For 2012 |
I12-III-01 |
Reissue of I09-III-01- MSHA Procedures for Assigning Legal Identity Numbers and Relocation Notices at Auger and Highwall Mining
Operations |
I12-III-02 |
Criteria for Issuance and Maintenance of Special Investigation Credentials |
I12-IV-02 |
Reissue of I10-IV-01 - Determining compliance under 30 CFR §§ 56.5002 and 57.5002 |
I12-IV-03 |
Reissue of I10-V-11 - Procedures for Informing State Agencies When Dams are No Longer Subject to MSHA Jurisdiction. |
I12-IV-01 and I12-V-01 |
Transmittal of Tech Reports with Recommendations for Mine Operators |
I12-V-02 |
Pillar Recovery Design, Technologies and Proc. in RC Plan Reviews |
I12-V-03 and I12-IV-04 |
Reissue of I10-V-08 - Use of Digital Cameras and the Storage and Preservation of Digital Images |
I12-V-04 and I12-IV-05 |
Revision of Accident Investigation Procedures |
I12-V-05 and I12-IV-06 |
Enforcement Policy Reminder |
I12-V-07 |
Supplemental Roof Support Materials |
I12-V-08 |
Roof Bolt Spacing |
I12-V-09 |
Inspector Compliance with the Tracking Requirements of an Emergency Response Plan |
I12-V-10 |
Reissue of I10-V-13 - Inadequate Ventilation |
I12-V-11 |
Reissue of I10-V-09 - Procedures for Evaluation of Requests to Make Extended Cuts With Remote Controlled Continuous Mining Machines |
I12-V-12 |
Reissue of I10-V-12 - Maintaining Methane Monitors in Proper Operating Condition for Mining Equipment |
I12-V-13 |
Reissue of I10-V-14 - Maintaining Face Ventilation Control Devices |
I12-V-14 |
Procedure for Permitting the Use of Belt Air to Ventilate Working Sections of Underground Coal Mines |
I12-V-15 |
Reissue of I10-V-07 - Tensioned Cable Bolts |
I12-V-16 |
Reissue of I10-V-05 - Measuring Methane Levels at Underground Coal Mines Using Belt Air to Ventilate Working Sections |
I12-V-17 |
Reissue of I08-V-6 - Weekend E01 Inspections |
I12-V-18 |
Phasing Out CSE Corporation SR-100 Self-Contained Self-Rescuers and Enforcement |
I12-V-19 |
District Field Change Requests for Adding Proximity Detection Systems |
For 2011 |
I11-III-01
| MSHA Procedures for Assigning Legal Identity Numbers and Relocation Notices at Auger and Highwall Mining Operations |
I11-III-02
| Compliance Procedures for the Hazard Communication Standard |
I11-V-01
| Technical Support Assistance in Reviewing Roof Control Plans |
I11-V-02
| Fall Protection during Concrete Storage Silo Construction |
I11-V-03
| Fire Extinguishers with a 2-A:10-B:C Rating |
I11-V-04
| Installation of Permanent Stoppings on Working Sections |
I11-V-05
| Guidance on Issuance of Orders Under Sections 103(j) and (k) of the Mine Act |
I11-V-06
| Inspection of Post-Accident Communication and Electronic Tracking Systems |
I11-V-07
| Reissue of I09-V-07 - Mine Safety Appliances Life-Saver 60 Self-Contained Self-Rescuer |
I11-V-08
| Reissue I09-V-04 - Mine Safety and Health Administration (MSHA) Procedures for Properly Identifying Equipment in Official Agency Documents |
I11-V-09
| Updated Procedures for Inspection of Seals |
I11-V-10
| Mine Rescue Inspections Pertaining to Mine Rescue Teams and Mine Rescue Stations |
I11-V-11
| Part 100 Safety and Health Conference Procedures |