Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BRAIDWOOD 1 |
100 |
|
|
|
|
BRAIDWOOD 2 |
95 |
|
100% ELECTRICAL CAPABILITY |
|
|
BYRON 1 |
82 |
|
DECREASING TO APPROXIMATELY 79% POWER TO PERFORM TURBINE THROTTLE AND GOVERNOR VALVE TESTING |
* |
|
BYRON 2 |
100 |
|
|
|
|
CLINTON 1 |
0 |
12/15/2001 |
MAINTENANCE OUTAGE - EVALUATING POST-MAINTENANCE TESTING FOLLOWING THE REPAIR OF THE 'A' RECIRCULATION FLOW CONTROL VALVE - PREPARING TO ENTER MODE 2 |
* |
|
COOK 1 |
100 |
|
|
|
|
COOK 2 |
100 |
|
|
|
|
DAVIS BESSE 1 |
100 |
|
|
|
|
DRESDEN 2 |
64 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM RECIRCULATION FLOW RESPONSE TESTING AND CONTROL ROD SWAPS |
* |
|
DRESDEN 3 |
0 |
12/10/2001 |
MAINTENANCE OUTAGE |
|
|
DUANE ARNOLD 1 |
93 |
|
HOLDING POWER AT MAXIMUM PER INTERIM POWER UPRATE |
|
|
FERMI 2 |
95 |
|
INCREASING POWER AFTER DECREASING TO 65% POWER TO PERFORM CONTROL ROD PATTERN ADJUSTMENTS |
* |
|
KEWAUNEE 1 |
95 |
|
HOLDING POWER AT THIS LEVEL UNTIL THE PLANT PROCESS COMPUTER IS RESTORED |
|
|
LASALLE 1 |
98 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
LASALLE 2 |
87 |
|
DECREASING TO APPROXIMATELY 84% POWER TO PERFORM TURBINE CONTROL VALVE TESTING |
* |
|
MONTICELLO 1 |
40 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM CONTROL ROD DRIVE SCRAM TESTING AFTER EXITING A REFUELING OUTAGE |
* |
|
PALISADES 1 |
0 |
06/20/2001 |
MAINTENANCE OUTAGE |
|
|
PERRY 1 |
0 |
12/15/2001 |
AUTOMATIC REACTOR SCRAM FROM 100% POWER, EMERGENCY CORE COOLING SYSTEM ACTUATIONS, AND BALANCE-OF-PLANT ISOLATIONS BECAUSE THE REACTOR RECIRCULATION PUMPS DOWN SHIFTED TO SLOW SPEED FOR UNKNOWN REASONS (Refer to event #38575) |
* |
1 |
POINT BEACH 1 |
98 |
|
|
|
|
POINT BEACH 2 |
98 |
|
|
|
|
PRAIRIE ISLAND 1 |
100 |
|
|
|
|
PRAIRIE ISLAND 2 |
100 |
|
|
|
|
QUAD CITIES 1 |
35 |
|
HOLDING POWER AT THIS LEVEL TO PERFORM CONDENSER WORK |
* |
|
QUAD CITIES 2 |
100 |
|
|
|
|