Waiver Grant to Allow Annual Inspection of Tower Structure Lighting

Download Options

Release Date: September 20th, 2012

Federal Communications Commission

DA-12-1501


Before the

Federal Communications Commission

Washington, D.C. 20554



In the matter of
)


)

Joint Petition of Diamond Communications LLC,
)

Diamond Towers LLC, Diamond Towers II LLC,
)

and Diamond Towers III LLC for Waiver of
)
47 C.F.R. § 17.47(b)
)

MEMORANDUM OPINION AND ORDER


Adopted: September 20, 2012

Released: September 20, 2012

By the Associate Chief, Wireless Telecommunications Bureau:


I.

INTRODUCTION

1. This Memorandum Opinion and Order addresses the joint petition of Diamond
Communications LLC, Diamond Towers LLC, Diamond Towers II LLC, and Diamond Towers III LLC
(collectively “Diamond”) for waiver of Section 17.47(b) of the Commission’s Rules, 47 C.F.R. §
17.47(b). Section 17.47(b) provides that the owner of any antenna structure that is registered with the
Commission and has been assigned lighting specifications pursuant to Part 17 “[s]hall inspect at intervals
not to exceed 3 months all automatic or mechanical control devices, indicators, and alarm systems
associated with the antenna structure lighting to insure that such apparatus is functioning properly.”1
Diamond estimates that it will spend over $105,000 and over 2,000 person-hours annually complying
with the quarterly inspection requirement for the towers subject to this petition.2
2.
Diamond argues that the quarterly inspections of antenna structure lighting monitoring
systems mandated by Section 17.47(b) of the Rules have been rendered unnecessary for its towers that
employ the Flash Technology Tower Monitoring System (“FTTMS”) because of technological
advancements associated with that system.3 Diamond asks the Commission to waive the rule to permit
annual inspections instead for Diamond’s antenna structures that use this system. For the reasons set
forth below, we grant Diamond its request for relief from its obligations as tower owner under Section
17.47(b) of the Commission’s Rules to perform quarterly inspections of the monitoring systems on these
towers, and instead permit it to perform annual inspections. We further determine, on our own motion,
that we will grant similar waivers to other tower owners using the FTTMS, in an expedited manner, upon
submission and review of a streamlined petition containing certain certifications as described below.

1 47 C.F.R. § 17.47(b).
2 In the matter of Joint Petition of Diamond Communications LLC, Diamond Towers LLC, Diamond Towers II
LLC, and Diamond Towers III LLC for Waiver of 47 C.F.R. § 17.47(b), Petition for Waiver, filed August 15, 2012
(Diamond Waiver Petition) at 3. Diamond Communications LLC and Diamond Towers LLC received a similar
waiver in 2009 for their towers that utilize the TowerSentry Monitoring Systems. See In the matter of TowerSentry
LLC Request for Waiver of 47 C.F.R. § 17.47(b) and Joint Petition of Diamond Communications LLC and Diamond
Towers LLC for Waiver of 47 C.F.R. § 17.47(b), Memorandum Opinion and Order, 24 FCC Rcd 10274 (WTB
2009) (TowerSentry/Diamond Waiver Order).
3 Id.



Federal Communications Commission

DA-12-1501



II.

BACKGROUND

3. The Commission and the Wireless Telecommunications Bureau have previously granted
waivers of Section 17.47(b) to antenna structure owners who demonstrated that they were operating safe
and reliable monitoring systems that provide sufficiently robust monitoring of the control devices,
indicators and alarm systems so as to render quarterly inspections unnecessary.4 The Airspace and Rules
Group of the Federal Aviation Administration has stated that it is not opposed to such waivers “provided
the applicant can demonstrate a safe and reliable automatic monitoring system with tracking mechanisms
to evaluate the remote monitoring technology.”5 Notably, on November 12, 2008, we granted such relief
to Global Tower LLC (“Global Tower”) for towers that it owns based on its use of the FTTMS
technology, which compared favorably with other monitoring systems that had supported previous
waivers.6
4.
Diamond filed its instant waiver petition on August 15, 2012, seeking the same relief
Global Tower was previously granted. Diamond asserts in its petition that it uses the same FTTMS
technology as Global Tower; that this technology is sufficiently robust and reliable to warrant the
granting of its Petition for Waiver; and that it maintains a facility to receive notifications of failures from
the FTTMS, enabling Diamond to carry out its responsibilities under Part 17 of the Commission’s rules.7

III.

DISCUSSION

5.
Section 1.925 of the Commission’s Rules provides that, with respect to wireless
telecommunications services, the Commission may grant a request for waiver if it is shown that: “(i) The
underlying purpose of the rule(s) would not be served or would be frustrated by application to the instant
case, and that a grant of the requested waiver would be in the public interest; or (ii) In view of unique or
unusual factual circumstances of the instant case, application of the rule(s) would be inequitable, unduly
burdensome or contrary to the public interest, or the applicant has no reasonable alternative.”8 As
discussed below, we grant a waiver to Diamond because we find that application of the quarterly
inspection requirements of Section 17.47(b) to the towers in question is not necessary to serve the
underlying purposes of the rule, and grant of the waiver is in the public interest. Based on the evidence
presented, strict application of the rule to Diamond would be unduly burdensome and contrary to the
public interest.
6.
As noted above, Global Tower LLC has previously been granted a waiver for towers it
owns that are monitored by the FTTMS because this monitoring system was deemed to “provide
sufficiently robust monitoring of the control devices, indicators and alarm systems so as to render
quarterly inspections unnecessary.”9 For the reasons cited by the Bureau in the Global Tower Waiver
Order
, 10 we conclude, based upon the uncontested evidence submitted in the record by Diamond, that the

4 See e.g., In the Matter of Requests of American Tower Corporation and Global Signal, Inc., to Waive Section
17.47(b) of the Commission’s Rules, WT Docket No. 05-326, Memorandum Opinion and Order, 22 FCC Rcd 9743
(2007); Petition of Optasite Towers L.L.C. for Waiver of Section 17.47(b) of the Commission’s Rules,
Memorandum Opinion and Order, 22 FCC Rcd 18456 (WTB 2007).
5 Brief Comment of Office of Airspace and Rules, FAA, WT Docket No. 05-326, filed December 4, 2006.
6 In the Matter of Request of Global Tower LLC for Waiver of 47 C.F.R. § 17.47(b), Memorandum Opinion and
Order
, 23 FCC Rcd 16531 (WTB 2008) (Global Tower Waiver Order).
7 Diamond Waiver Petition at 1-3, 5, Attachment.
8 47 C.F.R. § 1.925(b)(3).
9 Global Tower Waiver Order at 5.
10 Id. at 2-5.
2


Federal Communications Commission

DA-12-1501



Diamond Waiver Petition establishes that quarterly inspections are unnecessary for those Diamond towers
monitored by the FTTMS, and we therefore grant Diamond’s waiver petition.
7.
We further determine, on our own motion, that for other tower owners using the FTTMS,
we will grant, in an expedited manner, waivers upon submission and review of a streamlined petition
containing certain certifications. Specifically, any waiver applicant shall submit a certification that: (1) its
towers are monitored by the FTTMS under the process described in the Global Tower Waiver Order;11
and (2) it maintains a facility to receive notifications of failures from the FTTMS, which will enable the
tower owner to carry out its responsibilities under Part 17 of the Commission’s rules.12 We find the latter
certification necessary to ensure that tower owners receiving waivers remain equipped to comply with the
Commission’s regulations. The certification shall be signed, under penalty of perjury, by a company
officer (or partner, sole proprietor or similar person able to act on behalf of the tower owner) with
knowledge of the underlying facts. In the event a lessee or other designee actually receives and responds
to notifications of failure, both the tower owner and the lessee/designee should submit certifications
attesting to the facts within their knowledge. To ensure timely processing, waiver requests should be e-
mailed to part17@fcc.gov.

IV.

CONCLUSION

8.
For the reasons discussed above, we waive Section 17.47(b) to allow Diamond, for its
towers monitored using the FTTMS, to conduct inspections required by that section on an annual, rather
than a quarterly, basis. We further establish an expedited process for other users of the FTTMS to obtain
similar waivers. The FTTMS reliably diagnoses problems, including any failures of control devices,
indicators and alarm systems, within real time, and therefore renders strict application of the rule
unnecessary to serve its underlying purpose. Moreover, our action will relieve Diamond and potentially
other users of the FTTMS of the burden of performing unnecessary quarterly inspections. In addition,
granting Diamond a waiver, as well as implementing an expedited waiver process for other tower owners
that employ the FTTMS, will further encourage tower owners to invest in state-of-the-art technologies so
that they too will become capable of continuous monitoring of both their lighting systems and control
devices.
9.
We note that the Commission has released a Notice of Proposed Rulemaking seeking
comment on proposed changes to part 17 of the Commission’s rules and this determination is subject to
any rule changes that the Commission may promulgate in that proceeding.13

11 Id. at 3-4.
12 See TowerSentry/Diamond Waiver Order, 24 FCC Rcd at 10279; In the matter of Request of Mobilitie, LLC for
Waiver of 47 C.F.R. § 17.47(b) and Flash Technology Request for Waiver of 47 C.F.R. § 17.47, Memorandum
Opinion and Order
, 24 FCC Rcd 11949, 11952 (WTB 2009).
13 In the Matter of Amendments to Modernize and Clarify Part 17 of the Commission’s Rules Concerning
Construction, Marking and Lighting of Antenna Structures, RM 11349, Notice of Proposed Rulemaking, 25 FCC
Rcd 3982, 75 FR 28517 (2010).
3


Federal Communications Commission

DA-12-1501



V.

ORDERING CLAUSE

10.
Pursuant to Sections 4(i), 303(q), and 303(r) of the Communications Act of 1934, as
amended, 47 U.S.C. §§ 154(i), 303(q), 303(r), and pursuant to Sections 0.131, 0.331, and 1.925 of the
Commission’s Rules, 47 C.F.R. §§ 0.131, 0.331, 1.925, the Petition for Waiver filed by Diamond IS
GRANTED.

FEDERAL COMMUNICATIONS COMMISSION




Jane
E.
Jackson
Associate Chief, Wireless Telecommunications Bureau
4

Note: We are currently transitioning our documents into web compatible formats for easier reading. We have done our best to supply this content to you in a presentable form, but there may be some formatting issues while we improve the technology. The original version of the document is available as a PDF, Word Document, or as plain text.

close
FCC

You are leaving the FCC website

You are about to leave the FCC website and visit a third-party, non-governmental website that the FCC does not maintain or control. The FCC does not endorse any product or service, and is not responsible for, nor can it guarantee the validity or timeliness of the content on the page you are about to visit. Additionally, the privacy policies of this third-party page may differ from those of the FCC.