2009-14-I-TX-1
- Within 30 days, develop and initiate actions to ensure adequate water supply to the CITGO HF mitigation system. Actions could include, but are not limited to, increasing onsite storage capacity, installing a permanent backup system, and developing procedures and training for water management in an emergency.
- Every 30 days, report actions planned or completed to the Refinery Terminal Fire Company and Local Emergency Planning Committee. Continue the 30-day periodic reporting until all planned actions are fully implemented.
Status: C-AA
Download Document
2009-14-I-TX-2
- Within 60 days, complete a third-party audit of all (Corpus Christi, TX and Lemont, IL) CITGO HF alkylation unit operations in the United States as recommended by API Recommended Practice 751, Safe Operation of Hydrofluoric Acid Alkylation Units, Third Edition June 2007. The selected lead auditor shall have extensive knowledge of HF hazards, HF alkylation units, and API 751.
- Consistent with the employee participation requirements of the Process Safety Management Standard for Highly Hazardous Chemicals (29 CFR 1910.119(c)), share all audit results and actions planned or completed to correct deficiencies in each refinery with all CITGO and contract employees whose work area includes that refinery’s alkylation unit.
Status: C-AA
Download Document