Table 4.2.A. Net Energy for Load by North American Electric Reliability Corporation Assessment Area, 1999-2010 Actual

(Thousands of Megawatthours)
Interconnection NERC Regional
Assesment Area
    1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
Eastern
Interconnection
FRCC 188,598 196,561 200,134 211,116 219,021 220,335 226,544 230,115 232,405 226,874 225,966 233,034
NPCC 277,902 281,518 282,670 286,199 288,791 292,725 303,607 294,319 301,766 297,362 285,625 294,276
Balance of
Eastern Region
2,147,860 2,210,739 2,203,509 2,301,321 2,255,233 2,313,180 2,385,461 2,361,721 2,432,475 2,406,730 2,293,617 2,456,553
ECAR 547,846 545,958 546,167 567,897 545,109 553,236 NA NA NA NA NA NA
MAAC 255,741 262,320 263,841 273,907 276,600 283,646 NA NA NA NA NA NA
MAIN 243,278 259,608 271,053 279,264 267,068 274,760 NA NA NA NA NA NA
MAPP NA NA NA NA NA NA NA NA NA NA NA 30,691
MISO NA NA NA NA NA NA NA NA NA NA NA 585,274
MRO 152,350 145,981 144,893 150,058 153,918 152,975 216,633 222,748 217,602 227,536 213,797 NA
PJM NA NA NA NA NA NA NA NA NA NA NA 712,731
RFC NA NA NA NA NA NA 1,005,226 926,279 954,700 936,201 880,377 NA
SERC 768,408 803,211 787,139 835,319 826,964 856,734 962,054 1,011,173 1,049,298 1,035,390 997,142 870,367
SPP 180,237 193,661 190,416 194,876 185,574 191,829 201,548 201,521 210,875 207,603 202,301 257,491
ERCOT TRE 268,622 286,313 278,226 280,269 283,868 289,146 299,225 305,672 307,064 312,401 308,278 319,097
Western
Interconnection
WECC 635,503 663,913 638,746 666,696 664,754 682,053 685,624 720,087 739,018 745,691 718,694 713,177
All
Interconnections
Contiguous
U.S.
3,518,485 3,639,044 3,603,285 3,745,601 3,711,667 3,797,439 3,900,461 3,911,914 4,012,728 3,989,058 3,832,180 4,016,137
Notes:
• NERC region and reliability assessment area maps are provided on EIA's Electricity Reliability web page: http://www.eia.gov/cneaf/electricity/page/eia411/eia411.html
• Peak load represents an hour of a day during the associated peak period.
•Net Energy for Load represents net Balancing Authority Area generation, plus energy received from other Balancing Authority Areas, less energy delivered to other Balancing Authority Areas through interchange.
• Historically the MRO, RFC, SERC, and SPP regional boundaries were altered as utilities changed reliability organizations. The historical dataseries for these regions have not been adjusted. Instead, the Balance of Eastern Region category was introduced to to provide a consistenttrend of the Eastern interconnection.
•ECAR, MAAC, and MAIN dissolved at the end-of-2005. Many of the former utility members joined RFC. Reliability First Corporation (RFC) came into existence on January 1, 2006. RFC submitted a consolidated filing covering the historical NERC regions of ECAR, MAAC, and MAIN.
• NA - Not Available
Source: U.S. Energy Information Administration, Form EIA-411, "Coordinated Bulk Power Supply and Demand Program Report."