|
Home | Cold Instr | Thermal Inst | Experiments | BeamTime | SiteMap |
NCNR Operating Schedule
The basic schedule of operations is a 7 week cycle entailing 38 days of operations followed by approximately 10 days of down time for maintenance.
To view the complete operating schedule, please visit the 2012 Schedule
Instrumentation Schedule
Ancillary Equipment
Thermal Neutron Instruments
- BT1 - high resolution powder diffractometer
- BT2 - neutron imaging facility
- BT4 - filter analyzer spectrometer
- BT4 - triple-axis spectrometer
- BT5 - Perfect Crystal Diffractometer (uSANS)
- BT7 - triple-axis spectrometer
- BT8 - residual stress diffractometer
Cold Neutron Instruments
- BT9 - Multiple Axis Crystal Spectrometer (MACS)
- NGD - Off-Specular Reflectometer (MAGIK)
- NGD - Polarized Beam Reflectometer/Diffractometer (PBR)
- NG2 - High Flux Backscattering Spectrometer (HFBS)
- NG4 - Disk chopper time-of-flight spectrometer (DCS)
- NG5 - Spin-polarized triple-axis spectrometer (SPINS)
- NG5 - Neutron Spin Echo spectrometer (NSE)
- NG6 - Neutron Physics End Station
- NG6U - Neutron Physics 0.89 nm
- NG6M - Neutron Physics 0.5 nm
- NG7 - Cold neutron reflectometer
- NG7 - Prompt Gamma Neutron Activation Analysis
- NG7 - Neutron Interferometer and Optics Facility
SANS Instruments
- NG3SANS - 30 m small angle scattering instrument, current cycle
- NG7SANS - 30 m small angle scattering instrument, current cycle
- BT5 - Perfect-Crystal Diffractometer (PCD), current cycle
- Schedules for all facility cycles on all SANS instruments
Last modified 05-September-2012 by website owner: NCNR (attn: Bill Kamitakahara)