Primary Topic: Pavement Maintenance Description: Procedures for permanently patching and for pressure grouting of continuously reinforced concrete pavement have been developed. These procedures have been extensively field tested to ensure their practicality and adequacy. The patching procedures reduce costs and lane closure time by considering the different distress types, different methods of construction, and concrete additive and curing for early opening. The pressure grouting procedures provide for a restoration of support beneath the slab and the prevention of future pumping. FHWA Publication Number: FHWA-IL-UI-191 Publication Year: 1981 Document Links: PDF (file size: 10 mb) PDF files can be viewed with the Acrobat® Reader®
|
||||