Federal Aviation Administration

AIP and PFC Funding Summary for Noise Compatibility Projects

« Back to Airport Noise

  • Total airports participating in the AIP: 275
  • Airports with AIP grants for Part 150 studies: 256
  • Approved Noise Compatibility Programs (first-time): 245
  • Revised / Amended Noise Compatibility Programs: 134
AIP and PFC Funding Summary through FY 2011
  Total AIP 1 Total PFC 2
Preparing Part 150 Studies $103,006,516 $12,499,788
Part 150 Implementation $5,718,265,215 $3,417,815,896

Notes:
1 Only AIP planning figures are used for the state-by-state listings. Note that multiple Noise Exposure Maps (NEMs) and Noise Compatibility Programs (NCPs) can mean that multiple grants have been awarded. These separate grant amounts are totalled into a single sum at the beginning of the new fiscal year reporting.

2 Impose or Use. PFC planning figures not reflected in detailed state-by-state listings.

Page Last Modified: 04/19/12 09:41 EDT

This page can be viewed online at: http://www.faa.gov/airports/environmental/airport_noise/part_150/funding/