Fermi National Laboratory

Operation Terminology

Shot Setup

During any shot setup for either the Tevatron or the Recycler, the Switchyard beam gets halted due to the Main Injector's need to focus on the beam transfers.

last modified 6/22/2005   email Fermilab
Security, Privacy, LegalFermi National Accelerator Laboratory