renewal Application |
12/22/2008 | 08-231 | NRC Clarifies Acceptable Process for Evaluating Heavy Load Lifts at Nuclear Power Plants |
12/22/2008 | 08-230 | NRC Accepts Application for New Reactor at Bell Bend |
12/22/2008 | IV-08-044 | NRC to Provide Additional Oversight to San Onofre Nuclear Generating Station |
12/19/2008 | 08-229 | NRC Seeks Public Input on Draft Environmental Report for Three Mile Island Nuclear Plant License Renewal Application |
12/19/2008 | 08-228 | NRC Meeting With Public Jan. 6 on Environmental Scoping for Comanche Peak New Reactor Application |
12/17/2008 | 08-227 | NRC Approves Final Rule Expanding Security Requirements for Nuclear Power Plants |
12/17/2008 | 08-226 | NRC Approves License Renewal for Shearon Harris Nuclear Power Plant for an Additional 20 Years |
12/16/2008 | I-08-062 | MEETING CANCELLED DUE TO INCLEMENT WEATHER - NRC to Discuss Results of License Renewal Inspection for Susquehanna Nuclear Power Plant on Dec. 16 |
12/15/2008 | 08-225 | NRC Accepts Application for New Reactor at Callaway |
12/15/2008 | I-08-064 | NRC Begins Special Inspection at Millstone 3 Nuclear Power Plant |
12/15/2008 | 08-224 | NRC Accepts Application for New Reactor at Nine Mile Point |
12/15/2008 | I-08-063 | New NRC Resident Inspector Assigned to Millstone Station |
12/12/2008 | IV-08-043 | NRC to Hold Public Meeting On Palo Verde Nuclear Generating Station |
12/12/2008 | 08-223 | NRC Staff Recommends Security Over Replacement of Cesium Chloride Radiation Sources |
12/11/2008 | 08-222 | NRC Issues Final Environmental Impact Statement for Vogtle Nuclear Power Plant |
12/10/2008 | I-08-062 | NRC to Discuss Results of License Renewal Inspection for Susquehanna Nuclear Power Plant on Dec. 16 |
12/10/2008 | IV-08-042 | NRC Staff Proposes $3,250 Fine for Security Violations at Glaxosmithkline Biologicals |
12/10/2008 | 08-221 | NRC Accepts Application for New Reactor at River Bend Site |
12/08/2008 | 08-220 | NRC Announces Opportunity to Participate in Hearing on New Reactor Application for Levy County Site |
12/05/2008 | II-08-055 | NRC Staff to Meet With Shaw Areva Mox Services to Discuss Performance at Mixed Oxide Fabrication Facility |
12/03/2008 | II-08-054 | NRC Staff to Meet with TVA Officials to Discuss Construction and Licensing of Watts Bar Nuclear Power Plant Unit 2 |
12/03/2008 | 08-219 | NRC Accepts Application for New Reactors at Comanche Peak Site |
12/02/2008 | 08-218 | NRC to Hold Public Meeting in Idaho Falls to Explain License Review Process for Areva Enrichment Facility |
November | ||
Date | Document Number | Description |
11/25/2008 | 08-217 | NRC’S PAPO Board to Hold Meeting to Discuss Handling of Classified Information in Yucca Mountain Hearings |
11/25/2008 | 08-216 | NRC Accepts Application for New Reactor at Fermi Site |
11/24/2008 | 08-215 | NRC to Hold Public Meeting Dec. 1 to Discuss Reporting Requirements for Nuclear Power Plant Decommissioning Funds |
11/21/2008 | 08-214 | NRC Licensing Board to Webcast Portion of Hearing on Davis-Besse Enforcement Case |
11/20/2008 | 08-213 | NRC Approves License Renewal for Wolf Creek Nuclear Power Plant for an Additional 20 years |
11/19/2008 | 08-212 | NRC Meeting with Public Dec. 4 on Environmental Scoping for Levy County New Reactor Application |
11/18/2008 | 08-211 | NRC Considering Request by Virginia to Become an “Agreement State” |
11/18/2008 | 08-210 | NRC Staff Issues Safety Evaluation for Vogtle Early Site Permit, Limited Work Request Applications |
11/18/2008 | 08-209 | NRC Advisory Committee on Reactor Safeguards to Meet Dec. 4-6 in Rockville, Md. |
11/17/2008 | 08-208 | NRC to Hold Public Meeting Dec. 4 in Rockville, MD., to Discuss Agency’s Internal Safety Culture |
11/17/2008 | 08-207 | NRC Issues FY 2008 Performance and Accountability Report |
11/13/2008 | 08-206 | NRC Publishes Survey Results on Nuclear Accident Response Strategies to Protect the Public |
11/12/2008 | III-08-041 | NRC Issues an Order to Radiography Company for Inadequate Safety Practices |
11/12/2008 | I-08-061 | NRC Sends Special Inspection Team to Beaver Valley Nuclear Plant |
11/12/2008 | IV-08-041 | NRC Issues Confirmatory Action Letter to National Oceanic & Atmospheric Administration Lab in Boulder, Co. |
11/10/2008 | 08-205 | NRC Opens Help Desk to Assist Public with Electronic Filings in Licensing Proceedings |
11/10/2008 | 08-204 | NRC’s Victor McCree Named as One of the Most Influential Black Engineers in 2008 |
11/07/2008 | 08-203 | License Renewal Application for Duane Arnold Nuclear Power Plant Available for Public Inspection |
11/06/2008 | 08-202 | License Renewal Application for Cooper Nuclear Plant Available for Public Inspection |
11/05/2008 | 08-201 | NRC Advisory Committee on Reactor Safeguards to Meet Nov. 6-8 in Rockville, Md. |
11/04/2008 | I-08-060 | NRC to Discuss Results of License Renewal Inspection for Beaver Valley Nuclear Power Plant on Nov. 12 |
11/03/2008 | 08-200 | NRC Workshop Dec. 10-11 Focuses on Overseeing New Reactor Construction |
11/03/2008 | I-08-059 | NRC Assigns New Resident Inspector to Limerick Nuclear Plant |
11/03/2008 | 08-199 | NRC Public Meeting Nov. 18 in St. Francisville, La., to Discuss Review Process for New Reactor Application |
October | ||
Date | Document Number | Description |
10/31/2008 | 08-198 | NRC Accepts Application for New Reactors at Victoria County Site |
10/29/2008 | 08-197 | Bell Bend Application for New Reactor Available on NRC Web Site |
10/29/2008 | 08-196 | River Bend Application for New Reactor Available on NRC Web Site |
10/27/2008 | I-08-058 | NRC Monitoring Alert at Susquehanna 2 Nuclear Plant |
10/23/2008 | 08-195 | Nine NRC Executives Honored with Presidential Awards |
10/21/2008 | II-08-051 | NRC to Present Results of Licensee Performance Review at Areva Commercial Fuel Plant in Richland |
10/21/2008 | IV-08-040 | NRC to Hold Predecisional Enforcement Conference with Sabia, Inc. |
10/21/2008 | I-08-057 | NRC Sends Special Inspection Team to Salem Nuclear Plant in N.J. |
10/21/2008 | 08-193 | Nine Mile Point Application for New Reactor Available on NRC Web Site |
10/20/2008 | 08-192 | Atomic Safety and Licensing Board to Hear Oral Argument Oct. 29 on Prairie Island Nuclear Plant License Renewal |
10/17/2008 | 08-191 | NRC Announces Opportunity to Request Hearing on Yucca Mountain Nuclear Waste Repository Application |
10/16/2008 | 08-190 | NRC Seeks Public Input on Environmental Impact Statement for Kewaunee Nuclear Plant License Renewal Application |
10/15/2008 | III-08-040 | NRC Issues Confirmatory Action Letter to the Department of Veterans Affairs |
10/14/2008 | I-08-056 | NRC Seeks Public Input on Draft Environmental Report for Beaver Valley License Renewal; Meetings Oct. 30 |
10/14/2008 | 08-189 | NRC Issues Advanced Reactor Design Policy |
10/10/2008 | 08-188 | Comanche Peak Application for New Reactors Available on NRC Web Site |
10/10/2008 | 08-187 | Fermi Application for New Reactor Available on NRC Web Site |
10/10/2008 | 08-186 | NRC Announces Opportunity to Participate in Hearing on New Reactor Application for Summer Site |
10/08/2008 | 08-185 | NRC Seeks Public Comment on Proposed Revisions to its Waste Confidence Decision |
10/07/2008 | I-08-055 | NRC to Sponsor Public Meeting on Oct. 14 In Brattleboro, Vt., Regarding Vermont Yankee Nuclear Power Plant Cooling Towers |
10/07/2008 | 08-184 | NRC Advisory Committee on Medical Uses of Isotopes to Meet Oct. 27-28 |
10/06/2008 | 08-183 | NRC Accepts Application for New Reactors at Levy County Site in Florida |
10/03/2008 | 08-182 | NRC Signs Arrangements at International Atomic Energy Agency |
10/01/2008 | 08-181 | NRC Announces New Listserv for Operating Reactors Correspondence |
10/01/2008 | 08-180 | Hispanic Business Magazine Names NRC Regional Administrator, Luis Reyes, to its 100 Most Influential Hispanics List for 2008 |
September | ||
Date | Document Number | Description |
09/29/2008 | 08-179 | NRC Assumes Regulatory Authority Over Certain Radioactive Materials in Five States and U.S. Territories |
09/26/2008 | I-08-054 | NRC Issues Report on Vermont Yankee Engineering Inspection |
09/26/2008 | 08-178 | NRC Announces Opportunity to Participate in Hearing on New Reactor Application for Calvert Cliffs Site |
09/24/2008 | III-08-039 | NRC Begins Special Inspection at the DC Cook Nuclear Plant |
09/24/2008 | II-08-050 | NRC Schedules Public Meetings to Discuss Louisiana Energy Services Performance |
09/24/2008 | II-08-049 | NRC Schedules Meeting In Lynchburg to Discuss BWXT Nuclear Fuel Plant Performance |
09/24/2008 | II-08-048 | NRC Schedules Two Public Meetings to Discuss NFS Nuclear Fuel Plant Performance |
09/24/2008 | III-08-038 | NRC Names New Resident Inspector at Palisades Nuclear Power Plant |
09/23/2008 | 08-177 | NRC, Army Corps of Engineers Update Environmental Review Cooperation |
09/22/2008 | III-08-037 | NRC Names New Resident Inspector at Quad Cities Nuclear Power Plant |
09/22/2008 | 08-176 | Atomic Safety and Licensing Board to Hear Oral Argument Sept. 30 Regarding Crow Butte License Renewal |
09/19/2008 | 08-175 | Callaway Application for New Reactor Available on NRC Website |
09/19/2008 | I-08-053 | NRC to Update Public on Sept. 30 Regarding Review Of Decommissioning Plan for Newfield, N.J., Site |
09/19/2008 | 08-174 | NRC Issues Supplemental Safety Evaluation for Oyster Creek License Renewal |
09/19/2008 | III-08-036 | NRC Begins Special Inspection at the Monticello Nuclear Plant Due to Equipment Problems |
09/18/2008 | IV-08-039 | NRC to Hold Public Meeting on Palo Verde Nuclear Generating Station |
09/17/2008 | III-08-035 | NRC Monitoring Unusual Event at Monticello Nuclear Power Plant |
09/16/2008 | 08-173 | NRC to Hold Public Meeting Sept. 23 in Nye County, Nev., to Discuss Review Process for Yucca Mountain Application |
09/16/2008 | 08-172 | NRC Announces Opportunity to Participate in Hearing on New Reactor Application for Vogtle Site |
09/16/2008 | 08-171 | Victoria County Application for New Reactors Available on NRC Website |
09/16/2008 | IV-08-038 | NRC to Hold Public Meeting on San Onofre Nuclear Generating Station Issues |
09/16/2008 | I-08-052 | NRC Proposes $6,500 Fine for Buffalo, N.Y., Firm for Failure to Adhere to Requirements for Use of Radioactive Materials |
09/16/2008 | 08-170 | NRC Advisory Committee on Reactor Safeguards to Meet Oct. 2-4 in Rockville, Md. |
09/15/2008 | 08-169 | NRC Encourages Public to Attend Meeting on Use of Radioactive Cesium-137 Chloride Sources |
09/15/2008 | 08-168 | NRC Seeks Public Comment on Proposed Enforcement Policy Revisions |
09/15/2008 | II-08-047 | NRC Schedules Regulatory Conference with Duke Energy to Discuss McGuire Nuclear Plant |
09/15/2008 | II-08-046 | NRC Names New Senior Resident Inspector at Sequoyah Nuclear Plant Near Chattanooga |
09/12/2008 | IV-08-037 | NRC Proposes $3,250 Fine for Alaskan Company, R&M Engineering - Ketchikan, Inc |
09/12/2008 | IV-08-036 | NRC Monitoring Approach of Hurricane Ike |
09/11/2008 | I-08-051 | ASLB Panel to Hear Oral Arguments on Sept. 18 in Toms River, N.J., Regarding Oyster Creek License Renewal |
09/11/2008 | III-08-034 | NRC Proposes $3,250 Fine Against a Missouri University for Violations of NRC Regulations |
09/10/2008 | II-08-046 | NRC Names New Senior Resident Inspector at Sequoyah Nuclear Plant Near Chattanooga |
09/10/2008 | I-08-050 | NRC Assigns New Resident Inspector to Hope Creek Nuclear Plant |
09/10/2008 | 08-167 | NRC Announces Appointment of New Members to the Advisory Committee on Medical Uses of Isotopes |
09/09/2008 | 08-166 | NRC Renews Operating License of FitzPatrick Nuclear Plant for an Additional 20 Years |
09/09/2008 | III-08-033 | NRC Begins Special Inspection of the Department of Veterans Affairs Due to Multiple Medical Events |
09/09/2008 | 08-165 | NRC Permanently Bars Contractor From Many Activities, Restricts Other NRC-Licensed Functions |
09/08/2008 | 08-164 | NRC Dockets Yucca Mountain Application, Adopts DOE’s Environmental Impact Statement |
09/05/2008 | II-08-045 | NRC to Send Special Inspection Team to Brunswick Nuclear Plant to Assess and Inspect Emergency Diesel Generator Issue |
09/05/2008 | II-08-044 | NRC to Hold Two Public Meetings Sept. 10 in Piketon, Ohio |
09/05/2008 | II-08-043 | NRC Announces New Region II Public Affairs Officer |
09/04/2008 | 08-163 | NRC Issues Mid-Cycle Assessments for Nation's Nuclear Plants |
09/03/2008 | 08-162 | NRC to Co-Sponsor Workshop for Minority Serving Institutions Sept. 22-25 in Dallas, Texas |
09/02/2008 | III-08-032 | NRC Proposes $3,250 Fine Against Indiana Company for Failing to Secure Nuclear Gauges |
09/02/2008 | 08-161 | License Renewal Application for Kewaunee Nuclear Plant Available for Public Inspection |
09/02/2008 | 08-160 | NRC Extends Review Schedule for Indian Point License Renewal Application |
August | ||
Date | Document Number | Description |
08/31/2008 | 08-159 | NRC Monitoring Approach of Hurricane Gustav; Waterford Plant to Shut Down |
08/27/2008 | I-08-049 | NRC to Monitor Performance of New Notification System for Indian Point Nuclear Power Plant |
08/21/2008 | IV-08-035 | NRC Proposes $20,800 Fine Against Alaska Industrial X-Ray, Inc., Issues Order Modifying License |
08/20/2008 | 08-158 | NRC Licensing Board to Webcast Sept. 3 Session on Lee Reactor Application as Part of Pilot Program |
08/20/2008 | 08-157 | NRC to Hold Public Meeting at its Headquarters to Solicit Ways to Increase Public Access to Security Information |
08/19/2008 | 08-156 | NRC Reports Lowest Average Occupational Dose Ever for Nuclear Power Plant Workers in 2007 |
08/19/2008 | 08-155 | NRC Finds No Significant Environmental Impacts From Extended Operation of Harris Nuclear Plant |
08/19/2008 | 08-154 | NRC Advisory Committee on Reactor Safeguards to Meet Sept. 4-6 in Rockville, Md. |
08/19/2008 | 08-153 | NRC Seeking Roundtable Participants for September Public Meeting on the Use of Radioactive Cesium-137 Chloride Sources |
08/18/2008 | 08-152 | NRC Issues Final Environmental Impact Statement for Vogtle Early Site Permit |
08/15/2008 | 08-151 | Levy County Application for New Reactors Available on NRC Website |
08/15/2008 | 08-150 | NRC, DOE Give Congress Licensing Strategy for Next-Generation Nuclear Plant |
08/14/2008 | II-08-042 | NRC Staff Proposes $16,250 Fine Against Global Nuclear Fuels for Violations at Wilmington Nuclear Fuel Plant |
08/12/2008 | 08-149 | NRC Approves Power Uprate for Millstone Nuclear Power Plant |
08/12/2008 | 08-148 | NRC Releases Review of Doe’s Hanford Waste Treatment Plant |
08/11/2008 | 08-147 | NRC Issues Supplemental Proposed Rule Improving Reactor Vessel Requirements |
08/08/2008 | III-08-031 | NRC Begins Special Inspection at the Palisades Nuclear Power Plant Due to Operational and Equipment Problems |
08/06/2008 | 08-146 | NRC Accepts Application for New Reactors at Summer |
08/05/2008 | III-08-030 | NRC Begins Special Inspection at Prairie Island Nuclear Plant Due to Reactor Trip |
08/05/2008 | 08-145 | NRC Meeting Aug. 21 in Oswego, N.Y., to Discuss Review Process for Expected New Reactor Application |
08/05/2008 | 08-144 | NRC Meeting Aug. 20 in Monroe, Mich., to Discuss Review Process for Expected New Reactor Application |
08/05/2008 | 08-143 | NRC Meeting Aug. 19 in Bloomsburg, Pa., to Discuss Review Process for Expected New Reactor Application |
08/05/2008 | 08-142 | Government Prevails in Conflict-of-Interest Case Against Science Applications International Corporation |
08/04/2008 | IV-08-034 | NRC Finalizes "White" Finding for Cooper Nuclear Plant |
08/01/2008 | 08-141 | NRC Awards Nuclear Education Grants |
08/01/2008 | I-08-048 | NRC, Entergy to Discuss Work Toward Completion, Operability of New Siren System for Indian Point Nuclear Plant on Aug. 8 |
July | ||
Date | Document Number | Description |
07/31/2008 | I-08-047 | NRC Proposes $3,250 Fine Against New Jersey Hospital for Violations of NRC Requirements |
07/30/2008 | IV-08-033 | NRC Conducting Special Inspection at San Onofre Nuclear Plant |
07/29/2008 | 08-140 | NRC Solicits Public Input into How it Can Increase Public Access to Security Information |
07/29/2008 | III-08-029 | NRC Proposes $6,500 Fine Against Missouri Company for Violations of NRC Requirements |
07/28/2008 | 08-139 | NRC Seeks Public Comment on Draft Generic Environmental Study of In-Situ Leach Uranium Recovery Operations |
07/28/2008 | 08-138 | NRC Staff Approves Transfer of Entergy Operating Licenses to New Corporate Structure |
07/25/2008 | II-08-041 | NRC Names New Senior Resident Inspector at BWXT Fuel Plant in Lynchburg |
07/25/2008 | 08-137 | NRC Seeks Public Input on Environmental Impact Statement for Prairie Island License Renewal Application |
07/23/2008 | 08-136 | NRC to Hold Three Public Meetings to Solicit Public Input on Ways to Increase Public Access to Security Information |
07/22/2008 | 08-135 | NRC Licensing Board to Webcast July 30 Session on Bellefonte Reactor Application as Part of Pilot Program |
07/22/2008 | 08-134 | NRC Names New Member to Advisory Committee on Reactor Safeguards |
07/22/2008 | 08-133 | NRC Proposes $9,600 Fine Against Louisiana Company for Violation Requirements for Shipping Radioactive Materials |
07/21/2008 | 08-132 | NRC Meeting Aug. 7 in Victoria, TX, to Discuss Review Process for Expected New Reactor Application |
07/21/2008 | II-08-040 | NRC Conducting Special Inspection at Hatch Nuclear Plant |
07/17/2008 | I-08-046 | NRC Proposes $6,500 Fine Against Pennsylvania Company for Violations Of NRC Requirements |
07/15/2008 | 08-131 | Public Meeting on Transition of Operating Nuclear Plants to a Risk-Informed Fire Protection Program |
07/14/2008 | III-08-028 | NRC to Discuss 2007 Performance Assessment for Point Beach Nuclear Plant |
07/13/2008 | I-08-045 | NRC Sends Specialists to Vermont Yankee to Review Cooling Tower Leak |
07/11/2008 | 08-130 | NRC Extends Construction Permit for Watts Bar Unit 2 |
07/11/2008 | 08-129 | NRC Publishes Annual Security Inspection Report to Congress |
07/11/2008 | III-08-027 | NRC Names New Resident Inspector at D.C. Cook Nuclear Power Plant |
07/10/2008 | 08-128 | NRC Announces Opportunity to Request Hearing on License Application for Uranium Recovery Operation in Wyoming |
07/10/2008 | IV-08-032 | NRC to Discuss 2007 Performance Assessment for San Onofre Nuclear Generating Station |
07/09/2008 | I-08-044 | ASLB Hearing on Vermont Yankee License Renewal Application Scheduled for Week of July 21st in Newfane, Vt. |
07/09/2008 | 08-127 | NRC Reaches Settlement with Chevron Environmental Management Company in Discrimination Case |
07/08/2008 | II-08-039 | NRC to Hold Public Meeting With Areva in Lynchburg July 24 to Review Performance of Licensed Activities |
07/08/2008 | 08-126 | NRC to Hold Public Meeting July 17 in Wilmington, N.C., to Discuss Licensing Process for GE-Hitachi Enrichment Plant |
07/08/2008 | IV-08-031 | NRC to Discuss 2007 Performance Assessment for Waterford 3 Nuclear Plant |
07/07/2008 | II-08-038 | NRC Issues Confirmatory Order to Former Hatch Nuclear Plant Contract Employee |
07/07/2008 | I-08-043 | NRC Assigns New Senior Resident Inspector to Indian Point 2 Nuclear Plant |
07/03/2008 | II-08-037 | NRC Staff to Hold Public Meeting to Discuss Inspection Findings at Farley |
07/03/2008 | 08-125 | NRC Meeting July 17 in Waynesboro, Ga., to Discuss Review Process for Vogtle New Reactor Application |
07/02/2008 | IV-08-030 | NRC Sends Special Inspection Team to NIST Lab in Colorado Following Report of Possible Plutonium Contamination |
07/02/2008 | 08-124 | NRC Approves Power Uprate for Cooper Nuclear Power Plant |
07/01/2008 | II-08-036 | NRC Staff to Hold Predecisional Enforcement Conference in Atlanta with Westinghouse Nuclear Fuel Plant Officials |
07/01/2008 | 08-123 | NRC Approves Power Uprate for Davis-Besse Nuclear Power Plant |
June | ||
Date | Document Number | Description |
06/27/2008 | 08-122 | NRC Approves Power Uprate for Comanche Peak Nuclear Power Plant |
06/26/2008 | 08-121 | NRC Announces Opportunity to Participate in Hearing on New Reactor Application for Grand Gulf Site |
06/26/2008 | 08-120 | Summer Application For New Reactors Available on NRC’s Website |
06/26/2008 | 08-119 | NRC and Prairie Island Indian Community Sign First-of-a Kind Memorandum of Understanding |
06/24/2008 | 08-118 | NRC Advisory Committee on Reactor Safeguards to Meet July 9-11 in Rockville, MD. |
06/23/2008 | I-08-042 | NRC to Discuss Indian Point Nuclear Plant Annual Assessment at Public Meeting Set for July 2, in Cortlandt Manor, N.Y. |
06/23/2008 | 08-117 | NRC Meeting July 9 in Fulton, Mo., to Discuss Review Process for Expected New Reactor Application |
06/18/2008 | IV-08-029 | NRC Names New Senior Resident Inspector at Comanche Peak Nuclear Plant |
06/17/2008 | III-08-026 | NRC to Discuss 2007 Performance Assessment for Braidwood Nuclear Power Plant |
06/16/2008 | III-08-025 | NRC Names New Resident Inspector Team at Braidwood Nuclear Power Plant |
06/16/2008 | 08-116 | DOE to “Walk Through” its Yucca Mountain Application in Public Meeting June 19-20 in Rockville, Md. |
06/16/2008 | II-08-035 | NRC Issues Confirmatory Order to FPL Following Alternative Dispute Resolution |
06/16/2008 | IV-08-028 | NRC to Provide Additional Oversight to Cooper Nuclear Station |
06/12/2008 | III-08-024 | NRC Monitoring Unusual Event at Duane Arnold Nuclear Plant |
06/12/2008 | 08-115 | NRC Sends Inspector to Kansas State University After Tornado Damages Research Reactor Building |
06/11/2008 | IV-08-027 | NRC Dispatches Inspector to National Institute of Standards & Technology Lab in Colorado Following Contamination Event |
06/11/2008 | IV-08-026 | NRC to Hold Public Meeting on Palo Verde Nuclear Generating Station |
06/11/2008 | I-08-041 | New NRC Resident Inspector Assigned to Pilgrim Nuclear Plant |
06/11/2008 | I-08-040 | NRC to Discuss Preliminary Results of Inspection for Indian Point License Renewal Application on June 18 |
06/09/2008 | 08-114 | NRC to Hold Public Meeting June 18 to Discuss Proposed License Transfer and Decommissioning of Zion Plant |
06/09/2008 | 08-113 | NRC Accepts Application for New Reactors at Vogtle |
06/06/2008 | I-08-039 | NRC Proposes $3,250 Civil Penalty for Chesapeake, Va., Company For Storing Nuclear Gauges at Unauthorized Location |
06/06/2008 | III-08-023 | NRC Proposes $3,250 Civil Penalty Against Kansas City, MO., Medical Center for Violations of Agency Requirements |
06/06/2008 | I-08-038 | New NRC Inspector Assigned to Seabrook Station |
06/06/2008 | 08-112 | NRC Issues Final Licensing, Inspection and Annual Fees Rule for Fiscal Year 2008 |
06/05/2008 | IV-08-025 | NRC to Hold Two Public Meetings About Diablo Canyon Nuclear Plant on July 2 |
06/05/2008 | 08-111 | NRC to Host Third Annual Nuclear Fuel Cycle Information Exchange June 17–19 in Rockville, Maryland |
06/04/2008 | 08-110 | NRC Accepts Application for New Reactor At Calvert Cliffs |
06/04/2008 | IV-08-024 | NRC Names New Senior Resident Inspector at San Onofre Nuclear Generating Station |
06/04/2008 | 08-109 | NRC to Hold Public Meeting June 10 in Piketon, Ohio, to Discuss Recertification of USEC Enrichment Plant |
06/04/2008 | 08-108 | NRC Names Charles Brown to its Advisory Committee on Reactor Safeguards |
06/04/2008 | 08-107 | NRC Announces Opportunity to Participate in Hearing on New Reactor Application for Shearon Harris |
06/03/2008 | I-08-037 | NRC to Discuss Peach Bottom Nuclear Plant Annual Assessment at Public Meeting Set for June 9 in Delta, Pa. |
06/03/2008 | 08-106 | NRC Receives DOE’s License Application to Construct High-Level Nuclear Waste Repository at Yucca Mountain |
06/02/2008 | 08-105 | NRC Issues Final Environmental Impact Statement on Sequoyah Fuels Corp. Remediation Plan |
06/02/2008 |
II-08-034 | NRC Staff to Meet with Vogtle Nuclear Plant Officials to Discuss Nuclear Plant License Renewal Inspection |
May | ||
Date | Document Number | Description |
05/30/2008 |
08-104 | NRC Meeting with Public June 19 on Environmental Scoping for Grand Gulf New Reactor Application |
05/29/2008 | 08-103 | NRC Updates Guidance to Licensees for Extended Storage of Low-Level Radioactive Waste |
05/28/2008 | I-08-036 | NRC Proposes $3,250 Civil Penalty for Chesapeake, Va., Firm for Violations Associated with Temporary Loss of Nuclear Gauge |
05/27/2008 | I-08-035 | NRC Monitoring Unusual Event at Millstone 2 Nuclear Plant |
05/27/2008 | 08-102 | NRC Meeting with Public June 10 on Environmental Scoping for Harris New Reactor Application |
05/27/2008 | 08-101 | NRC Meeting June 11 in Dana Point, Calif., to Discuss Proposed Partial Release of San Onofre Site |
05/27/2008 | 08-100 | NRC Meeting June 12 in Glen Rose, Texas, to Discuss Review Process for Expected New Reactor Application |
05/24/2008 | I-08-035 | NRC Monitoring Unusual Event at Millstone 2 Nuclear Plant |
05/23/2008 | 08-099 | NRC Advisory Committee on Reactor Safeguards to Meet June 4-6 in Rockville, MD |
05/20/2008 | IV-08-023 | NRC to Discuss 2007 Performance Assessment for Cooper Nuclear Plant |
05/20/2008 | IV-08-022 | NRC to Discuss 2007 Performance Assessment for Columbia Generating Station |
05/20/2008 | IV-08-021 | NRC to Discuss 2007 Performance Assessment for Comanche Peak Nuclear Plant |
05/20/2008 | 08-098 | NRC Receives Award for Excellence and Recognition for Performance and Accountability Reporting |
05/19/2008 | III-08-022 | NRC to Discuss 2007 Performance Assessment for Quad Cities Unit 1 and 2 Nuclear Power Plant |
05/19/2008 | IV-08-020 | NRC Proposes $3,000 Fine for Hevly Technical Services, Inc. |
05/16/2008 | II-08-033 | NRC to Discuss an Apparent Violation by Areva in Lynchburg, Va. |
05/16/2008 | 08-097 | NRC Issues New Guidance on Release of Thyroid Patients Administered Radioactive Iodine |
05/16/2008 | 08-096 | NRC Finds No Significant Environmental Impacts from Extended Operation of Wolf Creek Nuclear Plant |
05/16/2008 | 08-095 | NRC Meeting June 5 in Crystal River, Fla., to Discuss Review Process for Expected New Reactor Application |
05/16/2008 | IV-08-019 | NRC to Discuss 2007 Performance Assessment for Callaway Nuclear Plant |
05/15/2008 | III-08-021 | NRC Proposed $3,250 Fine Against Michigan Hospital for Failure to Properly Secure Radioactive Material |
05/15/2008 | II-08-032 | NRC Issues Draft Environmental Impact Statement for Vogtle Nuclear Plant License Renewal; Public Meeting June 3 |
05/15/2008 | III-08-020 | NRC to Discuss Apparent Violations at American Radiolabeled Chemicals |
05/15/2008 | I-08-034 | New NRC Senior Resident Inspector Assigned to Hope Creek Nuclear Plant |
05/14/2008 | I-08-033 | NRC Seeks Input on Draft Environmental Report for Susquehanna Nuclear Plant License Renewal Application; Meetings on May 28 |
05/14/2008 | 08-094 | NRC Approves Power Uprate for Hope Creek Nuclear Plant |
05/13/2008 | IV-08-018 | NRC to Discuss 2007 Performance Assessment for Wolf Creek Nuclear Plant |
05/13/2008 | I-08-032 | NRC to Discuss Inspection of Company’s Assessment of Groundwater Contamination at Indian Point Plant on May 20 |
05/13/2008 | II-08-031 | NRC to Discuss 2007 Performance of Harris Nuclear Plant May 20 |
05/13/2008 | 08-093 | License Renewal Application for Prairie Island Nuclear Plant Available for Public Inspection |
05/13/2008 | II-08-030 | NRC to Discuss Apparent Violations at Global Nuclear Fuels |
05/13/2008 | II-08-029 | NRC to Discuss 2007 Performance of Farley Nuclear Plant |
05/12/2008 | 08-092 | NRC Invites Comment on Advanced Reactor Design Policy |
05/12/2008 | 08-091 | NRC Releases Event Reports for Nuclear Fuel Services and BWXT Facilities for 2004 – 2007 |
05/09/2008 | III-08-019 | NRC to Discuss 2007 Performance Assessment for Clinton Nuclear Power Plant |
05/09/2008 | IV-08-017 | NRC Names New Resident Inspector at River Bend Station |
05/09/2008 | 08-090 | Nuclear Regulatory Commission Honors Employees on June 2 in Rockville, Md |
05/08/2008 | I-08-031 | NRC to Discuss Oyster Creek Nuclear Plant Annual Assessment at Public Meeting Set for May 15 in Toms River, N.J. |
05/06/2008 | 08-089 | NRC to Hold Public Meeting May 12 in Paducah to Discuss Recertification of USEC Enrichment Plant |
05/06/2008 | I-08-030 | NRC to Discuss Vermont Yankee Nuclear Plant Annual Assessment at Public Meeting Set for May 12 in Brattleboro, Vt. |
05/05/2008 | III-08-018 | NRC to Discuss 2007 Performance Assessment for Palisades Nuclear Power Plant |
05/02/2008 | III-08-017 | NRC to Discuss 2007 Performance Assessment for Davis-Besse Nuclear Power Plant |
05/01/2008 | I-08-029 | New NRC Resident Inspector Assigned to Oyster Creek Nuclear Plant |
05/01/2008 | 08-088 | NRC Seeks Public Comment on Fatigue Analysis of Nuclear Power Plant Components |
05/01/2008 | II-08-028 | NRC to Discuss 2007 Performance of Robinson Nuclear Plant |
April | ||
Date | Document Number | Description |
04/30/2008 | II-08-027 | NRC Conducting Special Inspection at Oconee Nuclear Station |
04/30/2008 | II-08-026 | NRC Conducting Special Inspection at Browns Ferry Nuclear Power Plant |
04/29/2008 | 08-087 | NRC Advisory Committee on Nuclear Waste and Materials to Meet May 20-22 In Rockville, Md. |
04/28/2008 | 08-086 | NRC Advisory Committee on Reactor Safeguards to Meet May 8-10 in Rockville, Md. |
04/28/2008 | 08-085 | International Nuclear Regulators Association Encourages Nuclear Safety Enhancements Worldwide |
04/28/2008 | IV-08-016 | NRC to Hold Regulatory Conference with Nebraska Public Power District on Cooper Nuclear Station |
04/28/2008 | IV-08-015 | NRC to Discuss 2007 Performance Assessment for South Texas Project Nuclear Plant |
04/28/2008 | 08-084 | NRC Announces Opportunity to Participate in Hearing on New Reactor Application for Lee Site |
04/24/2008 | II-08-025 | NRC Schedules Public Meeting to Discuss Corrective Actions and 2007 Regulatory Performance at Brunswick Nuclear Plant |
04/24/2008 | III-08-016 | NRC to Discuss 2007 Performance Assessment for Dresden Nuclear Power Plant Unit 2 And 3 |
04/24/2008 | I-08-028 | NRfC Annual Assessment for Salem, Hope Creek Nuclear Plants to be Discussed at Public Meeting on April 30 in Swedesboro, N.J. |
04/22/2008 | 08-083 | Licensing Board Adds Prehearing Conference April 28 on Vogtle Site Permit, Extends Pre-Registrtaion |
04/22/2008 | 08-082 | ASLB to Hold Public Meeting May 14 in Las Vegas to Discuss Formats for Contentions in High-Level Waste Adjudication |
04/22/2008 | IV-08-014 | NRC Names New Resident Inspector at San Onofre Nuclear Generating Station |
04/22/2008 | 08-081 | NRC Announces Additional Management Changes; Agency Strengthened for Coming Challenges |
04/22/2008 | IV-08-013 | NRC to Discuss 2007 Performance Assessment for River Bend Station |
04/18/2008 | II-08-024 | NRC to Discuss 2007 Performance Assessment of Vogtle Nuclear Power Plant |
04/18/2008 | III-08-015 | NRC to Discuss 2007 Performance Assessment for Byron Nuclear Power Plant |
04/18/2008 | 08-080 | NRC Accepts Application for New Reactor at Grand Gulf |
04/18/2008 | 08-079 | Complete Calvert Cliffs Application for New Reactor Available on NRC Website |
04/18/2008 | 08-078 | NRC Dockets Application for New Reactors at Harris Site in North Carolina |
04/16/2008 | IV-08-012 | NRC to Discuss 2007 Performance Assessment for Arkansas Nuclear One |
04/16/2008 | I-08-027 | NRC to Discuss Annual Assessment for Nine Mile Point Plant at Two Public Meetings Set for April 23 in Fulton, N.Y. |
04/16/2008 | 08-077 | NRC Updates Policy on Conducting New Reactor Licensing Hearings |
04/15/2008 | 08-076 | Vogtle Application for New Reactors Available on NRC Website |
04/15/2008 | I-08-026 | NRC Seeks Public Input on Environmental Impact Statement for Three Mile Island 1 License Renewal Application |
04/15/2008 | 08-075 | Deadline Extended Until April 23 to Pre-Register for Public Comment Sessions on Vogtle Early Site Permit |
04/11/2008 | III-08-014 | NRC to Discuss 2007 Performance Assessment for D.C. Cook Nuclear Power Plant |
04/11/2008 | I-08-025 | NRC to Discuss Annual Assessment for Millstone Nuclear Plant at Two Public Meetings Set for April 17 In Waterford, Conn. |
04/11/2008 | I-08-024 | NRC to Discuss Apparent Violations with Chesapeake, VA., Company |
04/10/2008 | II-08-023 | NRC to Discuss Performance of McGuire Nuclear Station |
04/10/2008 | II-08-022 | NRC to Discuss 2007 Performance of Catawba Nuclear Station |
04/10/2008 | 08-074 | NRC Chairman Announces Senior Management Changes |
04/09/2008 | II-08-021 | NRC Proposes $130,000 Civil Penalty Against Florida Power & Light for Security Violations at Turkey Point Nuclear Power Plant |
04/09/2008 | IV-08-011 | NRC to Discuss 2007 Performance Assessment for Grand Gulf Nuclear Power Plant April 16 |
04/09/2008 | I-08-023 | NRC to Discuss Results of Safety Conscious Work Environment Inspection at Peach Bottom |
04/09/2008 | I-08-022 | New NRC Resident Inspector Assigned to Millstone Nuclear Plant |
04/09/2008 | II-08-020 | NRC to Discuss 2007 Performance of Browns Ferry Nuclear Power Plant |
04/09/2008 | II-08-019 | NRC to Discuss 2007 Performance of Surry Nuclear Power Plant |
04/08/2008 | I-08-021 | NRC to Discuss Annual Assessment for Susquehanna Nuclear Plant at Public Meeting Scheduled for April 16 in Salem Township, Pa. |
04/08/2003 | 08-073 | NRC Proposes Expansion of National Source Tracking System |
04/08/2008 | 08-072 | NRC Reminds New Reactor Applicants and Existing Plants of Need to Guard Against Counterfeit Parts |
04/07/2008 | III-08-013 | NRC to Discuss 2007 Performance Assessment for Perry Nuclear Power Plant |
04/07/2008 | III-08-012 | NRC Finds Problem with Service Water Piping at the Byron Nuclear Station to be of Low to Moderate Safety Significance |
04/07/2008 | I-08-020 | NRC Proposes $6,500 Civil Penalty for Nuclear Medicine Company for Violations at Sites in New Jersey and Pennsylvania |
04/07/2008 | I-08-019 | NRC Monitoring Unusual Event at Millstone 2 Nuclear Plant |
04/03/2008 | III-08-011 | NRC to Discuss 2007 Performance Assessment for Fermi Nuclear Power Plant Unit 2 |
04/03/2008 | I-08-018 | NRC to Discuss Annual Assessment for Limerick Nuclear Plant at Public Meeting Scheduled for April 10 in Royersford, Pa. |
04/03/2008 | 08-071 | Correction: NRC Accepting Environmental Review Comments for Calvert Cliffs New Reactor Application Until April 14 |
04/02/2008 | IV-08-010 | NRC to Discuss 2007 Performance Assessment for Fort Calhoun Station Nuclear Plant April 10 |
04/01/2008 | III-08-010 | NRC To Discuss 2007 Performance Assessment For Duane Arnold Nuclear Power Plant |
04/01/2008 | II-08-018 | NRC to Discuss 2007 Performance of Turkey Point Nuclear Power Plant |
04/01/2008 | II-08-017 | NRC to Discuss 2007 Performance of Oconee Nuclear Power Plant |
04/01/2008 | II-08-016 | NRC to Discuss 2007 Performance of Hatch Nuclear Power Plant |
04/01/2008 | II-08-015 | NRC to Discuss 2007 Performance of Sequoyah Nuclear Power Plant |
04/01/2008 | II-08-014 | NRC to Discuss 2007 Performance of Crystal River Nuclear Power Plant |
04/01/2008 | II-08-013 | NRC to Discuss 2007 Performance of Watts Bar Nuclear Power Plant |
04/01/2008 | I-08-017 | NRC to Discuss Calvert Cliffs Nuclear Plant Annual Assessment at Public Meeting Scheduled for April 8 in Prince Frederick, Md. |
March | ||
Date | Document Number | Description |
03/31/2008 | 08-070 | NRC Publishes Final Rule Enhancing Fitness-for-Duty Requirements |
03/31/2008 | 08-069 | NRC Completes Pennsylvania Agreement to Regulate Certain Radioactive Materials |
03/28/2008 | I-08-016 | NRC to Discuss Annual Assessment for Fitzpatrick Nuclear Plant at Public Meeting Scheduled for April 3 in Fulton, N.Y. |
03/28/2008 | 08-068 | NRC Invites Nominations for the Advisory Committee on Reactor Safeguards |
03/28/2008 | 08-067 | Commissioner Kristine L. Svinicki Takes Oath of Office at NRC |
03/27/2008 | III-08-009 | NRC to Discuss 2007 Performance Assessment for Prairie Island Nuclear Power Plant |
03/27/2008 | III-08-008 | NRC to Discuss 2007 Performance Assessment for Lasalle Nuclear Power Plant |
03/27/2008 | II-08-012 | NRC to Discuss 2007 Performance of Summer Nuclear Power Plant |
03/27/2008 | I-08-015 | NRC to Discuss Three Mile Island 1 Nuclear Plant Assessment at Public Meeting Scheduled for April 3 in Middletown, Pa. |
03/26/2008 | III-08-007 | NRC Responds to Unusual Event at the Byron Nuclear Plant |
03/25/2008 | 08-066 | NRC Adds Sequoyah Plant to Initial Scope of State-of-the-Art Reactor Consequence Analysis |
03/25/2008 | I-08-014 | Hearing Regarding Pilgrim Plant License Renewal Application Scheduled for April 10 In Plymouth, Mass. |
03/25/2008 | III-08-006 | NRC to Discuss 2007 Performance Assessment for Kewaunee Nuclear Power Plant |
03/25/2008 | 08-065 | Licensing Board to Hear Public Comments April 27-28 in Vogtle Early Site Permit Application Proceeding |
03/25/2008 | 08-064 | NRC Advisory Committee on Medical Uses of Isotopes to Meet April 28-29 |
03/25/2008 | 08-063 | NRC Advisory Committee on Nuclear Waste and Materials to Meet in Rockville, Md., April 8-10 |
03/24/2008 | II-08-011 | NRC to Discuss 2007 Performance at St. Lucie Nuclear Power Plant |
03/21/2008 | I-08-013 | NRC to Discuss Pilgrim Nuclear Plant Annual Assessment at Public Meeting Scheduled for March 26 in Plymouth, Mass. |
03/21/2008 | II-08-010 | NRC Schedules Public Meeting on April 2 in Erwin to Discuss Environmental Impact of Uranium Disposal Program |
03/21/2008 | III-08-005 | NRC to Discuss 2007 Performance Assessment for Monticello Nuclear Power Plant |
03/21/2008 | I-08-012 | NRC to Discuss Seabrook Nuclear Plant Annual Assessment at Public Meeting Scheduled for March 25 in Seabrook, N.H. |
03/20/2008 | 08-062 | NRC Endorses Industry Revised Guidance on Conducting Hostile Action-Based Emergency Drills |
03/20/2008 | I-08-011 | NRC to Discuss Beaver Valley Nuclear Plant Annual Assessment at Public Meeting Scheduled for March 25 in Midland, Pa. |
03/20/2008 | 08-061 | NRC Meeting with Public April 16 on Environmental Scoping for North Anna New Reactor Application |
03/20/2008 | 08-060 | NRC Meeting with Public May 1 on Environmental Scoping for Lee New Reactor Application |
03/19/2008 | II-08-009 | NRC to Discuss 2007 Performance of North Anna Nuclear Power Station |
03/19/2008 | I-08-010 | NRC to Discuss Annual Assessment for Ginna Nuclear Power Plant at Public Meeting Scheduled for March 25 in Ontario, N.Y. |
03/18/2008 | I-08-009 | New NRC Senior Resident Inspector Assigned to Limerick Nuclear Power Plant |
03/18/2008 | 08-059 | Independent External Review Panel Recommends Changes to NRC’s Materials Licensing Process |
03/17/2008 | 08-058 | NRC Affirms Final Rule Amending Designation and Handling of Safeguards Information |
03/17/2008 | IV-08-009 | NRC to Hold Regulatory Conference with Arizona Public Service Co. on Palo Verde Nuclear Generating Station |
03/14/2008 | 08-057 | Statement of NRC Chairman Dale E. Klein on the Confirmation of Gregory Jaczko to a Second Term |
03/14/2008 | 08-056 | Statement of NRC Chairman Dale E. Klein on the Confirmation of Kristine Svinicki as an NRC Commissioner |
03/14/2008 | IV-08-008 | NRC TO Discuss 2007 Performance Assessment for Palo Verde Nuclear Generatiang Station |
03/14/2008 | 08-055 | NRC Announces Chief of New Computer Security Office |
03/13/2008 | 08-054 | NRC and Great Britian Renew Nuclear Safety Cooperation Agreement |
03/11/2008 | 08-053 | NRC Public Meeting March 13 to Discuss Potential Pressurized Water Reactor Weld Issues |
03/11/2008 | 08-052 | NRC Establishes Edward Mcgaffigan Jr. Award for Lifetime Achievement in Public Service |
03/10/2008 | 08-051 | ASLB Requests Information from Potential Parties to Yucca Mountain Hearing |
03/10/2008 | 08-050 | NRC Announces Opportunity to Request Hearing on License Renewal Application for Three Mile Island Nuclear Plant |
03/10/2008 | 08-049 | Harris Application for New Reactors Available on NRC Website |
03/07/2008 | II-08-008 | NRC to Hold Public Meeting March 18 at Metropolis, Ill. to Discuss Regulatory Safety Performance at Honeywell |
03/07/2008 | 08-048 | NRC 20th Annual Regulatory Information Conference March 11-13 to Focus on: Enhancing Safety During the Global Nuclear Renaissance |
03/07/2008 | 08-047 | Grand Gulf Application for New Reactor Available on NRC Website |
03/06/2008 | 08-046 | NRC Announces Opportunity to Participate in Hearing on New Reactor Application for North Anna Site |
03/06/2008 | 08-045 | NRC Meeting with Public April 3 on Environmental Scoping for Bellefonte New Reactor Application |
03/06/2008 | 08-044 | NRC Issues Annual Assessments for Nation’s Nuclear Plants |
03/05/2008 | IV-08-007 | NRC Issues Confirmatory Action Letter To Sabia, Inc. Following Contamination Event |
03/04/2008 | 08-043 | NRC Approves Power Uprate for Vogtle Nuclear Power Plant |
03/03/2008 | 08-042 | NRC Advisory Committee on Nuclear Waste and Materials to Meet in Rockville, Md, March 18-20 |
February | ||
Date | Document Number | Description |
02/29/2008 | 08-041 | NRC Accepts US-APWR Design Application for Review |
02/29/2008 | I-08-008 | Licensing Board to Hear Oral Arguments in Indian Point License Renewal Proceeding |
02/29/2008 | 08-040 | NRC, FERC Commissioners to Discuss Grid Reliability April 8 in Washington |
02/28/2008 | I-08-007 | Puerto Rico Firm to Receive $15,000 Fine, Make Changes under Settlement Agreement with NRC |
02/28/2008 | 08-039 | NRC Meeting With Public March 19 on Environmental Scoping for Calvert Cliffs New Reactor Application |
02/28/2008 | 08-038 | NRC Dockets Application for New Reactors at Lee Site in South Carolina |
02/26/2008 | 08-037 | Statement on Turkey Point Nuclear Power Plant |
02/26/2008 | I-08-006 | NRC to Discuss Review of License Renewal Application for Three Mile Island 1 Nuclear Power Plant |
02/26/2008 | 08-036 | NRC Accepts EPR Design Application for Review |
02/20/2008 | 08-035 | NRC Advisory Committee On Reactor Safeguards to Meet March 6-8 in Rockville, Md. |
02/20/2008 | 08-034 | NRC Welcomes National Academies Recommendations on Radiation Source Replacement |
02/19/2008 | 08-033 | NRC Announces $15 Million in Nuclear Education Grant Opportunities |
02/19/2008 | 08-032 | NRC Announces Strategic Plan For Fiscal Years 2008-2013 |
02/14/2008 | 08-031 | NRC Announces Transition Schedule For Advisory Committee Merger |
02/14/2008 | III-08-004 | NRC to Hold Informational Meeting on Final Decommissioning Of Battelle Memorial Institute’s West Jefferson Site |
02/14/2008 | 08-030 | NRC to Hold Public Workshop Feb. 22 on Regulation of Uranium Conversion/Deconversion Facilities |
02/13/2008 | II-08-007 | Browns Ferry Unit 1 Nuclear Power Plant to Receive Additional NRC Oversight |
02/13/2008 | 08-029 | NRC Proposes to Amend Licensing, Inspection and Annual Fees Rule |
02/12/2008 | I-08-005 | NRC Issues “White” Finding to Peach Bottom Nuclear Plant for Security Officer Inattentiveness and Related Issue |
02/12/2008 | II-08-006 | NRC to Hold Public Meeting On Feb. 28 in Erwin, Tenn. to Review NFS Safety Performance |
02/12/2008 | 08-028 | NRC Pursues Enhancements of its Allegation and Inspection Activities Following Security Officer Issues at Peach Bottom Nuclear Power Plant |
02/12/2008 | II-08-005 | NRC Issues Order to Former Turkey Point Security Employee Prohibiting Work in NRC-Licensed Activities for Three Years |
02/08/2008 | 08-027 | NRC Announces Opportunity to Participate in Hearing on New Reactor Application for Bellefonte Site |
02/07/2008 | 08-026 | NRC Issues Final Rule to Expedite Review of Access Determinations for Certain Information for Hearings |
02/07/2008 | I-08-004 | NRC Proposes $3,250 Fine for N.J. Company Over Violation Associated with Theft of Portable Nuclear Gauge |
02/06/2008 | 08-025 | NRC, DOE to Hold Public Workshop Feb. 19-21 on Extended Life For Nuclear Power Plants |
02/06/2008 | III-08-003 | NRC Issues Confirmatory Action Letter and Sends Special Inspection to Missouri Company Manufacturing Products for Nuclear Medicine |
02/05/2008 | I-08-003 | Salem Unit 1 Nuclear Power Plant to Receive Additional NRC Oversight |
02/05/2008 | 08-024 | NRC Merges Advisory Committees on Reactor Safeguards and Nuclear Waste |
02/04/2008 | 08-023 | NRC to Meet Feb. 21 In Port Gibson, Miss., to Discuss Review Process for Expected New Reactor Application |
02/04/2008 | 08-022 | NRC Releases FY 2009 Budget To Congress; Provides Increased Oversight of Nuclear Plants, Materials and New Reactors |
02/01/2008 | 08-021 | Uranerz In-situ Leach License Application Available for Public Viewing |
02/01/2008 | 08-020 | NRC Announces Opportunity to Request Hearing on License Application for Uranium Recovery Operation in Wyoming |
02/01/2008 | II-08-004 | NRC Establishes Special Inspection Team Following Event at Global Nuclear Fuel – Americas Plant Near Wilmington, N.C. |
January | ||
Date | Document Number | Description |
01/30/2008 | 08-019 | NRC Approves Power Uprate for Susquehanna |
01/29/2008 | 08-018 | NRC Advisory Committee on Reactor Safeguards to Meet Feb. 7-9 in Rockville, Md. |
01/29/2008 | 08-017 | NRC Finds No Significant Environmental Impacts From Extended Operation of James A. Fitzpatrick Nuclear Plant |
01/29/2008 | 08-016 | NRC Accepts Application for New Reactor at North Anna |
01/28/2008 | 08-015 | NRC Names Thomas Boyce as Director of Information Services and Deputy Chief Information Officer |
01/28/2008 | 08-014 | License Renewal Application for Three Mile Island Unit 1 Available for Public Inspection |
01/25/2008 | 08-013 | NRC Accepts Partial Application for New Reactor at Calvert Cliffs |
01/25/2008 | 08-012 | NRC Accepts Inspector General Findings Regarding Hemyc Fire Barrier Testing |
01/24/2008 | II-08-002 | NRC Proposes $32,500 Fine Against BWXT in Lynchburg, VA |
01/24/2008 | 08-011 | NRC Approves Power Uprate for Crystal River Nuclear Power Plant |
01/24/2008 | 08-010 | Areva Application to Certify EPR Design Available on NRC Website |
01/24/2008 | 08-009 | NRC Proposes $650,000 Fine for Entergy's Failure to Fully Implement a New Alert System at the Indian Point Nuclear Power Plant |
01/22/2008 | II-08-001 | NRC Proposes $208,000 Fine Against Florida Power & Light for Security Violations at Turkey Point Nuclear Power Plan |
01/22/2008 | 08-008 | NRC Proposes New Environmental Protection Requirements for Licensees to Avoid Future Legacy Sites |
01/22/2008 | 08-007 | NRC Accepts Applications for Bellefonte New Reactors, Amended AP1000 Design for Review |
01/21/2008 | III-08-002 | NRC Begins Special Inspection of Electrical Problems at the Point Beach Nuclear Plant |
01/18/2008 | 08-006 | Mitsubishi Application to Certify US-APWR Design Available on NRC Website |
01/16/2008 | IV-08-006 | NRC Conducting Special Inspection at Wolf Creek Nuclear Plant |
01/15/2008 | IV-08-005 | NRC Assigns New Senior Resident Inspector at Grand Gulf Nuclear Plant |
01/14/2008 | III-08-001 | NRC Proposes $3,250 Fine for Violation Associated with Theft Of Nuclear Gauge from Southfield, Mich., Firm |
01/14/2008 | IV-08-004 | NRC Orders Changes at San Onofre Nuclear Generating Station |
01/14/2008 | 08-005 | NRC Announces Expanded Photo Gallery on Its Web Site |
01/11/2008 | I-08-002 | NRC to Discuss Apparent Violations by Nuclear Medicine Company |
01/11/2008 | 08-004 | NRC Staff Issues Generic Letter on Managing Gas Accumulation in Reactor Safety Systems |
01/09/2008 | 08-003 | NRC to Hold 20th Annual Regulatory Information Conference March 11-13 in Rockville, MD |
01/09/2008 | IV-08-003 | NRC Names New Resident Inspector at Arkansas Nuclear One |
01/08/2008 | IV-08-002 | NRC Conducting Special Inspection at San Onofre Nuclear Plant |
01/07/2008 | 08-002 | NRC to Hold Public Meetings Feb. 5 on Environmental Scoping for South Texas Project New Reactor Application |
01/07/2008 | 08-001 | NRC to Hold Three Public Meetings Seeking Input on Possible Changes to Security Requirements for Transporting Certain Radioactive Materials |
01/04/2008 | IV-08-001 | NRC Names New Resident Inspector at Palo Verde Nuclear Generating Station Plant |
01/04/2008 | I-08-001 | NRC to Discuss Apparent Violations with Bellmawr, N.J. Firm on Control of Radioactive Materials |
Page Last Reviewed/Updated Thursday, March 29, 2012