EA-04-234 - Good Samaritan Regional Medical CenterMarch 31, 2005 EA 04-234 Peter Bergman
Dear Mr. Bergman: This letter refers to the routine unannounced NRC inspection conducted at your facility in Pottsville, Pennsylvania on November 17 and 23, 2004, as well as an in-office review of information you provided to the NRC in letters dated November 29 and December 21, 2004. Based on the inspection, twelve apparent violations of NRC requirements were identified. The results of the inspection were discussed with you and members of your staff during an exit meeting following the inspection on November 23, 2004. The findings were also provided to your new Radiation Safety Officer, Dr. Stephen Whitmoyer, on January 20, 2005. On January 27, 2005, we sent you a letter which contained the inspection report and described the apparent violations. The violations appear to indicate a lack of appropriate oversight and control of your brachytherapy program, including a programmatic weakness in the implementation of written directives. Therefore, our letter also informed you that the NRC was considering escalated enforcement action in accordance with its enforcement policy and you were provided an opportunity to address our concerns at a predecisional enforcement conference. In a telephone conversation on January 19, 2005, with Ms. Penny Lanzisera of my staff, your Director of Radiology, Mr. William Reppy, indicated that you would be available to attend a predecisional enforcement conference. On February 16, 2005, a predecisional enforcement conference, open for public observation, was conducted with you and your staff to discuss the apparent violations, their causes, and your corrective actions. At this conference, Mr. Walter Robinson, your consulting Physicist admitted, on your behalf, that the violations occurred, with the exception of one of the twelve apparent violations. After careful consideration of the basis for contesting the apparent violation, the NRC maintains that the violation occurred for the reasons described later in this letter. Collectively, the twelve violations are of concern to the NRC because (1) failure to provide adequate oversight of your radiation protection program could lead to unacceptable safety consequences for patients and members of the public, and (2) inadequate control of your brachytherapy program could result in excessive radiation exposures to individuals. Given that the violations represent a programmatic weakness in the implementation of your brachytherapy program, in general, and the use of written directives, in particular, the violations are categorized as a Severity Level III problem in accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," (Enforcement Policy), NUREG-1600. The NRC is also concerned that the violations were not identified during your audits of the facility. In accordance with the Enforcement Policy, a base civil penalty in the amount of $3,000 is considered for a Severity Level III violation. Because your facility has not been the subject of escalated enforcement action within the last two years or two inspections, the NRC considered whether credit was warranted for Corrective Action in accordance with the civil penalty assessment process in Section VI.C.2 of the Enforcement Policy. Credit for corrective actions is warranted because your corrective actions were considered prompt and comprehensive. These corrective actions included, but were not limited to: (1) discontinuing brachytherapy operations at the hospital effective February 16, 2005; (2) a commitment to immediately submit an amendment request to remove your brachytherapy and radiopharmaceutical therapy programs from your license; (3) implementation of a brachytherapy checklist for the two cases performed since the inspection to ensure that the nurses were trained, the written directives were complete, and surveys were conducted, and; (4) immediately labeling your cesium-137 source storage container. Therefore, to encourage prompt and comprehensive correction of violations, I have been authorized, after consultation with the Director, Office of Enforcement, to issue the enclosed Notice of Violation without a civil penalty for this Severity Level III problem. However, you should be aware that significant violations in the future could result in a civil penalty. In addition, issuance of this Notice constitutes escalated enforcement action that may subject you to increased inspection effort. The apparent violation that you contested involved the failure to adequately calibrate your dose calibrator in accordance with 10 CFR 35.60 and the manufacturer's instructions. The dose calibrator had been calibrated using technetium-99m, principally a gamma emitting isotope. Since a physician prescribed a dosage of phosphorus-32 (P-32), which is a pure beta emitting isotope, for patient treatment, a specific calibration for P-32 should also have been performed. At the enforcement conference, you contested this apparent violation, on the basis that the dose calibrator manufacturer provided an isotope correction factor of 550 (x100) to use to convert the instrument measurement to the proper P-32 activity. After considering the information developed during the inspection, the additional information provided at the enforcement conference, information obtained from the manufacturer during a telephone call on March 25, 2005, and information provided by your staff on March 28, 2005, the NRC has concluded that the dose calibrator was not properly calibrated for P-32. Specifically, the manufacturer’s dose calibrator documentation provided by your staff indicates a calibration setting number of 750 (x100) in Table II, instead of 550 (x100). In addition, the manufacturer’s comments in Table II state that the value is for “estimation use only.” Discussions with the manufacturer confirmed that the manufacturer instructs its clients to perform a specific calibration for P-32 to determine the correction to be applied for P-32 measurements. The specific calibration for P-32 was not performed for your dose calibration, and therefore, a violation occurred. The NRC has concluded that since you are discontinuing your brachytherapy and radiopharmaceutical therapy programs, a response to the violations associated with this program is not required. The information regarding the reasons for the other violations, the corrective actions taken and planned to correct the violations and prevent recurrence, and the date when full compliance was achieved is already adequately addressed on the docket in this letter, in the inspection report issued on January 27, 2005, in the additional information you provided at the February 16, 2005, conference, and in your request to amend your license dated February 18, 2005. Therefore, you are not required to respond to these violations unless the description herein does not accurately reflect your corrective actions or your position. In that case, or if you choose to provide additional information, you should follow the instructions specified in the enclosed Notice. However, as noted at the enforcement conference, if you plan in the future to reinitiate brachytherapy or radiopharmaceutical therapy licensed activities at the hospital, corrective actions for the violations associated with these programs must be addressed in detail prior to approval of the associated license amendment. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosures, and your response (if you choose to provide one) will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC’s document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). To the extent possible, your response should not include any personal privacy, proprietary or safeguards information so that it can be made available to the public without redaction. The NRC also includes significant enforcement actions on its web site at http://www.nrc.gov; select What We Do, Enforcement, then Significant Enforcement Actions.
Docket No. 030-09176 Enclosures:
ENCLOSURE 1 NOTICE OF VIOLATION
Based on an NRC inspection conducted at your facility in Pottsville, Pennsylvania on November 17 and 23, 2004, as well as an in-office review of information you provided to the NRC in letters dated November 29, December 21, 2004, and March 28, 2005, twelve violations of NRC requirements were identified. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," (Enforcement Policy), NUREG-1600, the violations are set forth below:
These violations represent a Severity Level III problem (Supplement VI). The NRC has concluded that information regarding the reasons for the violation, the corrective actions taken and planned to correct the violation and prevent recurrence, and the date when full compliance was achieved is already adequately addressed on the docket in the letter transmitting this Notice, in NRC Inspection Report No. 030-09176/2004-001 issued on January 27, 2005, and during a predecisional enforcement conference conducted on February 16, 2005. However, you are required to submit a written statement or explanation pursuant to 10 CFR 2.201 if the description therein does not accurately reflect your corrective actions or your position. In that case, or if you choose to respond, clearly mark your response as a "Reply to a Notice of Violation, EA 05-005" and send it to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555 with a copy to the Regional Administrator, Region I, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). If you contest the violation, you should also provide a copy of your response, with the basis for your denial, to the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555. If you choose to respond, your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRC’s document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. Therefore, to the extent possible, the response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction. In accordance with 10 CFR 19.11, you may be required to post this Notice within two working days.
|
Privacy Policy |
Site Disclaimer |