Table 4.4.B.Winter Net Internal Demand, Capacity Resources, and Capacity Margins by North American Electric Reliability Corporation
Assessment Area, 2010 Actual, 2011-2015 Projected (Megawatts) |
|||||||
Interconnection | NERC Regional Assesment Area |
Net Internal Demand[1] -- Winter | |||||
Actual | Projected | ||||||
2010/ 2011 |
2011/ 2012E |
2012/ 2013E |
2013/ 2014E |
2014/ 2015E |
2015/ 2016E |
||
---|---|---|---|---|---|---|---|
Eastern Interconnection | FRCC | 45,954 | 44,196 | 44,750 | 45,350 | 45,923 | 46,503 |
NPCC | 44,172 | 44,924 | 44,637 | 44,422 | 44,216 | 44,354 | |
Balance of Eastern Region |
389,351 | 384,993 | 390,736 | 394,849 | 396,861 | 401,086 | |
MAPP | 4,877 | 4,746 | 4,686 | 4,929 | 4,977 | 5,062 | |
MISO | 80,311 | 71,233 | 67,389 | 69,591 | 69,906 | 70,755 | |
PJM | 115,535 | 119,806 | 127,464 | 127,243 | 128,662 | 129,699 | |
SERC | 148,062 | 148,990 | 150,504 | 151,921 | 152,244 | 153,879 | |
SPP | 40,566 | 40,218 | 40,693 | 41,165 | 41,073 | 41,691 | |
ERCOT | TRE | 55,917 | 50,158 | 49,817 | 51,900 | 53,503 | 54,719 |
Western Interconnection |
WECC | 99,515 | 104,740 | 105,879 | 107,570 | 109,542 | 111,261 |
All Grids | Contiguous U.S. |
634,909 | 629,011 | 635,819 | 644,091 | 650,044 | 657,923 |
Interconnection | NERC Regional Assesment Area | Capacity Resources[2] -- Winter | |||||
Actual | Projected | ||||||
2010/ 2011 |
2011/ 2012E |
2012/ 2013E |
2013/ 2014E |
2014/ 2015E |
2015/ 2016E |
||
Eastern Interconnection |
FRCC | 57,358 | 55,786 | 57,282 | 58,030 | 61,245 | 60,543 |
NPCC | 70,557 | 74,946 | 75,937 | 77,155 | 77,850 | 77,706 | |
Balance of Eastern Region |
595,627 | 570,224 | 578,991 | 581,968 | 582,872 | 580,949 | |
MAPP | 6,941 | 7,078 | 7,038 | 7,118 | 7,118 | 7,088 | |
MISO | 129,241 | 107,051 | 101,737 | 101,796 | 101,815 | 101,838 | |
PJM | 190,000 | 182,643 | 189,777 | 191,426 | 192,016 | 192,022 | |
SERC | 207,558 | 208,978 | 214,974 | 215,492 | 215,346 | 213,657 | |
SPP | 61,888 | 64,474 | 65,466 | 66,137 | 66,577 | 66,345 | |
ERCOT | TRE | 77,660 | 77,256 | 78,440 | 78,535 | 80,695 | 82,095 |
Western Interconnection |
WECC | 156,413 | 161,583 | 168,816 | 172,598 | 175,807 | 176,112 |
All Grids | Contiguous U.S. |
957,615 | 939,795 | 959,466 | 968,287 | 978,469 | 977,406 |
Interconnection | NERC Regional Assesment Area |
Capacity Margin (percent)[3] -- Winter | |||||
Actual | Projected | ||||||
2010/ 2011 |
2011/ 2012E |
2012/ 2013E |
2013/ 2014E |
2014/ 2015E |
2015/ 2016E |
||
Eastern Interconnection | FRCC | 19.9 | 20.8 | 21.9 | 21.9 | 25.0 | 23.2 |
NPCC | 37.4 | 40.1 | 41.2 | 42.4 | 43.2 | 42.9 | |
Balance of Eastern Region |
34.6 | 32.5 | 32.5 | 32.2 | 31.9 | 31.0 | |
MAPP | 29.7 | 32.9 | 33.4 | 30.7 | 30.1 | 28.6 | |
MISO | 37.9 | 33.5 | 33.8 | 31.6 | 31.3 | 30.5 | |
PJM | 39.2 | 34.4 | 32.8 | 33.5 | 33.0 | 32.5 | |
SERC | 28.7 | 28.7 | 30.0 | 29.5 | 29.3 | 28.0 | |
SPP | 34.5 | 37.6 | 37.8 | 37.8 | 38.3 | 37.2 | |
ERCOT | TRE | 28.0 | 35.1 | 36.5 | 33.9 | 33.7 | 33.3 |
Western Interconnection |
WECC | 36.4 | 35.2 | 37.3 | 37.7 | 37.7 | 36.8 |
All Grids | Contiguous U.S. |
33.7 | 33.1 | 33.7 | 33.5 | 33.6 | 32.7 |
[1] Net Internal Demand represent the system demand that is planned for by the electric power industry's reliability authority and is equal to Internal Demand less Direct Control Load Management and Interruptible Demand. [2] Capacity Resources: Utility and nonutility-owned generating capacity that is existing or in various stages of planning or construction, less inoperable capacity, plus planned capacity purchases from other resources, less planned capacity sales. [3] Capacity Margin is the amount of unused available capability of an electric power system at peak load as a percentage of capacity resources. Notes: • NERC region and reliability assessment area maps are provided on EIA's Electricity Reliability web page: http://www.eia.gov/cneaf/electricity/page/eia411/eia411.html • Projected data are updated annually. • Peak load represents an hour of a day during the associated peak period. • The Winter peak period begins October 1 and extends through May 31. • Historically the MRO, RFC, SERC, and SPP regional boundaries were altered as utilities changed reliability organizations. The historical dataseries for these regions have not been adjusted. Instead, the Balance of Eastern Region category was introduced to to provide a consistenttrend of the Eastern interconnection. • E - Estimate Source: U.S. Energy Information Administration, Form EIA-411, "Coordinated Bulk Power Supply and Demand Program Report." |