Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
|
|
Braidwood 2 |
86 |
|
INCREASING POWER |
* |
|
Byron 1 |
90 |
|
INCREASING POWER AFTER TURBINE TESTING |
* |
|
Byron 2 |
95 |
|
HOLDING FOR FUEL CONDITIONING |
* |
|
Clinton |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
99 |
|
INCREASING POWER AFTER TURBINE TESTING |
* |
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Dresden 3 |
99 |
|
100% ELECTRICAL CAPABILITY |
|
|
Duane Arnold |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Fermi 2 |
100 |
|
|
|
|
Kewaunee |
100 |
|
|
|
|
La Salle 1 |
100 |
|
|
|
|
La Salle 2 |
100 |
|
|
|
|
Monticello |
100 |
|
|
|
|
Palisades |
0 |
05/08/2007 |
HEATUP IN PROGRESS |
* |
|
Perry 1 |
19 |
|
SYNCING GENERATOR TO GRID |
* |
|
Point Beach 1 |
100 |
|
|
|
|
Point Beach 2 |
55 |
|
REDUCED POWER FOR PLANNED WORK ON FEED AND CONDENSATE SYSTEM |
|
|
Prairie Island 1 |
0 |
05/11/2007 |
FEEDWATER PUMP REPAIR IN PROGRESS |
|
|
Prairie Island 2 |
100 |
|
|
|
|
Quad Cities 1 |
0 |
05/04/2007 |
REFUELING OUTAGE |
|
|
Quad Cities 2 |
96 |
|
100% ELECTRICAL CAPABILITY |
|
|