FTA Library - Guides, Information, and Brochures
The following topics are presented in this Library page:
Accessibility Agreements Brochure Checklist Circular Executive order
Fact sheet Final guidance |
Forms Guidelines Information sheet Instructions Management, maintenance, and operations Meeting News update Oversight |
Presentation Professional capacity building Proposal profile Road map Significant guidance Traveler information User guide |
Enter a keyword in the text box below to search text on this page:
Enter a keyword in the text box below to search all content within the Library:
Note: Click any column header to sort by that title.
Name | Topic | Publication Date | Description |
---|---|---|---|
2004 State Funding [Text (no images)] |
,Fact Sheet,Information Sheet
|
04-11-06 |
Fiscal year summaries for various states (2004). |
2004 State Funding [Text] |
,Fact Sheet,Information Sheet
|
04-07-04 | Fiscal year summaries for various states (2004). |
2005 Apportionments by State [PDF] |
,Fact Sheet,Information Sheet
|
01-19-05 |
Fiscal year funding summary for each state (2005). |
2005 Apportionments by State [Text] |
,Fact Sheet,Information Sheet
|
01-18-05 |
Fiscal year summaries for each state (2005). |
2006 Before and After Studies Letter to Congress [DOC] |
,Fact Sheet,Information Sheet
|
08-23-06 |
Letter to congress detailing the SAFETEA-LU addition to the US code requirments. |
2006 Before and After Studies Letter to Congress [PDF] |
,Fact Sheet,Information Sheet,Policy Letter
|
08-23-06 |
Letter to congress detailing the SAFETEA-LU addition to the US code requirments. |
2006 Funding by State [XLS] |
,Fact Sheet
|
09-11-06 |
Fiscal year funding breakdown for each state (2006). |
2007 Funding by State [XLS] |
,Information Sheet
|
10-01-07 |
Fiscal year fund breakdown for each state. |
2008 Funds by State [XLS] |
,Information Sheet
|
10-01-08 |
Breakdown of funds for each state. |
2009 Funding by State [XLS] |
,Appropriations Report,Information Sheet
|
10-01-09 |
Funding breakdown state by state. |
2011 Funding by State [XLS] |
,Fact Sheet,Information Sheet
|
05-20-11 |
Spreadsheet listing how much funding each state has received. |
AcuTech Consulting Group [PDF] |
,Information Sheet
|
12-18-07 |
Description of AcuTech's capbilities and function inside the FTA. |
Adams Gabbert and Associates [PDF] |
,Information Sheet
|
02-29-08 |
Breakdown of AdamsGabbert's capabilties within FTA. |
Added Access Report [PDF] |
,Final Guidance,Report
|
08-06-03 |
Added access report for FHWA as it relates to the environmental review process |
Administrator's Policy Letters: State of Good Repair [PDF] |
,Policy Letter
|
09-30-08 |
Administrator Simpson's "Dear Colleague letter" about ways to keep our nations transit systems under a state of good repair. |
Alternative Fuels and Propulsion Vehicle Incentives [DOC] |
,Information Sheet
|
07-16-07 |
List of resources for incentives to buying alternative fuel vehicles. |
Alternatives Analysis Discretionary Program |
,Fact Sheet,Information Sheet
|
03-08-07 |
Complete analysis of alternative fuels and how it would impact current transit systems. |
Alternatives Analysis Guidance [PDF] |
,Fact Sheet,Information Sheet
|
12-22-06 |
FTA Alternatives Analvsis Guidance for the Rogue Valley Commuter Rail Proiect |
American Recovery and Reinvestment Act (ARRA) Civil Rights Teleconference - March 12, 2009 - 11AM to 12PM |
,Information Sheet
|
03-04-09 |
Teleconference announcement letter. |
American Recovery and Reinvestment Civil Rights Conference Call - March 12, 2009 – 11AM – 12PM |
,Information Sheet
|
03-12-09 |
ARRA conference call trascript. |
American Systems [PDF] |
,Fact Sheet,Information Sheet
|
02-29-08 |
American Systems FTA capabilities statement. |
Annual Awards Program |
,Information Sheet
|
08-10-06 |
Ridership award details rules and how to enter. |
APPENDIX A Fiscal Year 2011 Annual List of Certifications and Assurances for Federal Transit Administration Grants and Cooperative Agreements |
,Agreements
|
10-29-10 |
Description of how 49 U.S.C. 5323(n) applies to FTA assistance programs |
Appendix A: Fiscal Year 2007 Annual List of Certifications and Assurances for Federal Transit Administration Grants and Cooperative Agreements |
,Agreements,Forms
|
12-18-06 |
Description of how 49 U.S.C. 5323(n) applies to FTA assistance programs. |
Appendix C |
,Flowchart
|
07-01-05 |
Appendix C: Graphs & Charts |
Appendix G |
,Flowchart
|
07-01-05 |
Beach profile graphs. |
Appendix H |
,Flowchart
|
07-01-05 |
LSV simulations of the spatial distributions of wake power on Point White, Bainbridge Island |
Appendix I: SAFETEA-LU Authorization Levels |
,Fact Sheet,Information Sheet
|
09-08-05 |
Safe, Accountable, Flexible and Efficient Transportation Equity Act: a Legacy for Users (SAFETEA-LU) authorization levels. |
Application Guidance |
,Forms,Guidelines,Instructions
|
08-01-11 |
Transit Investments for Greenhouse Gas and Energy Reduction (TIGGER III) Guidance for Applicants |
APPORTIONMENT OF FISCAL YEAR (FY) 2007 METROPOLITAN PLANNING FUNDS |
,Appropriations Report,Fact Sheet
|
12-06-00 |
Fiscal year 2007 financial obligations for metropolian and statewide research. |
April 2008 Transit Research Update |
,News Update
|
04-01-08 |
Complete update for 2008 on all current FTA research programs. |
April 2009 Transit Research Update |
,Information Sheet,Report,Research Publication
|
05-07-09 |
Complete update for 2009 on all current FTA research programs. |
April 2010 Transit Research and Industry News Update |
,Information Sheet,Research Publication
|
05-04-10 |
Complete update for 2010 on all current FTA research programs. |
ARC Handouts (PPT) |
,Meeting,Presentation
|
02-23-04 |
Trans-Hudson express tunnel project outline and background information. |
ARC Handouts (Word) |
,Meeting,Presentation
|
05-09-05 |
Tanrs-Hudson express tunnel project outline and background information. |
ARCADIS [PDF] |
,Information Sheet
|
12-21-07 |
Description of all ARCADIS rails systems projects complete for the FTA. |
ATPPL Program Manual |
,User Guide
|
01-10-07 |
Primary reference guide for the ATPPL. |
ATPPL Program Manual: Marked for posible remoal |
,User Guide
|
01-10-07 |
This manual is the primary reference guide for ATPPL. |
Attachment 1 - Handbook Checklist |
,Checklist
|
03-11-11 |
New Grantee Handbook Checklist |
Attachment 11 - Financial Capacity Questionnaire |
,Information Sheet
|
03-11-11 |
Financial capacity questionaire |
Attachment 12 - Internal Control Self-Assessment |
,Forms
|
11-18-05 |
Internal control self- assessment for for grantees. |
Attachment 14 - TEAM Vendor ID Request Form |
,Forms
|
03-02-07 |
Request to edit a TEAM recipient/vendor record. |
Attachment 15 - TEAM User Access Request Form |
,Forms
|
02-14-11 |
FTA Team user access request form. |
Attachment 16 - Example Designation of Signature Authority Letter |
,Forms
|
01-22-09 |
Sample of how the FTA would like a designation of signature authority. |
Attachment 17 - TEAM User Access Form Instructions |
,Forms
|
03-11-11 |
TEAM User Access Form Instructions |
Attachment 18 - ECHO User Manual |
,User Guide
|
03-10-10 |
ECHO web users manual for the FTA and FAA. |
Attachment 19 - ECHO User Setup Forms |
,Forms
|
03-11-11 |
Instructions for echo user setup. |
Attachment 2 - Sample Opinion of Counsel |
,Forms
|
03-31-09 |
Sample opinion of counsel. |
Attachment 3 - Sample Authorizing Resolution |
,Forms
|
03-31-09 |
FTA sample authorizing resolution. |
Attachment 4 - Master Agreement |
,Agreements
|
10-01-10 |
FTA mater agreement attachment. |
Attachment 6 - Limited English Proficiency Handbook |
,User Guide
|
04-13-07 |
Implementing the DOT's LEP handbook. |
Attachment 7 - Title VI Program Checklist |
,Checklist
|
03-11-11 |
Title VI program checklist. |
Attachment 8 - DBE Program Checklist |
,Checklist
|
11-02-09 |
Overall DBE program checklist. |
Attachment 9 - EEO Checklist |
,Checklist
|
11-02-09 |
Title VII EEO program checklist. |
August 2008 Transit Research Update |
,News Update
|
09-08-08 |
Outlines various publications and information released during 2008 for the FTA. |
August 2009 Transit Research and Industry News Update |
,News Update
|
09-14-09 |
Outlines various publications and information released during 2009 for the FTA |
Basic Grant Making Procedures Presentation |
,Presentation
|
12-09-07 |
A guide on how to recieve grant funding from FTA in Florida. |
BeDazzle Consulting Group [PDF] |
,Information Sheet
|
02-29-08 |
BeDazzle statement of capabilities within the FTA. |
Best Development Practices: A Primer |
,Fact Sheet,Guidelines,Information Sheet
|
07-13-99 |
Going into detail about the best ways to deal with suburban sprawl and its costs. |
Bicycles & Transit: A Partnership that Works |
,Information Sheet
|
09-20-99 |
Describes how transit agencies around the country are building bicycle and transit connections. |
Birth of a Grant |
,Guidelines,Instructions,Presentation
|
05-18-11 |
PDF that explains how a grant is created. |
Bithop Systems [PDF] |
,Brochure
|
04-14-07 |
Breakdown of Bithop systems and their capibilities within the FTA |
BOOZ ALLEN [PDF] |
,Information Sheet
|
12-20-07 |
Booz Allen Hamilton FTA capabilities statement |
BPC GROUP CAPABILITY STATEMENT ONE [PDF] |
,Information Sheet
|
06-23-08 |
BPC Group statement about capabilties within the FTA and list of project BPC Group is involved in. |
BPC GROUP CAPABILITY STATEMENT THREE [PDF] |
,Information Sheet
|
06-21-08 |
BPC group modeling capabilties within FTA and example project that have benefitted. |
BPC GROUP CAPABILITY STATEMENT TWO [PDF] |
,Information Sheet
|
06-21-08 |
BPC Group and thier capabilities witihng FTA regarding environmental services. |
Brochure - FMO Seminars 2007 |
,Brochure
|
||
Bus and Bus Facilities Discretionary Program Grants (Section 5309) |
,Fact Sheet,Information Sheet
|
03-08-07 |
Priorities established by the FTA for the discretionary program, criteria FTA will use in evaluating applications, and describes how to apply. |
Bus Livability FAQs |
,Fact Sheet,Information Sheet
|
07-18-11 |
FAQ for 2011 Bus Livability program |
Bus Manufacturer Survey: Appendix B |
,Information Sheet
|
01-19-06 |
Vehicle market reliability study suvey for bus manufacturers. |
Bus Manufacturers Interview Worksheet: Appendix C |
,Information Sheet
|
02-02-06 |
FTA non rail vehicle market viability study bus manufacturer interview worksheet |
Bus Study Survey: Appendix A |
,Fact Sheet,Information Sheet
|
01-19-06 |
FTA survey on non rail vehicle market viability. |
Capital Cost Database |
,Information Sheet
|
01-04-11 |
Microsoft Access Database |
CDI [PDF] |
,Brochure
|
01-28-04 |
CDI services capabilities withing FTA as well as project tey have worked on. |
CEM for LRV [PDF] |
,Guidelines,Instructions
|
02-14-08 |
Possible collision safety improvement for light rail vehicles operating in shared right of way stree environments. |
Census and FTA Formula Grants | |||
Century Diversified [PDF] |
,Information Sheet
|
12-19-07 |
Summary of the capabilities of Century Diversified within FTA. |
CH2M Hill [PDF] |
,Information Sheet
|
03-05-08 |
CH2M Hill capabilties statement for the FTA. |
Charlotte Risk Assessment Presentation (PPT) |
,Meeting,Presentation
|
03-24-11 |
Complete breakdown of risks associated with the South Corridor light rail project. |
Charlotte Risk Assessment Presentation (Word) |
,Presentation
|
05-09-05 |
South Corridor Light Rail Project: Project Risk Assessment |
Charlotte State Programs Team Meeting Summary |
,Meeting
|
04-09-08 |
Minutes from the Charlotte state programs team meeting about various program sates and comments. |
Chicago Transit Authority vs A&D Davenport Transportation Dec 1, 1976 (PDF) |
,Fact Sheet,Information Sheet
|
03-24-09 |
Findings about the complaint between A&D Davenport Transportaion and radford School Bus District. |
Childcare Services at Transit Stations |
,Presentation,Report
|
11-12-05 |
2005 report on successful examples of colocating childcare facilities at public transit centers including background and plans for further development. |
Civil Rights |
,Accessibility,Information Sheet,Instructions
|
04-22-08 |
Reminder from the FTA to complete all paperwork and publications required for the DBE program. |
Coastal Georgia RDC Presentation |
,Presentation
|
11-01-07 |
Study for Coastal Georgia Region to develop a plan for coordinated, regional transportation system. |
Co-Lead Categorical Exclusion Process [PDF] |
,Final Guidance
|
08-03-03 |
Sound Transit categorical exclusion process becakground and information. |
Co-Lead Environmental Re-Evaluation Worksheet [PDF] |
,Checklist
|
08-06-03 |
Woksheet from FTA for the environmental co-lead to fill out about the project. |
Co-Lead NEPA Categorical Exclusion Worksheet [PDF] |
,Forms
|
08-06-03 |
Co-lead environmental review worksheet to determine categorical exclusions for NEPA. |
Columbia/Equador |
,Meeting,Presentation
|
03-20-07 |
Power Point Presentation on transportation in Colombia and Equador |
Common Environmental Performance Commitments |
,Information Sheet
|
06-03-04 |
Proposed commitments for the Lower Manhattan FTRC envorimental plan. |
Community Transportation Association - Joblinks Employment |
,Meeting,Presentation
|
04-30-01 |
Joblinks presentation explaining the purpose and goals withing FTA. |
Comparison of Flexible Fund Obligations by Purpose and by State |
,Fact Sheet,Information Sheet
|
01-21-03 |
Complete flexible fund breakdown for each state through fiscal year 1992 to fiscal year 2002. |
Comparison of Flexible Fund Obligations by Purpose for UZAs Greater than 1 Million Population |
,Fact Sheet,Flowchart
|
01-21-03 |
Flexible fund obligation breakdown for all UZAs over one million in population for fiscal year 1992 through fiscal year 2002. |
Conference Report |
,Fact Sheet,Information Sheet,Report
|
09-09-05 |
Details about the SAFTEA-LU new freedom program. |
Conflict of Interest Requirements Involving Environmental and Engineering Services [PDF] |
,Final Guidance
|
06-05-01 |
Adhering to conflict of interest requirements in contracts involving environmental and engineering services. |
Conflict of Interest Requirements Involving Environmental and Engineering Services [PDF] |
,Final Guidance
|
08-06-03 |
Hlping to assure that contracts with environmental and engineering dont not create a conflict of intrest. |
Conflict of Interest Requirements Involving Environmental and Engineering Services [PDF] |
,Final Guidance
|
06-05-01 |
Adhereing to conflict of interest requirements in contracts. |
Construction Project Management Handbook (2009 Update) |
,Guidelines,User Guide
|
09-22-09 |
Construction Project Management Handbook: Updated 2009 Edition |
Copy of FY 2010 Financial Management Oversight Registration Form |
,Forms
|
01-25-10 |
Registration form for attendance to the fiscal year 2010 FTA financial mangement oversight seminar. |
Copy of FY 2010 Financial Management Oversight Seminar Overview |
,Oversight,Seminar
|
01-25-10 |
Description of the seminar purpose and who should attend as well as things that will be discussed. |
Creating Section 508 Compliant Documents & Presentations |
,Meeting,Presentation
|
11-17-05 |
Guidlines for creating section 508 compliant documentation. |
Cumulative Flexible Fund Transfers to All FTA Programs FY 1992 - 2002 |
,Fact Sheet,Information Sheet
|
12-30-02 |
A listing of all flexible fund transfers to all FTA programs by state from 1992 to 2002. |
DAVID EVANS CAPABILITY [PDF] |
,Information Sheet
|
12-20-07 |
David evans and associated capabilities statement. |
Day 1 - Charter Final Rule Presentation |
,Meeting,Presentation
|
04-08-08 |
Description of the new charter rule and how to find more information. |
Day 1 - AM - Beyond the Recession - Kentucky |
,Meeting,Presentation
|
04-16-09 |
The effects of the recession in Kentucky as well as the measure the state is taking to counteract the effects. |
Day 1 - AM - Beyond the Recession - Mississippi |
,Meeting,Presentation
|
04-16-09 |
The effects of the recession in Mississippi and the measures the state is taking to counteract them. |
Day 1 - AM - Beyond the Recession - South Carolina |
,Meeting,Presentation
|
04-16-09 |
The effects of the recession in South Carlina and the measures the state is taking to counteract them. |
Day 1 - AM - State DOT Atlanta Meeting_April 2009 - Welcome and Beyond the Recession |
,Meeting,Presentation
|
04-16-09 |
Schedule of events and guidelines for state recession presentations. |
Day 1 - Ia - NEPA Basics - Immings |
,Meeting,Presentation
|
05-19-08 |
NEPA basic concepts and implementation. |
Day 1 - Ib - FTA 101 - Pfister |
,Meeting,Presentation
|
05-21-08 |
FTA 101 training presentation. |
Day 1 - Ic - Third Party Procurement - Buy America - Jensen |
,Meeting,Presentation
|
05-28-08 |
Presentation on whats new for the buy amercian FTA program. |
Day 1 - Ic - Third Party Procurement - JHarper |
,Meeting,Presentation
|
05-28-08 |
Third party procurment region IV workshop presentation. |
Day 1 - Id - Safety and Security - Lazaro |
,Meeting,Presentation
|
05-28-08 |
FTA transit bus safety and sercuity program overview presentation. |
Day 1 - IIa - NEPA Cat Ex - Immings |
,Presentation
|
05-19-08 |
Categorical exclusion and how to differentiate and document CatX. |
Day 1 - IIb - Grant Making 101 - LaShore |
,Meeting,Presentation
|
05-19-08 |
Grant Making 101 presentation. |
Day 1 - IIc - Charlotte TOD - Votaw |
,Meeting,Presentation
|
05-19-08 |
Scaleybark TOD/ joint development project presentation. |
Day 1 - IId - Innovative Finance - Martin |
,Meeting,Presentation
|
05-19-08 |
Various region IV financing options and their pros and cons. |
Day 1 - IId - Innovative Financing - SMyers |
,Meeting,Presentation
|
05-20-08 |
Region IV conference presentation on innovative transit financing. |
Day 1 - IId - Innovative Financing - TBishop |
,Meeting,Presentation
|
05-15-08 |
Description of funding problems and innovative ways to increase funding for FTA projects. |
Day 1 - IId - Innovative Financing - Volinski |
,Meeting,Presentation
|
05-20-08 |
Lessons learned in transit efficiencies, cost reductions, and revenue generation. |
Day 1 - IIIa - Planning for a Transit Facility |
,Meeting,Presentation
|
05-20-08 |
Examines the federal requirements for various types of tranist facilities. |
Day 1 - IIIb - FTA Grant Management and Reporting 101 |
,Meeting,Presentation
|
05-20-08 |
Grants managment 101 presentation. |
Day 1 - IIIc - NS and SS Overview - Day |
,Meeting,Presentation
|
05-20-08 |
Overview of new starts and small starts programs beth day presentation. |
Day 1 - IIId - MSAA - Atlanta |
,Meeting,Presentation
|
05-28-08 |
Atlant TMCC presentation. |
Day 1 - IIId - MSAA - Louisville |
,Meeting,Presentation
|
05-20-08 |
Lousiville region: travel management coordination center. |
Day 1 - IIId - MSAA - LSCOG |
,Meeting,Presentation
|
05-20-08 |
LSTMCC taskforce for better mobiltity. |
Day 1 - IIId - MSAA - Orlando |
,Meeting,Presentation
|
05-20-08 |
MORETMCC presentation. |
Day 1 - IIId - MSAA - Schilling |
,Meeting,Presentation
|
05-20-08 |
MSAA/UWR Initiatives and target agencies. |
Day 1 - Intercity Bus Presentation |
,Meeting,Presentation
|
04-08-08 |
Intercity bus transit requirement presentation. |
Day 1 - Lunch - ARRA |
,Meeting,Presentation
|
04-16-09 |
FTA ARRA presentation and introduction |
Day 1 - Lunch - ARRA - Kentucky |
,Meeting,Presentation
|
04-16-09 |
Kentucy ARRA project slection and continuing fund processes |
Day 1 - North Carolina Rural Vanpool Program |
,Meeting,Presentation
|
04-09-08 |
NC vanpool program presentation. |
Day 1 - PM - FTA Guidance Updates and New Information |
,Meeting
|
04-16-09 |
Description of policy changes and updates to the new freedom, section 5310, and coordinated planning FTA documentation. |
Day 1 - PM - FTA Tracking and Transferring Funding |
,Meeting,Presentation
|
04-16-09 |
Tracking and transferring funding presentation. |
Day 1 - PM - Intercity Bus Consultation Letter |
,Meeting,Presentation
|
04-09-09 |
RIPTA letter confirming that the intercity bus needs are met. |
Day 1 - PM - Intercity Bus Program |
,Meeting,Presentation
|
04-16-09 |
FTA intercity transit program overview. |
Day 1 - PM - Particulate Matter 2.5 |
,Meeting
|
04-15-09 |
PM 2.5 designations for air quality conformity presentation. |
Day 1 - PM - Planning for a Transit Facility in Small Urbanized and Rural Areas |
,Meeting
|
04-16-09 |
Planning presention for transit facilities in small urbanized and rural areas. |
Day 1 - State DOT Charlotte Meeting Overview |
,Meeting,Presentation
|
04-08-08 |
Charlotte state program team semi-annual meetingschedule and breakdown of events. |
Day 2 - State Management Review Presentation |
,Meeting,Presentation
|
04-08-08 |
State oversight management review presentation. |
Day 2 - Transit Facility Planning |
,Meeting,Presentation
|
04-08-08 |
Guidiance presentation for how to plan for a tansit facility using FTA funds. |
Day 2 - AM - State Management Review and Oversight |
,Meeting,Presentation
|
04-16-09 |
State management review fiscal year 2008 and beyond. |
Day 2 - AM - ARRA Reporting Requirements |
,Meeting
|
04-16-09 |
ARRA certifications and reporting requirements presentation. |
Day 2 - AM - Civil Rights |
,Meeting,Presentation
|
04-16-09 |
FTA civil rights and ARRA 2009 programs presentation |
Day 2 - AM - Connecting Communities |
,Meeting,Presentation
|
04-16-09 |
onnectiong communities and emergency reporting FTA region IV presnetation. |
Day 2 - AM - FY2009 Grant Making Procedures |
,Meeting,Presentation
|
04-16-09 |
Fiscal year 2009 grant making dealine and procedure recap. |
Day 2 - AM - Grants Management |
,Meeting,Presentation
|
04-15-09 |
Grant mangement reporting and close outs. |
Day 2 - Coordinated Planning - KYTC |
,Meeting,Presentation
|
04-08-08 |
Kentucky coordinated plan update FTA state programs meeting. |
Day 2 - Coordinated Planning - SCDOT |
,Meeting,Presentation
|
04-08-08 |
A guide through the coordinated planning process. |
Day 2 - Coordinated Planning Part II |
,Meeting,Presentation
|
04-08-08 |
Region IV coordinated planning presentation part 2 |
Day 2 - Grant Manangement Presentation |
,Meeting,Presentation
|
04-08-08 |
Grant management and close outs presentation. |
Day 2 - IVa - Joint Planning Regs - Garland |
,Meeting,Presentation
|
05-18-08 |
Joint FHWA/FTA planning regulations final rule key requirements presentation. |
Day 2 - IVb - Technical Capacity - Whyte |
,Meeting,Presentation
|
05-20-08 |
Presentation about expanding the technical capacity in FTA programs. |
Day 2 - IVc - Small Starts Program - Day |
,Meeting,Presentation
|
05-20-08 |
Small and very small starts program beth day presentation. |
Day 2 - IVd - University Research - Volinski |
,Meeting,Presentation
|
05-20-08 |
UTC universities and their purpose and role in urban transit research. |
Day 2 - NTD Rural Reporting Presentation |
,Meeting,Presentation
|
04-08-08 |
Rural reporting national transit database presentation. |
Day 2 - Time Management for FTA Grant Making Presentation |
,Meeting,Presentation
|
04-08-08 |
Time management for FTA grant making presentation. |
Day 2 - Va - ARC Coordinated Planning |
,Meeting,Presentation
|
05-20-08 |
Planning PDF, designed for Region 4, specifically city of Atlanta. |
Day 2 - Va - Coordinated Planning - Schilling |
,Presentation
|
04-20-08 |
FTA region IV conference coordinated planning session presentation. |
Day 2 - Va - SCDOT Coordinated Planning |
,Meeting,Presentation
|
05-29-08 |
Grantee Conference Region 4: South Carolina |
Day 2 - Vb - Oversight Programs - White |
,Meeting,Presentation
|
05-20-08 |
FTA oversight programs presentation. |
Day 2 - Vc - University Transit - Anoka |
,Meeting,Presentation
|
05-20-08 |
University transit presentation. |
Day 2 - Vc - University Transit - JLibby |
,Meeting,Presentation
|
05-29-08 |
University transportation systems presentation. |
Day 2 - Vc - University Transit - RTS |
,Meeting,Presentation
|
05-20-08 |
UF RTS partnership presentation. |
Day 2 - Vd - Going Green - Martin |
,Meeting,Presentation
|
05-20-08 |
Public transit and sustainability presentation. |
Day 2 - Vd - Going Green - Thomas_Low_CouncilReportVII |
,Meeting,Presentation
|
04-28-08 |
Study detailing the ways in which to go gren with urban transit. |
Day 2- AM - ARRA Reporting Requirements |
,Meeting
|
04-16-09 |
ARRA and TIGGER reporting and certifications requirements presentation. |
Day 2 AM - Charter Final Rule |
,Guidelines,Presentation
|
05-20-08 |
Charter service final rule description and breakdown. |
Day 2 PM - Transit Security and Emergency Preparedness |
,Presentation
|
05-20-08 |
Transit security and emergency preparedness overview presentation. |
Day 3 - CCAM Panel - Schilling |
,Guidelines,Presentation
|
05-20-08 |
CCAM program breakdown presentation. |
Day 3 - Mobility Management - Jim McLary |
,Presentation
|
05-20-08 |
Mobility managmeent presnetation. |
Day 3 - Mobility Management - St. Johns County |
,Presentation
|
05-20-08 |
Mobility management presentation. |
Day 3 - Mobility Management - TARC |
,Presentation
|
05-20-08 |
Transit Authority of River City: To explore transportation opportunities that enhance social, economic and environment of the Greater Louisville community |
Day 3 - TeamWeb - Anoka |
,Meeting,Presentation
|
05-20-08 |
FTA team web presentation |
Debt Service Reserve Pilot Program – September 2008 [PDF] |
,Policy Letter
|
09-23-08 |
Letter detailing the effectiveness od the debt service reserve pilot program. |
Debt Service Reserve Pilot Program – September 2008 [Word] |
,Policy Letter
|
09-23-08 |
Letter detailing the effectiveness of the debt service reserve pilot program. |
Debt Service Reserve Reimbursement Pilot Program - Composite Version (Corrected) PDF |
,Forms
|
02-23-07 |
Description of the debt service reserve pilot program and its proposed purpose. |
December 2008 Transit Research Update |
,News Update
|
12-05-08 |
Transit research update detailing all the FTA research done in 2008. |
December 2009 Transit Research and Industry News Update |
,News Update
|
01-15-10 |
Transit research update detailing the research done by FTA in 2009. |
Delcan [PDF] |
,Information Sheet
|
12-19-07 |
Delcan capabilities statement. |
Delcan Transportation Information Technology [PDF] |
,Information Sheet
|
05-25-07 |
Delcan capabilities statement for the FTA. |
Deloitte Financial Advisory Services [PDF] |
,Information Sheet
|
12-20-07 |
Deloitte Financial Advisory Services LLP financial advisory capabilities within FTA. |
Designated Recipients for the Job Access & Reverse Commute (JARC) Program |
,Information Sheet
|
01-08-07 |
List of cities and the names of the transit agencies recieving JARC program funds. |
Designated Recipients for the New Freedom Program |
,Information Sheet
|
01-08-07 |
List of recipients of new freedom project funds by UZA. |
Developing Effective Mass Transit Systems: Proceedings of the 5th International Workshop on Public Transportation |
,Meeting,Presentation
|
04-04-08 |
Description of various plans to improve mass tansit in Moscow. |
DHA CAPABILITY STATEMENT [PDF] |
,Information Sheet
|
12-20-07 |
DHA capabilities statement. |
Directions |
,Instructions
|
04-16-08 |
Direction to LRTA hale stree bus maintanence facility. |
Disadvantaged Business Enterprise Program Goal Setting Process |
,Meeting,Presentation
|
03-23-06 |
How to determine what you need to do as a DBE receiving FTA funds. |
Disadvantaged Business Enterprise Program Goal Setting Process [DOC] |
,Information Sheet
|
11-28-07 |
How to determine what you need to do as a DBE recieving FTA funds. |
Discussion #1 – Allowances in the Valuation of Project Benefits and Determination of Cost-Effectiveness For Proposed New Starts Projects (Word) |
,Information Sheet
|
05-15-06 |
Breakdown of the the FTA obtains rating and measurements for cost-effectiveness. |
Discussion #1 – Table 1. Alterative Methods for Computing Cost-Effectiveness (Excel) |
,Forms
|
03-07-06 |
A sample of the way that the FTA computer cost-effectiveness. |
Discussion #10 – Additional Measures for Quality Control of New Starts Forecasts (Word) |
,Information Sheet
|
06-02-06 |
Steps to ensure new starts projects maintain a high quality control level. |
Discussion #11 – Illustrative Mode-Choice and Summit Calculations for Travel by One Market Segment between a Pair of Zones for Base and Build Alternatives (Word) |
,Guidelines
|
03-28-06 |
Describes how the FTA model works to determine a definitive mode choice for optimal cost-effectiveness. |
Discussion #11 – Spreadsheet example of Summit calculations (Excel) |
,Forms
|
03-07-06 |
Interactive spreadsheet detailing the caculations being made to determine mode choice. |
Discussion #16 – Calibration and Validation of Travel Models for New Starts Forecasting (Word) |
,Information Sheet
|
06-06-06 |
Calibration and validation of travel models for new starts forecasting. |
Discussion #17 – Methods for Collection of Data on Transit Riders (Word) |
,Information Sheet
|
06-13-06 |
Description of methods it is possible to use for collecting data on transit riders. |
Discussion #18 – Preservation and Analysis of Travel Forecasts for New Starts Projects (Word) |
,Information Sheet
|
06-06-06 |
Preservation and anlysis of travel forecasts for new starts projects. |
Discussion #3 – Evaluation of Highway Capacity Congestion Relief Benefits (Word) |
,Information Sheet
|
05-30-06 |
FTA's evaluation of the FHWA's highway congestion relief benefits. |
Discussion #4 – Ridership and User Benefits from Variable Trip Tables (Word) |
,Information Sheet
|
06-06-06 |
Ridership and user benfits from variable trip tables. |
Discussion #4 – Spreadsheet example of user benefits calculation from variable trip tables (Excel) |
,Flowchart
|
02-25-02 |
Collection of different models used by the FTA in calculations for user benefits. |
Discussion #5 – Ridership and User Benefits from Variable Trip Ends (Land Use and Economic Development) (Word) |
,Information Sheet
|
06-12-06 |
Ridership and user benfits from variable trip ends. |
Discussion #6 – Predicted and Actual Ridership of Proposed New Starts Projects (Word) |
,Information Sheet
|
06-06-06 |
Predicted and actual ridership of proposed new starts projects. |
Discussion #7 – Library of Survey Data for Quality Control on Forecasts for New Starts Projects [Doc] |
,Information Sheet
|
06-13-06 |
Library of survey data for quality control on forecasts for new starts projects. |
Discussion #8 – CTPP-based Aggregate Model (Word) |
,Information Sheet
|
06-06-06 |
CTPP-based aggregate model. |
Discussion #9 – Semi-independent Forecasts of Ridership and User Benefits for New Starts Projects (Word) |
,Information Sheet
|
06-06-06 |
Semi-independant forecasts of ridershipand user benefits for new starts projects. |
DKI Engineering and Consulting [PDF] |
,Information Sheet
|
02-29-08 |
DKI engineering capabiltiies. |
DMJM Harris AECOM [PDF] |
,Information Sheet
|
12-20-07 |
DMJM Harris capabilities. |
Do you Want ot Build a Facililty with Federal Funds |
,Meeting,Presentation
|
11-28-07 |
Presentation detailing planning procedures and requirements for buildings contructed with federal funds. |
Do You Want to Build a Facility with Federal Funds? [DOC] |
,Information Sheet
|
11-28-07 |
Presentation detailing planning procedures and requirements for buildings contructed with federal funds. |
Documented Categorical Exclusion (DCE) Worksheet - FTA / FHWA Co-Lead |
,Forms
|
05-13-08 |
DCE worksheet for the FTA and FHWA. |
Documented Categorical Exclusion (DCE) Worksheet - FTA Lead |
,Forms
|
05-13-08 |
FTA CE and DCE worksheet to meet NEPA requirements. |
Documented Categorical Exclusion (DCE) Worksheet - FTA Lead |
,Forms
|
05-13-08 |
FTA CE and DCE worksheet. |
Documented Categorical Exclusion Checklist |
,Checklist,Forms
|
05-17-10 |
Checklist to determine categorical exclusion eligibility. |
DOT Guidance on Special Language Services to LEP Beneficiaries |
,Guidelines
|
01-03-06 |
Federal register volume 70 number 239. |
DOT Order to Address Environmental Justice |
,Environment,Guidelines
|
01-27-05 |
OST docket number OST-95-141 (50125). |
DRAFT FTA Guidance on the Application of 49 U.S.C. 5324(c) to Railroad ROW Acquisition |
,Guidelines,Information Sheet
|
12-29-08 |
Details how the FTA recommends grantess implement the ROW program. |
Draft Operating and Maintenance Costs Chapter |
,Guidelines,Report
|
12-20-06 |
Breakdown of the operating and maintenance costs for FTA projects. |
EAC CONSULTING CAPABILITY STATEMENT [PDF] |
,Information Sheet
|
05-20-08 |
EAC consulting capabiltities staement. |
ECHO Web User Manual for FTA and FAA Grantees |
,User Guide
|
05-24-12 |
ECHO web 2010 update for the grantee users manual. |
Elements of Internal Controls - Preventing Fraud Waste and Abuse |
,Meeting,Presentation
|
10-22-07 |
Presentation on preventing fraud, waste, and abuse in transit systems. |
Elements of Internal Controls - Preventing Fraud Waste and Abuse in Urban and Rural Transit Systems [DOC] |
,Information Sheet
|
11-28-07 |
Details on preventing fraud, waste, and abuse in transit systems. |
Embezzlement 101 |
,Meeting,Presentation
|
11-02-07 |
Embezzlement 101 presentation. |
Embezzlement 101 [DOC] |
,Information Sheet
|
11-28-07 |
Embezzlement education document. |
Endangered Species Act (ESA) Handbook [PDF] |
,User Guide
|
12-31-07 |
Description of the ESA and how it affects the FTA. |
Endangered Species Act (ESA) Screening Checklist [PDF] |
,Checklist
|
08-06-03 |
FTA ESA screeing checklist for grantees. |
Endangered Species Act Compliance [PDF] |
,Final Guidance
|
08-06-03 |
Descripion of how the ESA impacts Sound Transit projects. |
Environmental Analysis Framework |
,Information Sheet
|
06-03-04 |
Environmental framework for federal tranportation recovery projects in lower manhattan. |
Environmental Analysis Framework |
,Guidelines
|
06-03-04 |
Evironmental analysis framwork for federal transportation recovery projects in lower manhattan. |
Environmental Assessment FONSI Format [PDF] |
,Final Guidance
|
01-04-01 |
Format and appproval for a FONSI. |
Environmental Assessment Signature Page [PDF] |
,Final Guidance,Forms
|
01-26-11 |
EA signature page. |
Environmental Benefits of Alternative Fuels and Advanced Technology in Transit |
,Meeting
|
08-09-07 |
Detailed report showing the impact of fuel efficiency and lower emissions. |
Environmental Determination Re-Evaluation Checklist [PDF] |
,Checklist
|
08-06-03 |
Report to aid sponsoring agencies in gathering and organizing materials for re-evaluation under the ESA. |
Environmental Justice [PDF] |
,Final Guidance
|
08-06-03 |
Report describing the ESa and its effect on Sound transit projects. |
Environmental Justice Executive Order |
,Executive Order
|
02-08-05 |
Order from the president for evironmental protection in minority and low income populations. |
Environmental Performance Commitments |
,Information Sheet
|
03-07-07 |
Lower Manhattan FTA proposed commitments to evironmental safety. |
Environmental Protection Agency - Transportation and Brownfields |
,Fact Sheet,Information Sheet
|
07-07-00 |
Transportation and brownfields EPA project. |
Environmental Re-Evaluation Process [PDF] |
,Final Guidance
|
08-06-03 |
Report about the steps needed to ensure the ESA is complied with during sound transit projects. |
Essential Fish Habitat [PDF] |
,Final Guidance
|
09-06-01 |
MSA - EFH report. |
Eugene, OR: Lane Transit District |
,Information Sheet
|
04-10-07 |
LTD EMX BRT expasnionand information publication. |
Excel File |
,Fact Sheet,Guidelines,Information Sheet
|
06-10-98 |
FTA scope and activity line item codes. |
Executive Order 11988 |
,Executive Order
|
05-24-77 |
Floodplain mangement executive order. |
FAQs |
,Fact Sheet
|
03-10-10 |
Alternative transportation in parks and public lands FaQs. |
FAQs |
,Fact Sheet,Information Sheet
|
01-17-07 |
Frequently Asked Questions: Alternative Transportation in Parks and Public Lands |
Feasibility Study on the Use of Personal GPS Devices in Paratransit |
,Information Sheet,Report
|
05-27-09 |
Report detailing the pros and cons to GPS devices in paratransit. |
February 2008 Transit Research Update |
,News Update
|
02-26-08 |
Complete update for 2008 of all ongoing FTA programs and assignments. |
Federal Register Notice |
,Information Sheet
|
12-18-09 |
ARRA public transit on indian reservations program project selections. |
Federal Transit Administration Cooperative Agreement, FTA C(11) October 1, 2004 |
,Agreements
|
10-01-04 |
FTA c-11 agreement. |
Federal Transit Administration Cooperative Agreement, FTA C-12, October 1, 2005 |
,Agreements
|
10-01-05 |
FTA C-12 agreement. |
Federal Transit Administration Cooperative Agreement, FTA C-13, October 1, 2006 |
,Agreements
|
10-01-06 |
FTA C-13 agreement. |
Federal Transit Administration Grant Agreement, FTA G(11) October 1, 2004 |
,Agreements
|
10-01-04 |
FTA G-11 agreement. |
Federal Transit Administration Grant Agreement, FTA G-12, October 1, 2005 |
,Agreements
|
10-01-05 |
FTA G-12 agreement. |
Federal Transit Administration Grant Agreement, FTA G-13, October 1, 2006 |
,Agreements
|
10-01-06 |
FTA G-13 agreement. |
Federal Transit Administration Master Agreement, FTA MA(11), October 1, 2004 |
,Agreements
|
10-01-04 |
FTA master agreement revision 11. |
Federal Transit Administration Master Agreement, FTA MA(12), October 1, 2005 |
,Agreements
|
10-01-05 |
FTA master agreement revision 12. |
Federal Transit Administration Master Agreement, FTA MA(13), October 1, 2006 |
,Agreements
|
10-01-06 |
FTA master agreement revision 13. |
Federal Transit Administration Master Agreement, FTA MA(9), October 1, 2002 |
,Agreements
|
10-01-02 |
FTA master agreement revision 9. |
Federal Transit Administration Supplemental Agreement, Attachment to FTA G-12, October 1, 2005 |
,Agreements
|
11-07-05 |
FTA supplemental grant agreement. |
Federal Transit Administration Supplemental Agreement, Attachment to FTA G-13, October 1, 2006 |
,Agreements
|
10-06-05 |
FTA supplemental grant agreement. |
Federal Transit Administration Supplemental Agreement, FTA S(11) October 1, 2004 |
,Agreements
|
10-01-04 |
FTA supplemental agreement G-11. |
Federal Transit Programs - Fiscal Year 2004 Requirements |
,Agreements
|
10-15-03 |
FTA fiscal year 2004 certifications and assurances report. |
Federal Transit Programs Fiscal Year 2005 Requirements |
,Fact Sheet,Guidelines,Information Sheet
|
09-15-04 |
FTA programs fiscal year 2005 requirements. |
Federal Transit Programs Fiscal Year 2006 Citations |
,Fact Sheet
|
11-07-05 |
Fiscal year 2006 listing of all legislation changes. |
Federal Transit Programs Fiscal Year 2007 Citations |
,Information Sheet
|
10-02-06 |
Fiscal year 2007 listing of all legislation changes. |
Figure 1: Map of New Starts Projects with Pending and Full Funding Grant Agreements [PDF] |
,Agreements
|
01-03-03 |
Pending and existing full funding grants agreements map. |
Figure 2: Map of New Starts Projects in Preliminary Engineering and Final Design [PDF] |
,Flowchart
|
12-13-02 |
FTA map of new starts projects in prelinimary engineering and final design. |
Final Design (FD) Process Requirements Checklist [Word] |
,Checklist
|
05-01-08 |
Checklist of FTA project submittals to enter final design. |
Financial Management Oversight |
,Meeting,Presentation
|
04-18-07 |
FMO presentation. |
Financial Review Lessons |
,Meeting,Presentation
|
11-26-07 |
Financial management lessons learned presentation. |
Fiscal Year 2011 Annual List of Certifications and Assurances for Federal Transit Administration Grants and Cooperative Agreements |
,Information Sheet
|
10-29-10 |
Cosolidation of certificates and assurances summaries and reports. |
Flexible Fund Obligations by Area, with State Totals |
,Fact Sheet,Information Sheet
|
10-01-02 |
Flexible fund obligations by area with state totals. |
Flexible Fund Obligations by FTA Grantee |
,Fact Sheet,Flowchart,Information Sheet
|
10-01-02 |
Flexible fund obligations by FTA grantee |
Flexible Fund Obligations for Transit Projects by Purpose and by Fund Type -- FY 1992 - 2002 |
,Flowchart
|
10-01-03 |
Pie chart describing the flexible fund breakdown for 1992 through 2002. |
Flexible Fund Obligations for Transit Projects by Purpose and by Population Group -- FY 1992 - 2002 |
,Fact Sheet,Flowchart
|
10-01-02 |
Flexible fund ibligations for transit projects by purpose and by population group. |
Flexible Fund Obligations for Transit Projects by Purpose and by Program -- FY 1992 - 2002 |
,Flowchart
|
10-01-02 |
Flexible fund obligations for transit projects bye purpose and by program. |
Flexible Fund Obligations, by State and Fiscal Year |
,Fact Sheet,Information Sheet
|
10-01-02 |
Flexible fund obligations by state and fiscal year. |
Flexible Fund Projects by State |
,Fact Sheet,Flowchart,Information Sheet
|
10-01-02 |
Flexible fund projects by state. |
Flexible Fund Transfers, by State and Fiscal Year |
,Fact Sheet,Information Sheet
|
10-01-02 |
Flexible fund tranfers by state and year. |
Flexible Fund Utilization FY 1992 - 2002 |
,Fact Sheet
|
10-01-02 |
Fiscal year flexible fund breakdown. |
FMO Seminar Workbook - Day One |
,Presentation,Workbook
|
04-19-07 |
Seattle FMO seminar presentation. |
FMO Seminar Workbook - Day Two |
,Presentation,Workbook
|
04-19-07 |
Seattle FMO seminar presentation. |
FTA - New Start Risk Assessment Process (PPT) |
,Meeting,Presentation
|
04-05-04 |
FTA presentation about risk and risk assessment. |
FTA - New Start Risk Assessment Process (Word) |
,Meeting,Presentation
|
05-18-05 |
FTA documentation about risk and risk assessment. |
FTA 101 Training |
,Guidelines,Training
|
06-17-10 |
State programs team FTA 101 training presentation. |
FTA BPA Ordering Procedures |
,Fact Sheet,Information Sheet
|
06-08-05 |
Description of the method to use the BPA in 2005. |
FTA BPA Recipients |
,Information Sheet
|
05-26-05 |
2005 BPA contractor listing. |
FTA Construction Roundtable: AirTrain Presentation [DOC] |
,Meeting,Presentation
|
05-03-04 |
Report on AirTrain for JFK Airport |
FTA Construction Roundtable: AirTrain Presentation [PPT] |
,Meeting,Presentation
|
05-03-04 |
Power Point Presentation on AirTrain For JFK Airport. |
FTA Fiscal Year 2005 Appportionments, Allocations and Program Information: Notice |
,Fact Sheet,Information Sheet
|
12-13-04 |
Fiscal year 2005 JARC program allocations and amounts. |
FTA Fiscal Year 2005 Requirements compared to Fiscal Year 2004 |
,Information Sheet
|
09-21-04 |
Comparison of fical year 2004 and 2005 grant agreements. |
FTA Fiscal Year 2007 Requirements compared to Fiscal Year 2006 |
,Agreements,Information Sheet
|
11-02-05 |
Fical year 2006 and 2007 comparison of grante agreements. |
FTA FY 2006 Strategic Business Plan Summary |
,Fact Sheet
|
07-26-06 |
FTA fiscal year 2006 strategic business plan summary. |
FTA General Acquisition & Relocation Brochure |
,Brochure
|
07-20-06 |
Details about the FTA's aquisition and relocation program. |
FTA Guidance on the Application of 49 U.S.C. 5324(c) to ROW Acquisition |
,Guidelines,Information Sheet
|
04-29-09 |
FTA guidelines on achieving ROW aquisition. |
FTA National Fuel Cell Bus Program Projects |
,Presentation
|
09-27-07 |
Consolidation of all fuel cell bus programs managed by the FTA. |
FTA New Starts Project Development Process |
,Meeting,Presentation
|
12-13-06 |
Detailed look at the development process for new starts projects. |
FTA New Starts Project Development Process [DOC] |
,Information Sheet
|
11-28-07 |
Detailed look at the development process for new starts projects. |
FTA Performance Measurement Policy Statement |
,Information Sheet
|
07-26-06 |
Breakdown of the FTA's policy on performance measurements. |
FTA Region IV - Day 1 State Programs Meeting Summary |
,Meeting
|
09-13-07 |
GRTA board room minutes for the FTA region IV state programs meeting. |
FTA Region IV Conference Program |
,Meeting,Presentation
|
05-28-08 |
FTA Region IV 2008 Conference – “The Route to Success… Today and Beyond!” |
FTA Region IV Earmark Process Flow Chart |
,Flowchart,Workshop
|
03-31-09 |
Flowchart depicting earmark grants and how they are awarded. |
FTA Research Requirements |
,Meeting,Presentation
|
04-10-07 |
FTA research requirements presentation. |
FTA Ridership Symposium Charlotte Presentation 052808 |
,Presentation
|
05-19-08 |
Ridership gains strategies presentation. |
FTA Ridership Symposium Nashville 52808 |
,Presentation
|
05-28-08 |
FTA ridership symposium luncheon presentation on the Nashville MTA. |
FTA State of Good Repair Summit Presentation |
,Presentation
|
08-01-08 |
FTA state of good repair presentation. |
FTA’s SOGR Potential Concepts |
,Information Sheet
|
07-19-10 |
FTA's stae of good repai program goals and concepts. |
Full Funding Grant (FFGA) Agreement Process Requirements Matrix Template [PDF] |
,Forms
|
08-06-03 |
Region X FFGA application checklist. |
Full Funding Grant Agreement (FFGA) Checklist [Word] |
,Checklist
|
05-01-08 |
New starts project planning and dvelopment checlist. |
Functional IT [PDF] |
,Information Sheet
|
02-29-08 |
Functional IT statement of capabilities. |
FY 2005 Capital Program - New Starts Obligations, by Category for UZAs |
,Road Map
|
10-01-05 |
Fiscal year 2005 capital program obligations for new starts. |
FY 2005 Metropolitan Planning and State Planning and Research Program Apportionments Table 2 |
,Fact Sheet,Information Sheet
|
10-01-05 |
Section 5303 and 5313(b) apportionments. |
FY 2005 to FY 2006 Comparison |
,Fact Sheet,Information Sheet
|
08-02-06 |
Fical year 2006 year over year comparison. |
FY 2006 and 2007 Certifications & Assurances for Tribal Transit Program (Word Doc) |
,Agreements
|
05-10-07 |
2006-2007 Tribal Certifications and Assurances Document |
FY 2006 Certs and Assurances |
,Agreements
|
05-01-06 |
Fiscal year 2006 FTA certifications and assurances document. |
FY 2006 to FY 2007 Comparison |
,Fact Sheet
|
08-02-06 |
Fiscal year 2007 year-over-year comparison. |
FY 2008 - Prior Year Unobligated Sec 5309 New Starts Allocations (Revised) |
,Fact Sheet,Information Sheet
|
10-01-08 |
Revised year unobligated section 530- new starts allocations. |
FY 2008 - Section 5309 New Starts Allocations |
,Fact Sheet,Information Sheet
|
10-01-08 |
Fiscal year 2008 new starts allocations by state. |
FY 2009 New Starts and Small Starts Evaluation and Rating Process |
,Fact Sheet,Information Sheet
|
07-02-07 |
FTA's evaluation process for small and new starts projects in deatil. |
FY 2010 Financial Management Oversight Registration Form |
,Forms
|
01-25-10 |
2010 FTA FMO seminar registration form. |
FY 2010 FTA Program Updates and ARRA Phase II Presentation |
,Presentation,Proposal Profile,Report
|
11-06-09 |
FTA region IV fiscal year 2010 updates and ARRA phase II presentation. |
FY 2010 Implementation Form |
,Forms
|
04-14-10 |
Transit in the parks program proposal form. |
FY 2010 Program Planning Form |
,Forms
|
04-14-10 |
Transit in the parks program planning form. |
FY 2010 Proposal Guidance |
,Guidelines
|
04-14-10 |
FTA proposal guidance for the transit in the parks program. |
FY 2010 Proposal Guidance |
,Guidelines
|
04-14-10 |
Guidance for project proposals. |
FY 2011 FMO Seminar Schedule |
,Information Sheet
|
11-19-10 |
Fiscal year 2011 FMO seminar dates and locations. |
FY 2011 Master Agreement |
,Agreements
|
11-17-10 |
Tribal transit master agreement. |
FY 2011 Master Agreement |
,Agreements
|
10-06-10 |
Tribal transit master agreement. |
FY 2011 SPT Annual Meeting Presentations |
,Meeting
|
01-26-11 |
Region IV state programs team meeting. |
FY 2011 Transit in the Parks Program Implementation Proposal Form |
,Forms
|
04-26-11 |
Paul S. Sarbanes Transit in Parks Program (Transit in the Parks Program) Implementation Project - Proposal for Fiscal Year 2011 Funds |
FY05 Section 5309 Bus and Bus-Related Allocations |
,Fact Sheet,Information Sheet
|
10-01-05 |
FTA revised bus allocations for fiscal year 2005. |
FY2008 Appendix A |
,Agreements
|
10-25-07 |
Federal fiscal year 2008 certifications and assurances for FTA assistance programs. |
FY2011 Financial Management Oversight Agenda |
,Meeting
|
12-01-10 |
FMO seminar breakdown of events. |
FY2011 FMO Registration Packet |
,Brochure
|
12-01-10 |
Fiscal year 2011 FMO seminar registration documentation. |
Gallegos Capability Statement [WORD] |
,Information Sheet
|
12-20-07 |
Bardwell capabilities statement. |
Gannett Fleming [PDF] |
,Information Sheet
|
12-14-07 |
Gannett flemming capabilities. |
Genco Systems [PDF] |
,Information Sheet
|
02-29-08 |
GENCO systems repsonse to FTA project management oversight solicitation. |
Geographical Assignments |
,Fact Sheet,Information Sheet
|
05-09-11 |
Geographic assignment changes for 2011. |
Global Solutions [PDF] |
,Information Sheet
|
02-29-08 |
Global solutions capabilities statement. |
Grant Recipients |
,Information Sheet
|
08-05-03 |
Grant recipient list for TRO-9 recipients. |
GreatLakes |
,Fact Sheet,Information Sheet
|
07-26-06 |
Cumulative Flexible Fund Transfers For all FTA Programs (FY 1992-2002) |
Guidelines and Standards for Assessing Local Financial Commitment |
,Guidelines
|
06-29-07 |
Guidelines and standards for assessing local financial commitment. |
Guidelines and Standards for Assessing Transit-Supportive Land Use |
,Guidelines
|
05-24-04 |
FTA transit guidelines for assisted living land use. |
HALCROW INC CAPABILITY STATEMENT [PDF] |
,Information Sheet
|
05-29-08 |
Halcrow inc FTA capabilities statement. |
HATCH MOTT MACDONALD CAPABILITY [PDF] |
,Fact Sheet,Information Sheet
|
05-01-08 |
HMM project management oversight services experience and description. |
Heavy Rail (PPT) |
,Meeting,Presentation
|
05-04-04 |
HEAVY RAIL TRANSIT CAPITAL COST STUDY |
Heavy Rail (Word) |
,Meeting,Presentation
|
05-04-04 |
HEAVY RAIL TRANSIT CAPITAL COST STUDY |
How to Prepare a Research Publication 2008 |
,Guidelines,Report
|
05-13-08 |
Documentation detailing the way in which to prepare a research report for the FTA. |
How to Succeed in Statewide and MPO Transportation Planning |
,Information Sheet
|
06-08-06 |
MPO transportation planning process breakdown. |
How to Succeed in Statewide and MPO Transportation Planning [DOC] |
,Information Sheet
|
11-28-07 |
MPO transportation planning process breakdown. |
HSH [PDF] |
,Information Sheet
|
02-04-08 |
HSH capabilities statement. |
Hudson-Bergen Light Rail (PPT) |
,Meeting,Presentation
|
05-04-04 |
Construction Update: Hudson-Bergen Light Rail |
ICOR Partners [PDF] |
,Information Sheet
|
12-20-07 |
ICOR Partners LLC capabilities statement. |
Impact of Flexible Funds on Major FTA Programs |
,Fact Sheet,Information Sheet
|
10-01-03 |
Table detailing the impact flexible fundning has on major FTA programs. |
Implementation Plan Road Map |
,Road Map
|
02-12-07 |
Proposed initiative roadmap. |
Implementing Title VI Requirements in Metropolitan and Statewide Planning |
,Information Sheet
|
10-07-99 |
FTA report on implementing title vi requirements in metropolitan and statewide planning. |
Innovative Financing: Meeting the Needs for Capital |
,Presentation
|
05-19-08 |
Presentation describing various innovations for meeting the funding needs of a project. |
INTERACTIVE ELEMENTS [PDF] |
,Information Sheet
|
12-20-07 |
Interactive elements capabilities statement. |
ITS Architecture Guidance Update |
,Final Guidance
|
07-26-05 |
Details about the ITS architecture update. |
JACOBS [PDF] |
,Fact Sheet,Information Sheet
|
12-20-07 |
Jacobs capabilities statement. |
January - February 2009 Transit Research Update |
,News Update
|
03-03-09 |
January - February 2009 transit research update for all FTA research projects. |
January - February 2010 Transit Research and Industry News Update |
,News Update
|
03-03-10 |
January - February 2010 transit research and industry news update for the FTA. |
January 2008 Transit Research Update |
,News Update
|
02-11-08 |
FTA research update for all FTA projects. |
Job Access/Reverse Commute Programs - By State and by Program |
,Information Sheet
|
02-24-04 |
JARC commute recipients and amounts by state and category. |
Job Access/Reverse Commute Programs - By UZA and by Program |
,Information Sheet
|
02-24-04 |
JARc obligations by population group and UZA complete breakdown. |
Job Access/Reverse Commute Programs - National Totals by Program and Population Group |
,Information Sheet
|
07-16-05 |
Fiscal year 2004 JARC obligations and funding by population group. |
Job Access/Reverse Commute Programs - Vehicle Purchase by State and by Type |
,Information Sheet
|
02-24-05 |
Fiscal year 2004 JARC vehicular obliations by state. |
Joint Development |
,Meeting,Presentation
|
10-22-07 |
FTA joint Development Presentation. |
Joint Development [DOC] |
,Information Sheet
|
11-28-07 |
Joint development presentation. |
July 2007 - Transit Research Update |
,News Update
|
08-01-07 |
2007 Transit research update by region. |
July 2008 Transit Research Update |
,News Update
|
08-14-08 |
2008 FTA research update. |
June 2008 Transit Research Update |
,News Update
|
07-16-08 |
2008 transit research update. |
June 4 Meeting in Toronto |
,Information Sheet
|
06-04-07 |
Transit reseearch agenda roundtable discussion. |
Kal Krishnan Consulting Services [PDF] |
,Information Sheet
|
12-13-07 |
Kal Krishan Consulting services capabilities within the FTA. |
KJM Capability Statement [WORD] |
,Information Sheet
|
03-21-08 |
KJM capabilities statement. |
KY Medicaid Brokering FTA Atlanta |
,Meeting,Presentation
|
09-13-07 |
Kentucky human service transportation presentation. |
LEA [PDF] |
,Information Sheet
|
12-20-07 |
Statement of Capabilities for Project Management Oversight Services |
Legislative Text |
,Fact Sheet,Legislation
|
11-08-05 |
Legislative text for new freedom program in SAFETEA-LU. |
Lessons for the U.S. Transit Industry |
,Meeting,Presentation
|
03-19-07 |
Power Point Presentation on Transportation in South America |
Letter from Dick Doyle |
,Policy Letter
|
05-16-08 |
Dear colleague letter and invitation to the FTA region 1 symposium on increasing ridership. |
Limited English Proficiency Executive Order |
,Executive Order
|
02-08-05 |
Exceutive order asking for improved access to services for persons with limited english proficiency. |
Litigating in the Dark FTA Roundtable (PPT) |
,Meeting,Presentation
|
05-04-04 |
Presentation on the WMATA 14th street tunnel case. |
Litigating in the Dark FTA Roundtable (Word) |
,Meeting,Presentation
|
05-04-04 |
Presentation on the WMATA 14th stree tunnel case. |
LMI [PDF] |
,Information Sheet
|
02-04-08 |
LMI capabilities statement. |
Local Approaches: Birmingham MPO Presentation |
,Meeting,Presentation
|
03-23-07 | presented by Darrell Howard |
Log of Changes |
,Checklist
|
03-30-06 |
Documentation of changes made to the ALI tree. |
March 2008 Transit Research Update |
,News Update
|
03-11-08 |
2008 transit research update. |
March 2009 Transit Research Update |
,News Update
|
04-02-09 |
2009 transit research update. |
March 2010 Transit Research and Industry News Update |
,Information Sheet
|
04-07-10 |
2010 transit research update. |
Marketing |
,Meeting,Presentation
|
02-15-07 |
Marketting presentation condensed slides. |
Mass Mailings List [XLS] |
,Fact Sheet,Information Sheet
|
10-10-08 |
Region II mass mailings publications. |
May 2008 Transit Research Update |
,News Update
|
05-01-08 |
2008 transit research update |
May 23 Meeting in Reno |
,Information Sheet
|
05-23-07 |
Developing a cooperative research agenda roundtable discussion. |
May 6 Meeting in Nashville |
,Information Sheet
|
05-06-07 |
A roundtable discussion of transit safety and operational issues. |
MCKISS [PDF] |
,Information Sheet
|
12-20-07 |
McKissack Group capabilities statement. |
Memorandum of Understanding |
,Agreements
|
06-03-04 |
Environmental coordination and review among the federal partnerts of the FTFRNYC environmental review comitee. |
Memorandum of Understanding (MOU) [PDF] |
,Agreements
|
08-06-03 |
Memorandum of understanding among the FTA, FHWA, WSDOT, and ST. |
Memorandum of Understanding LMRO |
,Fact Sheet
|
06-03-04 |
Memorandum of understanding environmental coordination and review among the FTRNYCEPRC. |
MILLIGAN CAPABILITY [PDF] |
,Information Sheet
|
12-20-07 |
Milligan and company capabilities statement. |
Minimizing Delays in Grant Application Submission and Helpful Tips in Grant Management |
,Meeting,Presentation
|
10-22-07 |
Presentation on minimizing delays in grant application submisson. |
Minimizing Delays in Grant Application Submission and Helpful Tips in Grant Management [DOC] |
,Information Sheet
|
11-28-07 |
Presentation on minimizing delays in grant application submission. |
Mississippi Statewide Coordinated Plan Approach |
,Meeting,Presentation
|
03-23-07 |
Presentation about the Mississippi approach to coordinated planning. |
MR [PDF] |
,Information Sheet
|
01-03-08 |
MR capabilities statement. |
Multi-Year Research Program Plan Development |
,Meeting,Presentation
|
11-28-07 |
Breakdown the MYPP what it is and what it does. |
National Environmental Policy Act (NEPA) Scoping [PDF] |
,Final Guidance
|
08-06-03 |
Clarification of requirements for NEPA scoping and a public involvement process. |
National Fuel Cell Bus Program Solicitation |
,Guidelines
|
04-11-06 |
FTA solicitation guidelines. |
NC Coordinated Planning -NCDOT |
,Meeting,Presentation
|
10-18-07 |
Presentation format bullets for the NCDOT coordinated transportation initiative. |
Nearshore Habitat Assessment Data Report: Appendix F |
,Information Sheet
|
07-01-05 |
Nearshore habitat assessment data report for Pacific International Engineering. |
New Employee Orientation Form |
,Guidelines,Information Sheet,Instructions
|
07-12-06 |
This form is used to determine your acceptability for Federal and Federal contract employment |
New Freedom Program: SAFETEA-LU Fact Sheet |
,Fact Sheet
|
10-07-05 |
FTA authorization fact sheet for the new freedom program. |
New FTA Ridership Award Program |
,Award or Honor,Information Sheet
|
10-16-06 |
New FTA redership award program. |
New Grantee Checklist |
,Checklist
|
07-20-07 |
Region IV new grantee checklist. |
New Grantee Checklist |
,Checklist
|
11-27-07 |
FTA region IV new grantee checklist. |
New Grantee Handbook |
,User Guide
|
04-25-11 |
FTA new grantee handbook. |
New Grantee Handbook: 05 - Attachment A - General Title VI Requirements for all FTA Recipients |
,Accessibility,Guidelines,User Guide
|
02-05-09 |
Description of required documentation under Title VI. |
New Grantee Handbook: 06 - Attachment B - Title VI and Title VI-Dependent Guidelines for FTA Recipients |
,Guidelines,Information Sheet
|
05-13-07 | FTA Circular 4702.1A |
New Grantee Package: 01 - Cover Letter [DOC] |
,Forms,Information Sheet
|
03-01-07 |
Cover |
New Grantee Package: 02 - Introduction [DOC] |
,Fact Sheet,Information Sheet
|
03-01-07 |
Introduction |
New Grantee Package: 03 - Table of Contents [DOC] |
,Checklist
|
03-01-07 |
Table of Contents |
New Grantee Package: 04 - New Tribal Grantee Letter [DOC] |
,Award or Honor,Information Sheet,Policy Letter
|
03-01-07 |
Steps needed to finalize FTA grant reception. |
New Grantee Package: 05 - Attachment A - Sample Tribal Council Resolution [DOC] |
,Information Sheet
|
03-01-07 |
Resolution Draft |
New Grantee Package: 06- Attachment B - FY 2007 Certifications and Assurances [DOC] |
,Agreements,Forms
|
03-01-07 |
Federal fiscal years 2006 and 2007 certifications and assurances for FTA. |
New Grantee Package: 07 - Attachment C - Fiscal Year 2007 Tribal Transit Program Master Agreement [DOC] |
,Agreements
|
03-01-07 |
Oulines grant agreements authorized by 49 U.S.C. § 5311(c)(1). |
New Grantee Package: 08 - Attachment D - Dear Collegue Letter for DUNS Number [DOC] |
,Policy Letter
|
03-01-07 | Dun & Bradstreet Data Unviersal Numbering System (DUNS) |
New Grantee Package: 09 - Attachment E - Request for Addition to TEAM Electronic Grant-making System Vendor File [XLS] |
,Forms
|
03-01-07 |
Request for addition to vendor file award in TEAM, FTA's electronic grant-making system. |
New Grantee Package: 10 - Attachment F - TEAM User Access Request Forms and Instructions [PDF] |
,Forms,Instructions
|
03-01-07 |
Transportation Electronic Award Management System (TEAM) Grantee/ Recipient User Access Request. |
New Grantee Package: 11 - Attachment G - Electronic Clearinghouse Operation (ECHO) Web Registration Letter [DOC] |
,Forms,Instructions,Policy Letter
|
03-01-07 |
Announcement of the ECHO system and registration deadlines. |
New Grantee Package: 12 - Attachment H - Instruction for Electronic Clearinghouse Operation (ECHO) User Set-up Forms (Financial) [DOC] |
,Forms
|
03-01-07 |
Detailed ECHO user setup and request intstructions. |
New Grantee Package: 13 - Attachment I - Electronic Clearinghouse Operaion (ECHO) Web User Authorization and Certification Forms [DOC] |
,Forms
|
03-01-07 |
Authorization for users in ECHO to recieve and manipulate information. |
New Grantee Package: 14 - Attachment J - Electonic Clearinghouse Operation (ECHO) Web User Request Form [XLS] |
,Forms
|
03-01-07 |
Information collection for grantee ECHO setup. |
New Grantee Package: 15 - Attachment K - Electronic Clearinghouse Operation (ECHO) Web Rules of Conduct Form [PDF] |
,Forms
|
03-01-07 |
ECHO web rules of conduct agreement. |
New Grantee Package: 16 - Attachment L - Electronic Clearinghouse Operation (ECHO) User Manual [PDF] |
,User Guide
|
03-01-07 |
ECHO grantee users manual and forms list. |
New Grantee Package: 17 - Attachment M - Payment Information Form and Instructions |
Forms
|
04-30-08 | Financial payment information. |
New Grantee Package: 18 - Attachment N - Documented Categorical Exclusion (DCE) Worksheet [DOC] |
,Forms,Information Sheet
|
03-01-07 | Environmental Information worksheet used to assist in determining the environmental classification for a proposed project. |
New Grantee Package: 19 - Attachment O - Endangered Species Act (ESA) Screening Checklist [DOC] |
,Checklist
|
03-01-07 | Environmental documentation needed for construction projects. |
New Grantee Package: 20 - Attachment P - Procurement Requirements and Sources of Information [DOC] |
,Checklist,Guidelines
|
03-01-07 |
Links to procurment requirements. |
New Jersey - 22nd Transit Construction Roundtable Highlights |
,Meeting
|
04-18-06 |
Meeting minutes for the twenty-second transit construction roundtable. |
New Starts - Small Starts |
,Presentation
|
10-22-07 |
New starts and small starts presentation. |
New Starts - Small Starts [DOC] |
,Information Sheet
|
11-28-07 |
New starts and small starts presentation. |
New Starts in Final Design, Preliminary Engineering and Project Development 2010 |
,Flowchart
|
07-15-10 |
Summary of fiscal year 2011 new starts ratings. |
New Starts Program Assessment Appendix B: Assessment of Analogous Project Delivery Processes |
,Meeting,Presentation
|
12-28-04 |
Assessment of the effectiveness of the new starts program. |
New Starts Templates - Excel |
,Forms
|
07-01-09 |
Excel templates for new starts projects. |
New Starts Templates Certification of Technical Assumptions and Land Use Information - Word |
,Forms,Guidelines
|
07-09-08 |
Certification that the new starts grantee understands the planning assumptions. |
New Starts: Contractor Performance Assessment Report - August 2006 |
,Policy Letter
|
08-23-06 |
FTA's report adress contractor performance. |
NJT - Diesel Multiple Unit (PPT) |
,Meeting,Presentation
|
05-01-04 |
Presentation on diesel/Electric moltiple units. |
NJT - Diesel Multiple Unit (Word) |
,Meeting,Presentation
|
05-01-04 |
Presentation on diesel/electric multiple units. |
Noise Methodology and Criteria [PDF] |
,Final Guidance
|
08-06-03 |
Noise analysis guidance by the EAT |
November - December 2007 Transit Research Update |
,News Update
|
01-16-08 |
Complete update for 2007 of all FTA research projects. |
November 2008 Transit Research Update |
,News Update
|
11-13-08 |
FTA 2008 transit research update. |
November 2009 Transit Research and Industry News Update |
,News Update
|
12-07-09 |
FTA 2009 transit research update. |
NTI Fellows Application |
,Information Sheet,Workshop
|
01-01-94 |
NTI Fellows program. |
October 2007 - Transit Research Update |
,News Update
|
11-21-07 |
FTA 2007 transit research update. |
October 2008 Transit Research Update |
,News Update
|
11-03-08 |
FTA 2008 transit research update. |
October 2009 Transit Research and Industry News Update |
,News Update
|
11-10-09 |
FTA 2009 transit research update. |
Opportunity to Showcase Transit Tecnologies in India |
,Information Sheet
|
08-20-07 |
India showcase of transit opportunities and technologies. |
Overview |
,Meeting,Presentation
|
02-15-07 |
An Overview of Bus Rapid Transit (BRT) in the United States and Lessons Learned from South America |
Overview of Proposed EJ Circular | |||
Overview of Proposed Title VI Circular | |||
Overview: FTA Research Programs |
,Meeting,Presentation
|
04-17-07 |
Presentation breaking down the FTA research programs in each step. |
Parsons [PDF] |
,Information Sheet
|
12-19-07 |
Messer Bardwell and Harper capabilities statement. |
PBSJ [PDF] |
,Information Sheet
|
12-20-07 |
PBSJ capabilities statement. |
PDF File |
,Fact Sheet,Guidelines,Information Sheet
|
03-30-06 |
FTA scope and activity line item codes list. |
Pedestrian and Transit-Friendly Design: A Primer for Smart Growth |
,Presentation,Report
|
08-05-99 |
Pedestrian friendly transit design manual prepared for Florida DOT, and published by American Planning Association. |
Phenix Data Solutions [PDF] |
,Information Sheet
|
12-19-07 |
FTA pheonix data solutions capabilities statement. |
PM Preview [PDF] |
,Information Sheet
|
12-01-07 |
PM preview capabilities statement. |
PMA Services [PDF] |
,Information Sheet
|
12-19-07 |
PMA consultants FTA capabilities. |
PRAIRIE [PDF] |
,Information Sheet
|
12-20-07 |
Prairie quest consulting capabilities statement. |
Preamble to the Certs |
,Agreements
|
11-09-05 |
Annual assurances and certifications list. |
Preliminary Engineering (PE) Checklist [Word] |
,Checklist
|
10-22-09 |
New starts project planning and development checklist. |
Presentation #1 (PDF) |
,Presentation
|
06-15-06 |
Travel forecasting for new starts presentation. |
Presentation #2 (PDF) |
,Presentation
|
06-15-06 |
Part 2 f the presentation on new stats projects. |
PRICEWATERHOUSECOOPERS CAPABILITY [PDF] |
,Information Sheet
|
12-20-07 |
PwC statement of oversight capabilities. |
Pricing guide for FTA Grantees |
,Guidelines
|
05-19-03 |
A tool in helping the Grantees obtain more for their contracting dollar. |
Prior Year Unobligated Section 5309 Bus and Bus-Related Allocations Table 9A |
,Fact Sheet,Information Sheet
|
10-01-06 |
Prior year unobligated section 5309 bus and bus-related allocations. |
Procurement Oversight Review and You [DOC] |
,Information Sheet
|
11-28-07 |
Outline of how the procurment oversight reviews work for the transit agency. |
Profiles of 511 Traveler Information Services Update 2007 [DOC] |
,Meeting
|
08-22-07 |
Description of updates to the 511 information system in 2007. |
Profiles of 511 Traveler Information Services |
,Information Sheet
|
05-31-06 |
Report of the similarities and uniqueness of the various 511 systems in the country. |
Profiles of 511 Traveler Information Services (2009) |
,Guidelines,Report
|
06-23-09 |
511 infomration update for 2009 coverage and cost. |
Program Fact Sheet |
,Fact Sheet,Information Sheet
|
10-07-05 |
FTA authorization fact sheet. |
Program Planning Professionals [PDF] |
,Information Sheet
|
12-18-07 |
Pcubed capabilities statement. |
Program Rollout: Questions & Answers - June 28, 2007 |
,Fact Sheet,Presentation
|
05-15-07 |
Section 5310 and JARC program rollout Q and A. |
Program Rollout: Questions & Answers - June 28, 2007 |
,Fact Sheet,Information Sheet
|
06-27-07 |
JARC and new frieedom project Q and A |
Project Aide [PDF] |
,Information Sheet
|
12-14-07 |
Project aide capabilities statement. |
Project Time and Cost [PDF] |
,Information Sheet
|
12-19-07 |
Project time and cost capablities statement for FTA. |
Public Hearing Requirements [PDF] |
,Final Guidance,Guidelines
|
02-07-02 |
FTA sound tranist public hearing requirements. |
Purpose of Visits |
,Meeting,Presentation
|
03-20-07 |
South America BRT Technical Tour February 2007 |
QUANDEL CONSULTANTS CAPABILITY [PDF] |
,Information Sheet
|
05-05-08 |
Quandel capabilities statement for FTA. |
Quarterly Reports Template |
,Forms
|
10-01-07 |
Quarterly progress report. |
Questions and Answers from the FY 2010 GM Call |
,Information Sheet
|
11-12-09 |
Q and A session with FTA general managers. |
RAUL V BRAVO AND ASSOCIATES CAPABILITY STATEMENT [PDF] |
,Information Sheet
|
06-02-08 |
FTA capabilities statement. |
Region 3 Strategic Plan [PDF] |
,Fact Sheet,Information Sheet
|
08-03-03 |
FTA region 3 specific strategic plan. |
Region IV FY 2009 Bulletin |
,Information Sheet
|
11-10-09 |
FTA region IV fiscal year 2010 bulletin. |
Region IV FY 2011 Bulletin |
,Information Sheet
|
10-28-10 |
Fiscal year 2011 region IV bullentin. |
Region IV State Program Meeting - Day 1 |
,Meeting,Presentation
|
09-13-07 |
FTA state programs meeting presentation. |
Region IV State Program Meeting - Day 2 |
,Meeting,Presentation
|
09-14-07 |
FTA region IV state programs meeting. |
Region IV State Programs Team Meeting - April 15-16 - Atlanta, GA |
,Meeting
|
04-15-09 |
State programs team meeting agenda. |
Region IV State Programs Team Meeting Agenda - Atlanta, GA - April 2009 |
,Meeting,Presentation
|
04-15-09 |
FTA state programs meeting final agenda. |
Regional Advisory 2007-02 |
,Fact Sheet,Information Sheet
|
10-16-06 |
Dear colleague advisory letter. |
Regional Advisory No. 2008-01 |
,Information Sheet,Policy Letter
|
10-17-07 |
Dear colleague advisory letter. |
Regional Advisory No. 2008-02 |
,Information Sheet,Policy Letter
|
10-17-07 |
Dear colleague advisory letter. |
Regional Advisory No. 2008-05 |
,Information Sheet,Policy Letter,Region 1
|
01-28-08 |
Dear colleague advisory letter. |
Regional Advisory No. 2008-06 |
,Information Sheet,Policy Letter,Region 1
|
04-22-08 |
Dear colleague advisory letter. |
Regional Advisory No.. 2008-04 |
,Policy Letter
|
12-12-07 |
Dear colleague advisory letter. |
Regional FMO Checklist |
,Checklist
|
04-30-04 |
Financial package checklist to ensure FMO completion. |
Reporting Instructions for the Section 5309 New Starts Criteria |
,Instructions
|
07-01-08 |
Section 5308 New starts reporting criteria. |
Required Supplemental PDF |
,Forms
|
01-04-11 |
Applicant & Proposal Profile |
Required Supplemental PDF |
,Forms
|
09-28-11 |
Applicant and Proposal Profile (Bus and Bus Facilities Program) |
Required Supplemental PDF |
,Forms
|
09-28-11 |
Applicant and Proposal Profile (Bus and Bus Facilities Program) |
Required Supplemental PDF |
,Forms
|
03-03-11 |
Applicant and Proposal Profile (Public Transportation on Indian Reservations Program) |
Required Supplemental PDF |
,Forms
|
09-28-11 |
Applicant and Proposal Profile for TIGGER applicants |
Required Supplemental PDF |
,Forms
|
09-28-11 |
Applicant and Proposal Profile (Over The Road Bus Accessibility Program) |
Required Supplemental PDF |
,Forms
|
01-04-11 |
Applicant & Proposal Profile |
Required Supplemental PDF |
,Forms
|
09-28-11 |
Applicant and Proposal Profile (alternative analysis program). |
Research Quality |
,Meeting,Presentation
|
04-04-07 |
Deatils and guidlines on how to produce quality research. |
Revised FY 2000 Section 5309 Bus Allocations |
,Bus and Paratransit Systems,Fact Sheet
|
12-13-99 |
Fiscal year 200 bus allocations. |
Revision 10 and Release Notes - May 07 |
,Information Sheet
|
05-07-07 |
Title VI revision Notes. |
Ridership Awards Application Form (2009) |
,Forms
|
11-05-08 |
FTA 2009 ridership awards application form. |
Ridership Symposium |
,Fact Sheet
|
05-28-08 |
Planning, Marketing and OperatingThe Three Legs of the Ridership Stool |
SAFETEA-LU Authorization Fact Sheet: Metropolitan & Statewide Planning Programs [PDF] |
,Fact Sheet,Reauthorization
|
09-01-05 |
FTA authorization fact sheet. |
SAFETEA-LU Guidelines & Coordinated Planning Guidance |
,Meeting,Presentation
|
03-23-07 |
Coordinated planning and united we ride workshop presentation. |
SAFETEA-LU Implementation: SAFETEA-LU Fact Sheet |
,Fact Sheet
|
10-07-05 |
New starts capital investment grants fact sheet. |
SAFETEA-LU Implementation: SAFETEA-LU Fact Sheet for Indian Reservations |
,Fact Sheet,Information Sheet
|
10-08-05 |
FTA authorization fact sheet public tranist on indian reservations. |
Safety and Security Presentation |
,Presentation
|
09-13-07 |
FTA Safety and Security Programs |
Sample Agreements: FY 2011 Master Agreement |
,Agreements
|
10-08-10 |
Sample FTA master agreement. |
Sample Making the Case: New York 2nd Ave Subway |
,Information Sheet
|
08-20-04 |
Making the case 2nd avenue subway, FTA sample. |
Sample Making the Case: Pittsburgh North Shore Connector |
,Fact Sheet,Information Sheet
|
03-11-05 |
Pittsburg North connector development proposal. |
Schedule of SAFETEA-LU Deliverables |
,Checklist,Fact Sheet
|
09-28-07 |
SAFETEA-LU implementation schedule. |
School Bus Information |
,Brochure,Information Sheet
|
01-19-05 |
An FTA brouchure about how the FTA helps fund certain school bus programs. |
SEA Capability Statement [PDF] |
,Information Sheet
|
03-17-08 |
SEA capabilities statement. |
Section 106 Historic Preservation Compliance [PDF] |
,Final Guidance,Information Sheet
|
08-06-03 |
Historic preservation compliance paper. |
Section 4(f) & 6(f) Compliance [PDF] |
,Final Guidance
|
08-06-03 |
Sound transit issue paper. |
Section 5310 Program Performance |
,Information Sheet
|
10-07-10 |
Transportation for the Elderly and Persons with Disabilities (Section 5310 Program) Annual Data Collection & Analysis FY: 2008 – 2009 |
Seismic Design [PDF] |
,Final Guidance
|
11-01-01 |
Seismic analysis under NEPA. |
Self-Assessment Form |
,Forms
|
11-18-05 |
Internal control self assessment form for FTA grantees. |
September 2007 - Transit Research Update |
,News Update
|
10-01-07 |
2007 FTA transit research update. |
September 2008 Transit Research Update |
,News Update
|
09-30-08 |
September transit research update. |
September 2008 Transit Research Update |
,News Update
|
10-08-08 |
2008 FTA transit research update. |
Session 5a (pdf) |
,Meeting,Presentation
|
10-09-07 |
FTA travel forecasting for new starts presentation. |
Session 5b (pdf) |
,Meeting,Presentation
|
10-09-07 |
Pathbuilder Calibration with Data on Ridership Patterns |
Sessions 10-16 (PowerPoint) |
,Meeting,Presentation
|
09-01-07 |
FTA presentation for session 10-16. |
Sessions 1-4 (pdf) |
,Meeting,Presentation
|
09-19-07 |
Travel Forecasting for New Starts |
Sessions 6-9 (PowerPoint) |
,Meeting,Presentation
|
09-04-07 |
FTA Requirements for New Starts Reporting |
Shaw Environmental and Infrastructure [PDF] |
,Information Sheet
|
12-19-07 |
Shaw capabilities statement. |
Side by Side of Reporting Requirements for the Evaluation of New Starts, Small Starts, Very Small Starts, and Exempt Projects |
,Fact Sheet
|
06-19-07 |
Required information for new and small starts evaluation and rating. |
Small Starts Impact -- January 2006 |
,Policy Letter
|
08-23-06 |
Small starts impact asessment. |
Small Urban & Rural Transit Center |
,Meeting,Presentation
|
08-17-04 |
Plan to develope a center to adress the transit needs of people in urban and rural locations. |
Southern Iowa Transit v Ottumwa Transit Authority May 24, 2000 (PDF) |
,Fact Sheet,Information Sheet
|
05-24-00 |
FTA complaint filing resolution. |
Southern Iowa Transit v Ottumwa Transit Authority May 24, 2000 (Word) |
,Fact Sheet,Information Sheet
|
05-24-04 |
FTA complaint resolution statement. |
Stantec Consulting Services [PDF] |
,Information Sheet
|
02-29-08 |
Santec description of company and capabilities within the FTA. |
State Programs Team - ARRA Phase II Bulletin - September 30, 2009 |
,Fact Sheet,Information Sheet
|
09-30-09 |
Team ARRA phase II bulletin. |
State Programs Team Bulletin - July 2008 |
,Fact Sheet,Information Sheet
|
07-11-08 |
State programs team bulletin for 2008. |
State Programs Team Meeting Agenda, Charlotte, NC |
,Fact Sheet,Information Sheet,Instructions
|
04-08-08 |
FTA state programs meeting agenda and venue. |
State Programs Team Quarterly Call Summary - December 2008 |
,Fact Sheet,Meeting
|
12-11-08 |
FTA region IV December 2008 updates. |
State Transit Program Manager's Guide: Administration & Oversight of FTA Grant Programs |
,User Guide
|
06-03-08 |
Adminitration and oversight of FTA grant programs guide. |
Statement of Work/Request for Proposal |
,Information Sheet
|
06-07-05 |
Description of FTA functional areas. |
Statewide Coordinated Plan: Alabama Regional Councils |
,Meeting,Presentation
|
03-23-07 |
Human services coordinated transit plan. |
Statewide Program Meeting Agenda |
,Meeting
|
09-13-07 |
FTA state programs team meeting final agenda. |
STV CAPABILITY [PDF] |
,Information Sheet
|
01-02-08 |
STV solicitation letter. |
Successes in Enhancing Transit Ridership Awards |
,Fact Sheet,Information Sheet
|
04-24-08 |
FTA criteria for the transit ridership awards. |
Table 1 - 2007 Appropriations for Grant Programs (Excel) |
,Information Sheet
|
07-29-07 |
Fiscal year 2007 grant program appropriations and apportionments. |
Table 10 - 2007 FGM Apportionments (Excel) |
,Information Sheet
|
07-01-07 |
Section 5309 fixed guideway modernizaiont apportionments. |
Table 11 - FGM Formula (Excel) |
,Information Sheet
|
10-01-07 |
The fixed guideway modernization funding formula created by the FTA. |
Table 12 - 2007 Bus and Bus Facility Allocations (Excel) |
,Information Sheet
|
10-01-07 |
Section 5309 bus and bus facility allocations. |
Table 13 - Prior Year Bus and Bus Facility Allocations (Excel) |
,Information Sheet
|
02-02-07 |
Unobligated funds of prior years breakdown. |
Table 14 - 2007 New Starts Allocations (Excel) |
,Information Sheet
|
10-01-07 |
Section 5309 new starts project allocations. |
Table 15 - New Starts Carryover FY2007 (Excel) |
,Information Sheet
|
10-01-07 |
Unobligated section 5309 new starts allocations. |
Table 16 - 2007 Elderly and Disabled (Excel) |
,Information Sheet
|
10-01-07 |
Section 5310 special needs for eldler and disabled individuals apportionments. |
Table 17 - 2007 Nonurban and RTAP (Excel) |
,Information Sheet
|
10-01-07 |
Section 5311 and section 5340 apportionments. |
Table 18 - 2007 National Research Program Allocations (Excel) |
,Information Sheet
|
10-01-07 |
National research programs allocaitons. |
Table 19 - 2007 JARC Apportionments (Excel) |
,Information Sheet
|
10-01-07 |
Section 5316 JARC program apportionments. |
Table 2 - 2007 Metropolitan and State Planning Apportionment (Excel) |
,Information Sheet
|
10-01-07 |
Section 5303 metropolitan transit planning program and section 5304 statewide transit planning apportionments. |
Table 20 - Prior Year Unobligated JARC Allocations (Excel) |
,Information Sheet
|
10-01-07 |
Prior year unobligated JARC allocations. |
Table 21 - 2007 New Freedom (Excel) |
,Information Sheet
|
10-01-07 |
Section 5317 new freedom apportionments. |
Table 22 - 2007 Alternative Analysis Allocations (Excel) |
,Information Sheet
|
10-01-07 |
Section 5339 alternatives analysis allocations. |
Table 23 - Alternative Analysis Carryover 2007 (Excel) |
,Information Sheet
|
10-01-07 |
Prior year unobligated section 5339 allocations. |
Table 3 - Sec 5307 UAF and 5340 Apportionments (Excel) |
,Information Sheet
|
10-01-07 |
Section 5307 and5340 urbanized area apportionments. |
Table 4 - sec 5307 Apportioment Formula (Excel) |
,Information Sheet
|
10-01-07 |
Section 5307 apportionment formula. |
Table 5 - Formula Grant Program Apportionment Data Unit Values (Excel) |
,Information Sheet
|
10-01-07 |
FISCAL YEAR 2007 FORMULA PROGRAMS APPORTIONMENT DATA UNIT VALUES |
Table 6 - Small Transit Intensive Cities (Excel) |
,Information Sheet
|
02-06-07 |
FY 2007 small transit intensive cities performance data and apportionments. |
Table 7 - Large UZAs Eligible for Operating Assistance (Excel) |
,Information Sheet
|
10-01-07 |
Large UZAs eligible for section 5307 funds for assisstance. |
Table 8 - 2007 Clean Fuels Allocations (Excel) |
,Information Sheet
|
10-01-07 |
Fiscal year 2007 section 5308 clean fuels program allocations. |
Table 9 - Clean Fuels Carryover 2007 (Excel) |
,Information Sheet
|
10-01-07 |
2006 unobligated section 5308 clean fuels allocations. |
TEAM |
,Presentation,Training
|
04-16-07 |
FTA team GUI presentation. |
TEAM Access instructions 05-09-08 |
,Forms
|
05-21-07 |
TEAM grant reciepient UAR. |
TEAM Access User Form [DOC] |
,Forms
|
08-06-03 |
Request for new user for FTA team system. |
TEAM User Guide 03-11-08 |
,User Guide
|
03-11-08 |
TEAM User Guide |
Technical Breakout Session |
,Information Sheet
|
06-03-08 |
Technical breakout session agenda and times. |
The ALLEN GROUP CAPABILITY STATEMENT [PDF] |
,Information Sheet
|
05-11-08 |
The allen group capabilities statement. |
The Americans with Disabilities Act |
,Meeting,Presentation
|
07-16-04 |
The Americans with Disabilities Act: Lessons Learned from FTA Compliance Reviews |
The Americans with Disabilities Act [DOC] |
,Information Sheet
|
11-28-07 |
ADA overview and DOT effects. |
THE BURNS GROUP CAPABILITY [PDF] |
,Information Sheet
|
04-23-08 |
Burns group capabilities statement. |
The History of Envision Utah |
,Presentation,Report
|
12-03-01 |
The role that transit-oriented development is playing in shaping the community and affecting economic growth. |
The MCCRAY Group [PDF] |
,Information Sheet
|
02-29-08 |
The Mccray group inc. capabilities statement. |
TIGGER Collector Quick Reference Guide for Applicants |
,Guidelines
|
07-09-10 |
TIGGER collector reference guide for applicants. |
Title VI of the Civil RIghts Act of 1964 [DOC] |
,Information Sheet
|
11-28-07 |
Title VI compliance guidance. |
Title VI of the Civil Rights Acts of 1964 |
,Meeting,Presentation
|
03-09-06 |
Title VI compliance guidance. |
TOD Lessons Learned |
,Information Sheet
|
10-07-10 | – Results of FTA’s Listening Sessions With Developers, Bankers, and Transit Agencies on Transit Oriented Development. |
TRACS Advisory Committee Charter [PDF] |
,Information Sheet
|
11-24-09 |
Charter creating the tranist rail advisory comittee for safety |
Transit Facility Checklist |
,Checklist
|
03-30-09 | The Transit Facility Checklist is a guide to help grantees understand the many requirements of using Federal funds for developing a transit facility. |
Transit in Parks Program Manual |
,User Guide
|
01-09-07 |
Alternative transportation in parks and public lands presentation. |
Transit Safety and Security Courses |
,Information Sheet
|
04-22-08 |
List of security and safety courses and applicable positions. |
Transit Signal Priority: A Planning and Implementation Handbook |
,User Guide,Workbook
|
10-20-05 |
A guide book for traffic engineers and transit planners about Transit Signal Priority (TSP) implementation. |
Translating Your Cost Estimate Into the SCC Format |
,Guidelines,Instructions
|
11-07-05 |
Excel Spreadsheet: Translating Your Cost Estimate into the FTA SCC Format |
Transmilenio |
,Meeting,Presentation
|
03-15-07 |
TransMilenio: Transportation project in Colombia. |
Transportation Economic Land Use System (TELUS) for Transit |
,Information Sheet
|
09-11-08 |
TELUS for transit condensed report. |
Travel Forecasting for New Starts: Workshop Agenda (Excel) |
,Information Sheet
|
09-19-07 |
Travel forecasting workshop for new starts projects agenda. |
TRC CAPABILITY STATEMENT [PDF] |
,Information Sheet
|
12-20-07 |
TRC capabilities statement. |
TRI-20 Overview (Powerpoint) |
,Meeting,Presentation
|
05-15-08 |
FTA research programs presentation. |
TRI-30 Overview (Powerpoint) |
,Meeting,Presentation
|
12-09-98 |
Description of the Office of Research Management and its purpose. |
Tribal Historic Preservation Office - Suquamish Indian Tribe of the Port Madison Reservation |
,Fact Sheet,Information Sheet
|
11-09-07 |
Naotional park service approves the suquamish tribe to assume SHPO functions. |
Tribal Transit Program Master Agreement |
,Agreements
|
06-21-06 |
FTA tribal transit program master agreement. |
Tribal Transit Program Notice of Funding Availability: Solicitation of Grant Proposals for FY 2011 Tribal Transit Program Federal Register notice |
,Information Sheet
|
07-25-11 |
Federal Register |
Tribal Transit Program Procedures - August 2006 Federal Register Notice |
,Information Sheet
|
08-15-06 |
Federal Register. |
Tribal Transit Workshop Registration Form |
,Forms
|
12-06-10 |
2010 tribal transit workshop registration form. |
TSM/TDM [PDF] |
,Guidelines
|
10-04-01 |
Environmental justice implementation in minority and low income populations. |
U.S. Transportation Secretary Ray LaHood Announces New Transit Rail Advisory Committee for Safety |
,News Update,Rail Transit Vehicles and Systems,Safety
|
06-23-10 |
Panel is charged with laying the groundwork for drafting national safety measures for rail transit. |
United We Ride Technical Assistance Tools |
,Presentation
|
03-23-07 |
FTA technical assistance workshop for the UWR program. |
URBAN ENGINEERS CAPABILITY [PDF] |
,Information Sheet
|
12-20-07 |
Urban engineers capabilities statement. |
Urbanized Area Notes From Breakout |
,Information Sheet
|
02-28-07 |
Urbanized area strategies for JARC initiation. |
USDOT Brownfields Strategy Action Plan |
,Fact Sheet,Information Sheet
|
05-18-99 |
DOT brownfields strategy action plan. |
Valerie J. Southern Transportation Consultant [PDF] |
,Information Sheet
|
12-17-07 |
Valerie J. Southern - transportation consultant, LLC abreviated capability statement. |
Valley Transit Inc v Chicago Transit Authority Jan 14 1981 (PDF) |
,Information Sheet
|
03-05-05 |
Details about the case between valley transit and the CTA. |
Valley Transit Inc v Chicago Transit Authority Jan 14 1981 (Word) |
,Information Sheet
|
10-12-08 |
Details about the case between valley transit and the CTA. |
Value Engineering [PDF] |
,Final Guidance
|
01-09-01 |
FTA value engineering report. |
Vehicle Assist and Automation (VAA) RFP [PDF] |
,Information Sheet
|
11-26-07 |
VAA pilot program to weigh benefits and applications. |
WALLACE [PDF] |
,Information Sheet
|
01-09-07 |
Wallace capabilities statement. |
Washington State Ferries Wireless Connection Final Report |
,Information Sheet
|
08-29-05 |
Report on delivering high speed internet to the WSF tranist system. |
Web application |
,Forms
|
10-01-07 |
FTA successess in enhancing ridership award application. |
Webinar Presentation 1-16-07 (PDF) |
,Presentation
|
01-16-07 |
Alternative transportation in parks and public lands presentation. |
WONG1 [WORD] |
,Information Sheet
|
12-06-07 |
FTA PMO solicitation by PGH wong engineering. |
WSF, Appendix A |
,Information Sheet
|
08-15-05 |
WSF test performance apendix. |
WSF, Appendix B-1 |
,Information Sheet
|
10-04-05 |
Seattle/Bainbridge screen shot appendix. |
WSF, Appendix B-2 |
,Information Sheet
|
10-04-05 |
Washington State Ferries Evaluation Results, Wireless Connection Project |
WSF, Appendix C |
,Information Sheet
|
08-15-05 |
Kingston/Edmondss screen shots appendix. |
WSF, Appendix F |
,Information Sheet
|
08-18-05 |
WSF synopsis appendix. |