![]() ![]() | ![]() |
![]() |
||
![]() | REPORT | ![]() |
This report is an archived publication and may contain dated technical, contact, and link information |
|
Publication Number:
FHWA-HRT-12-051
Date: August 2012 |
PDF files can be viewed with the Acrobat® Reader®
This guide was issued to provide guidelines for construction of the geosynthetic reinforced soilintegrated bridge system (GRS-IBS). Refer to Geosynthetic Reinforced Soil Integrated Bridge System Interim Implementation Guide for GRS-IBS design and construction guidelines.(1)
This guide serves as the technical basis for agency-developed standard specifications. Local experience and practice shall be incorporated as applicable.
Topics: research, infrastructure, structures Keywords: research, infrastructure, structures TRT Terms: research, infrastructure, Facilities, Structures Updated: 08/30/2012
|