Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Browns Ferry 1 |
0 |
03/03/1985 |
CORE LOADED CAVITY FLOODED
500 KV (TRINITY AND MADISON) LINES OUT OF SERVICE |
|
|
Browns Ferry 2 |
86 |
|
COASTDOWN TO REFUELING OUTAGE
500 KV (TRINITY AND MADISON) LINES OUT OF SERVICE |
* |
|
Browns Ferry 3 |
100 |
|
500 KV (TRINITY AND MADISON) LINES OUT OF SERVICE |
|
|
Brunswick 1 |
100 |
|
|
|
|
Brunswick 2 |
99 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
Catawba 1 |
100 |
|
|
|
|
Catawba 2 |
100 |
|
|
|
|
Crystal River 3 |
100 |
|
|
* |
|
Farley 1 |
100 |
|
|
|
|
Farley 2 |
100 |
|
|
|
|
Harris 1 |
100 |
|
|
|
|
Hatch 1 |
0 |
01/30/2007 |
REPAIR CONDENSER TUBE LEAK |
|
|
Hatch 2 |
96 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
McGuire 1 |
100 |
|
|
|
|
McGuire 2 |
100 |
|
|
|
|
North Anna 1 |
100 |
|
|
|
|
North Anna 2 |
100 |
|
|
|
|
Oconee 1 |
100 |
|
|
|
|
Oconee 2 |
100 |
|
|
|
|
Oconee 3 |
88 |
|
INCREASING POWER FOLLOWING TURBINE VALVE TESTING |
* |
|
Robinson 2 |
100 |
|
|
|
|
Saint Lucie 1 |
100 |
|
|
|
|
Saint Lucie 2 |
100 |
|
|
|
|
Sequoyah 1 |
100 |
|
|
|
|
Sequoyah 2 |
100 |
|
|
|
|
Summer |
95 |
|
HOLDING FOR FEEDWATER BOOSTER PUMP REPAIR |
* |
|
Surry 1 |
100 |
|
|
|
|
Surry 2 |
100 |
|
|
|
|
Turkey Point 3 |
100 |
|
|
|
|
Turkey Point 4 |
100 |
|
|
|
|
Vogtle 1 |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Vogtle 2 |
100 |
|
|
|
|
Watts Bar 1 |
100 |
|
|
|
|
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
COLD WEATHER ALERT UNTIL 02/05/07 |
* |
|
Braidwood 2 |
100 |
|
COLD WEATHER ALERT UNTIL 02/05/07 |
* |
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
100 |
|
|
|
|
Clinton |
96 |
|
100% ELECTRICAL CAPABILITY
OFFSITE POWER SOURCE MAINTENANCE (LATHAM LINE ) ON 02/03 -02/10 |
* |
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
96 |
|
100% ELECTRICAL CAPABILITY |
* |
|
Dresden 3 |
97 |
|
100% ELECTRICAL CAPABILITY |
* |
|
Duane Arnold |
93 |
|
COASTDOWN TO REFUELING OUTAGE
MAXIMUM GENERATION ALERT 02/04 - 02/06 |
* |
|
Fermi 2 |
93 |
|
TURBINE CONTROL VALVE POWER SUPPLY MAINTENANCE |
* |
|
Kewaunee |
95 |
|
HEATER DRAIN PUMP MAINTENANCE
LIMITED TO 99% FOR FEED FLOW MEASURING INSTRUMENT CALIBRATION |
|
|
La Salle 1 |
100 |
|
|
|
|
La Salle 2 |
93 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
Monticello |
100 |
|
SYSTEM CONDITION YELLOW - CLEAR MAINTENANCE WITH DISPATCH |
* |
|
Palisades |
100 |
|
|
|
|
Perry 1 |
68 |
|
ROD PATTERN ADJUSTMENT |
* |
|
Point Beach 1 |
100 |
|
SYSTEM ALERT DUE TO COLD WEATHER |
* |
|
Point Beach 2 |
100 |
|
SYSTEM ALERT DUE TO COLD WEATHER |
* |
|
Prairie Island 1 |
100 |
|
SYSTEM CONDITION YELLOW - CLEAR MAINTENANCE WITH DISPATCH |
* |
|
Prairie Island 2 |
100 |
|
SYSTEM CONDITION YELLOW - CLEAR MAINTENANCE WITH DISPATCH |
* |
|
Quad Cities 1 |
97 |
|
100% ELECTRICAL CAPABILITY
COLD WEATHER ALERT |
* |
|
Quad Cities 2 |
96 |
|
100% ELECTRICAL CAPABILITY
COLD WEATHER ALERT |
* |
|