VAP Output : 1TWRMR

Sixty Meter Tower: mixing ratio at surface, 25-m, and 60-m, 1-min average

Active Dates
1998.04.01 - 2012.10.03

Originating VAP Process
Tower Water-Vapor Mixing Ratio : TWRMR

Measurements

The measurements below provided by this product are those considered scientifically relevant.

Locations

  • Southern Great Plains (SGP)
    • Central Facility, Lamont, OK (C1)