Power Reactors (Division 1): Regulatory Guides 1.101 - 1.120
This page lists the number, title, publication date, and revisions for each regulatory guide in Division 1, "Power Reactors," with references to draft guides and related documents (where applicable).
See also Draft Regulatory Guides for Division 1.
See NRC Regulatory Guides for more general information.
Reviewed (last column on table) means that the NRC has reviewed these guides and has determined that they are acceptable for continued use. The NRC encourages comments from stakeholders on any Regulatory Guide at any time. Comments received in this manner will be reviewed upon receipt, but will be fully evaluated during the next periodic review of the affect guides. Currently, Regulatory Guides are reviewed on a 5 year basis. In certain cases, a Regulatory Guide will be looked at before the 5 year period has passed.
Guide Number |
Title | Rev. | Publish Date |
Reviewed |
---|---|---|---|---|
1.101 |
Emergency Planning and Preparedness for Nuclear Power Reactors | 5 | 06/2005 | |
4 | 07/2003 | |||
3 | 08/1992 | |||
2 | 10/1981 | |||
1 | 03/1977 | |||
-- | 11/1975 | |||
1.102 | Flood Protection for Nuclear Power Plants | 1 | 09/1976 | |
-- | 10/1975 | |||
1.103 | Post-tensioned Prestressing Systems for Concrete Reactor and Containment (Withdrawn -- See 46 FR 37579, 07/21/1981) |
W | 07/1981 | |
1.104 | Overhead Crane Handling Systems for Nuclear Power Plants (Withdrawn -- See 44 FR 49321, 07/27/1981) |
W | 07/1981 | |
1.105 |
Setpoints for Safety-Related Instrumentation | 3 | 12/1999 | |
2 | 02/1986 | |||
1 | 11/1976 | |||
-- | 11/1975 | |||
1.106 | Thermal Overload Protection for Electric Motors on Motor-Operated Valves | 2 1 |
02/2012 03/1977 |
|
-- | 11/1975 | |||
1.107 | Qualifications for Cement Grouting for Prestressing Tendons in Containment Structures | 2 | 06/2011 | |
1 | 02/1977 | |||
-- | 11/1975 | |||
1.108 | Periodic Testing of Diesel Generator Units Used as Onsite Electric Power Systems at Nuclear Power Plants (Withdrawn -- See 58 FR 41813, 08/5/1993) |
W | 08/1993 | |
1 | 08/1977 | |||
1.109 | Calculation of Annual Doses to Man from Routine Releases of Reactor Effluents for the Purpose of Evaluating Compliance with 10 CFR Part 50, Appendix I | 1 | 10/1977 | |
-- | 03/1976 | |||
1.110 | Cost-Benefit Analysis for Radwaste Systems for Light-Water-Cooled Nuclear Power Reactors (for Comment) | -- | 03/1976 | |
1.111 |
Methods for Estimating Atmospheric Transport and Dispersion of Gaseous Effluents in Routine Releases from Light-Water-Cooled Reactors | 1 | 07/1977 | |
-- | 03/1976 | |||
1.112 |
Calculation of Releases of Radioactive Materials in Gaseous and Liquid Effluents from Light-Water-Cooled Power Reactors | 1 | 03/2007 | |
0-R | 05/1977 | |||
-- | 04/1976 | |||
1.113 | Estimating Aquatic Dispersion of Effluents from Accidental and Routine Reactor Releases for the Purpose of Implementing Appendix I | 1 | 04/1977 (2.18MB) |
|
-- | 05/1976 | |||
1.114 | Guidance to Operators at the Controls and to Senior Operators in the Control Room of a Nuclear Power Unit | 3 | 10/2008 | |
2 | 05/1989 | |||
1 | 11/1976 | |||
-- | 02/1976 | |||
1.115 | Protection Against Low-Trajectory Turbine Missiles | 2 | 01/2012 | |
1 | 07/1977 | |||
-- | 03/1976 | |||
1.116 | Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems (Withdrawn -- See 75 FR 54921, 09/09/2010) |
W | 09/2010 | |
0-R | 05/1977 | |||
-- | 06/1976 | |||
1.117 | Tornado Design Classification | 1 | 04/1978 | |
-- | 06/1976 | |||
1.118 | Periodic Testing of Electric Power and Protection Systems | 3 | 04/1995 | |
2 | 06/1978 | |||
1 | 11/1977 | |||
-- | 06/1976 | |||
1.119 | Surveillance Program for New Fuel Assembly Designs (Withdrawn -- See 42 FR 33387, 06/30/1977) |
W | 06/1977 | |
1.120 | Fire Protection Guidelines for Nuclear Power Plants (Withdrawn 08/1/2001) |
W | 08/2001 | |
1 | 11/1977 | |||
-- | -- |