Jump to main content.


Rule and Implementation Information for Flexible Polyurethane Foam Fabrication Operations


(Docket#A-2000-43)

Last Update

From the listing below, find the file you would like to download.

Rule Information              Technical formation          Implementation Information

Rule Information

Proposed and Promulgated Rules

Subpart MMMMM--National Emission Standards for Hazardous Air Pollutants: Flexible Polyurethane Foam Fabrication Operations
Date Citation Action Description File Download
08/08/01 66 FR 41717 Proposal Proposed rule for National Emission Standards for Hazardous Air Pollutants: Flexible Polyurethane Foam Fabrication Operations
04/14/03 68 FR 18061 Final National Emission Standards for Hazardous Air Pollutants: Flexible Polyurethane Foam Fabrication Operations; Final Rule

NOTES:All files are Government Printing Office (GPO) files unless otherwise indicated.

Closely Related Rules, Policies or Program Guidance

Other  


Technical Information

Background Information Document (BID)/Response to comments

FACT Sheets

FACT SHEET for Proposed NESHAP: Flexible Polyurethane Foam Fabrication Operations
FACT SHEET for Final NESHAP: Flexible Polyurethane Foam Fabrication Operations

Implementation Information

Implementation Documents

Source Identification and Location Information

Outreach and Training Materials

Permitting Information

Compliance and Enforcement Information

NOTE: The 4/14/2003 FR final rule gives existing loop slitters 1 year after that date to comply, or by 4/14/2004. Existing flame lamination sources have no emission limit, and thus no compliance date, but should have submitted an initial notification no later than 120 days after 4/14/2003, or by 8/12/2003.


Local Navigation


Jump to main content.