BPA Power Services
 
http://www.bpa.gov/power/
 
Link to BPA Home Page Skip Primary Navigation
Power Services Home Page

Firstgov
 
Power Rates
June 14, 2006
LB CRAC Workshop
(updated June 29, 2006)
 

 
Workshop Materials/Handouts
  1. June 5, 2006 Letter (workshop announcement)
    (PDF, 36 kb, posted June 7, 2006)
    [Note: The tentative LB CRAC follow-up workshop scheduled on June 23, 2006, was determined to be unnecessary.]
     
  2. Preliminary LB CRAC 9 True-Up Results (handout issued June 13, 2006)
    (PDF, 6 pages, 102 kb, posted here on June 29, 2006)
    [Notes: The document posted here was originally posted in the Power Rates Document "Queue" on June 13, 2006. It was reposted here without any changes (except for minor changes to the PDF file name and metadata).  This workshop was only required to establish the true-up adjustment for LB CRAC 9. Since no forward looking LB CRAC was determined, Table 1 and 3 - 8 (pages 2 - 5) are omitted from this workshop handout.  See the "Post Workshop Materials" below for the "Final" LB CRAC 9 true-up results and announcement letter.]
     
       - "Preliminary" LB CRAC 9 True-Up for October 2005 - March 2006
     
Post-Workshop Materials
  1. Final LB CRAC 9 True-Up Results (issued June 26, 2006)
    (PDF, 6 pages, 91 kb, posted here on June 29, 2005)
    [Notes: This workshop was only required to establish the true-up adjustment for LB CRAC 9. Since no forward looking LB CRAC was determined, Table 1 and 3 - 8 (pages 2 - 5) are omitted from the final LB CRAC results package.  The LB CRAC 9 true-up adjustment posted here is about $330,000 larger than the adjustment discussed in the June 14 workshop. The increase is due to issues identified and corrected during the independent auditor review of the LB CRAC 9 true-up calculations.]
     
      - "Final" LB CRAC 9 True-Up for October 2005 - March 2006
     
  2. June 28, 2006 Letter (announcement/summary of final LB CRAC 9 True-Up results)
    (PDF, 110 kb, posted June 29, 2006)
     
 

Archive of content originally posted or last updated on:  June 29, 2006
Content originally provided by:  Michael Normandeau, BPA Power Business Line.
Content provided by:  Greg Gustafson, 503-230-5820, gcgustafson@bpa.gov.
Page maintained by:  BPA Web Team.
Skip to start of content.  Access Key = C
Skip to short cut links below
Skip to start of content.  Access Key = C If you believe information on this site is missing or in error, please Submit that comment here.
NOTICE: This server is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel.