Draft NRC Regulatory Guides - Power Reactors (Division 1)
This page lists the title of each recent Draft Regulatory Guide for Division 1, Power Reactors. Each draft guide listed is available online from this site. Comments on any regulatory guide may be submitted electronically.
See also Regulatory Guides for Division 1.
See Notes on Regulatory Guides for more information.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Task Number | Title | Publish Date |
---|---|---|
DG-1197 | Inservice Inspection of Prestressed Concrete Containment Structures with Grouted Tendons (ML081560507) |
04/2011 |
DG-1199 | Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors (ML090960464) | 10/2009 |
DG-1206 | Configuration Management Plans for Digital Computer Software used in Safety Systems of Nuclear Power Plants (ML103200044) | 08/2012 |
DG-1207 | Software Test Documentation for Digital Computer Software Used in Safety Systems of Nuclear Power Plants (ML083370243) | 08/2012 |
DG-1208 | Software Requirement Specifications for Digital Computer Software used in Safety Systems of Nuclear Power Plants (ML103120751) | 08/2012 |
DG-1209 | Software Requirement Specifications for Digital Computer Software used in Safety Systems of Nuclear Power Plants (ML103080963) | 08/2012 |
DG-1210 | Developing Software Lifecycle Processes for Digital Computer Software Used in Safety Systems of Nuclear Power Plants (ML103120727) | 08/2012 |
DG-1211 | Materials and Inspections for Reactor Vessel Closure Studs (ML082820439) | 04/2009 |
DG-1216 | Plant-Specific Applicability of Transition Break Size Specified in 10 CFR 50.46a (ML100430356) | 06/2010 |
DG-1220 | Performance-Based Containment Leak-Test Program (ML090490183) | 04/2009 |
DG-1245 | Inspection of Water-Control Structures Associated with Nuclear Power Plants (ML093060150) | 01/2011 |
DG-1253 | Preoperational Testing of Emergency Core Cooling Systems for Pressurized Water Reactors (ML110110480) | 05/2011 |
DG-1265 | Initial Test Program of Condensate and Feedwater Systems for Light-Water Reactors (ML112020111) | 03/2012 |
DG-1267 | Verification, Validation, Reviews, and Audits for Digital Computer Software in Safety Systems of Nuclear Power Plants (ML103160431) | 08/2012 |
DG-1268 | Preoperational Testing of Instrument and Control Air Systems (ML113180379) | 03/2012 |
DG-1270 | Evaluations of Explosions Postulated to Occur at Nearby Facilities and on Transportation Routes Near Nuclear Power Plant (ML110390554) | 07/2011 |
DG-1271 | Decommissioning of Nuclear Power Reactors (ML111360054) | 02/2012 |
DG-1274 | Design, Inspection, and Testing Criteria for Air Filtration and Adsorption Units of Postaccident Engineered-Safety-Feature Atmosphere Cleanup Systems in Light-Water-Cooled Nuclear Power Plants (ML11244A045) | 12/2011 |
DG-1277 | Initial Test Program of Emergency Core Cooling Systems for Boiling-Water Reactors (ML113550182) | 06/2012 |
DG-1280 | Design, Inspection, and Testing Criteria for Air Filtration and Adsorption Units of Normal Atmosphere Cleanup Systems in Light-Water-Cooled Nuclear Power Plants (ML11273A057) | 06/2012 |
DG-1282 | Fuel Oil systems for Emergency Power Supplies (ML121090447) | 06/2012 |
DG-1285 | An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis (ML12012A006) | 05/2012 |
DG-1286 | An Approach for Plant-Specific, Risk-Informed Decision-Making: Inservice Testing (ML12017A053) | 05/2012 |
DG-1287 | An Approach for Plant-Specific, Risk-Informed Decisionmaking: Technical Specifications (ML12017A054) | 05/2012 |
DG-1288 | An Approach for Plant-Specific, Risk-Informed Decisionmaking for Inservice Inspection of Piping (ML12017A076) | 05/2012 |
Page Last Reviewed/Updated Tuesday, August 21, 2012